PlanningRegister.ie
Planning report · Wicklow County Council · 500 m around the house · the last 12 months · 20 Oct 2026, 03:45

Saint Patrick's Avenue

52.97724, -6.04846

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Ballynerrin LowerBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2017: 2 files on Ballynerrin Lower2018: 1 file on Ballynerrin Lower2019: 1 file on Ballynerrin Lower2020: 2 files on Ballynerrin Lower2021: 1 file on Ballynerrin Lower2024: 1 file on Ballynerrin Lower2025: 2 files on Ballynerrin Lower10 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities of existing residential areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

wicklow town rathnew local area plan · 23 Jun 2025 – 23 Jun 2031

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Wicklow (845 m); Wicklow Port Company (904 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings7post box; house
Radon grid squares1
Monuments5R148686; R148694
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 11 on the draft 2027 map; 10 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, EPA radon map, Sites and Monuments Record · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 94–100% by type. A new house in a garden is harder: 90% approved, and 1 in 3 is asked for more information.

Single-storey rear25 decided · more info asked 20%
96% · council 96%
Two-storey rear16 decided · more info asked 50%
94% · council 91%
Single-storey side14 decided · more info asked 14%
100% · council 97%
Attic or dormer35 decided · more info asked 23%
94% · council 92%
First-floor13 decided · more info asked 15%
100% · council 90%
Porch or front11 decided · more info asked 0%
100% · council 94%
New house in a garden or site29 decided · more info asked 31%
90% · council 81%
Approved nearbyWicklow overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 143 nearby, 3,368 council-wide

Figure 3

Ballynerrin Lower, file by file since 2017

1 of 1 decided extensions on the road were approved.

10 planning files on Ballynerrin Lower since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2021 · attic conversion / dormer · approved · 2158Porches, roofs, otherNo number · 2017 · other work · approved · 171454No number · 2017 · other work · approved · 1795No number · 2018 · other work · approved · 18253No number · 2019 · other work · refused · 19397No number · 2020 · other work · approved · 201121No number · 2020 · other work · approved · 201296No number · 2024 · other work · approved · 24263No number · 2025 · other work · approved · 25108No number · 2025 · other work · approved · 2560733New house in a side garden
ApprovedRefusedWithdrawn or invalid

10 files with "Ballynerrin Lower" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 no decision or withdrawn
KindAppliedApprovedRefused
Rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 49 days. 1 in 4 is asked for more information, which adds about 52 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; If more info asked (1 in 4): 102 days; Appeal window: 4 weeks; Building starts: 112 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 46–54 (n=137)49 daysIf more info asked (1 in 4)With further information: median 102 days (n=42)102 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 112 days after permission (n=66)112 days after permissionSigned off514 days after the start, for the few who file. 62% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated179 decided home extensions, 66 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    7 of 15 appealed refusals became permissions. 0 of 16 appealed approvals were reversed.

    Refusals appealed15 decided
    7 became permissions
    Approvals appealed16 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501303 Pending · St Patrick's Road , Marlton Road and Abbey Street , Wicklow Town · 207 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher20 Oct 2026, 01:39open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 4

    What's changing around you?

    Street map around Saint Patrick's Avenue with 15 numbered planning items
    ⌖ the houseWindow closingEmpty land zoned for homesNo decision yetApproved
    1. 119 Saint Patricks Road, Wicklow Town 2660271Approved with conditions · 61 m
    2. 2No. 1 St. Manntans Road, Wicklow Town 26183Refused · 431 m
    3. 30.4 ha zoned for homesEmpty land zoned for homes · 210 m
    4. 40.2 ha zoned for homesEmpty land zoned for homes · 239 m
    5. 50.6 ha zoned for homesEmpty land zoned for homes · 288 m
    6. 60.4 ha zoned for homesEmpty land zoned for homes · 305 m
    7. 70.5 ha zoned for homesEmpty land zoned for homes · 404 m
    8. 80.4 ha zoned for homesEmpty land zoned for homes · 414 m
    9. 9“Bunowen” St Patrick’s Road, Wicklow Town 2660603No decision yet · 166 m
    10. 1025 Kilmantin Road, Wicklow Town 2646Approved with conditions · 310 m
    11. 1125 Kilmantin Road, Wicklow Town 26176Approved with conditions · 314 m
    12. 12No. 10 Halpin Court, Wicklow Town 2660225Approved with conditions · 315 m
    13. 133 St. Manntans Road, Wicklow Town 25340Approved with conditions · 408 m
    14. 142 Saint Manntan's Road, Wicklow Town 2628Approved with conditions · 420 m
    15. 15Ballyguile More, Wicklow Town 26139No decision yet · 440 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 74 permissions since 2016, 27 show a start notice and 2 have a completion certificate. Most owners opt out of sign-off.

    83 applications lodged within 500 m. Council: 72 approved, 11 refused. After appeals: 74 approved. Of those: 2 signed off, 19 built with the owner's opt-out, 6 started, 23 with no start notice found, 24 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT72: lodged → approved11: lodged → refused72: approved → approved9: refused → refused2 refused by the council, approved after an appeal23: approved → no start notice found19: approved → built, owner opted out6: approved → started, not signed off2: approved → signed off24: approved → ran out83 lodged83 lodged72 approved72 approved11 refused11 refused74 approved74 approved9 refused9 refused23 no start notice found23 no start notice found19 built, owner opted out19 built, owner opted out6 started, not signed off6 started, not signed off2 signed off2 signed off24 ran out24 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured83 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 5 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-05 2660271: CONDITIONAL — garage and outbuilding; 2026-11-10 26183: REFUSED — the provision of a balcony at first floor level along with alterations to East Elevation and all ancillary site works antoday25 Oct30 Oct4 Nov9 Nov14 Nov19 Nov2660271: CONDITIONAL — garage and outbuilding · 61 m away · 2026-11-0526183: REFUSED — the provision of a balcony at first floor level along with alterations to East Elevation and all ancillary site works an · 431 m away · 2026-11-10
    Time to appeal ends
    • Time to appeal ends 5 Nov 202616 days left
      12660271 · CONDITIONAL — garage and outbuilding
      €220 to An Coimisiún Pleanála (€110 observer) · 61 m away
    • Time to appeal ends 10 Nov 202621 days left
      226183 · REFUSED — the provision of a balcony at first floor level along with alterations to East Elevation and all ancillary…
      €220 to An Coimisiún Pleanála (€110 observer) · 431 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 10 within 500 m

    Empty land zoned for homes 10

    • 30.4 ha zoned for homes · no homes built on it yet · 210 m
    • 40.2 ha zoned for homes · no homes built on it yet · 239 m
    • 50.6 ha zoned for homes · no homes built on it yet · 288 m
    • 60.4 ha zoned for homes · no homes built on it yet · 305 m
    • 70.5 ha zoned for homes · no homes built on it yet · 404 m
    • 80.4 ha zoned for homes · no homes built on it yet · 414 m
    • 0.9 ha zoned for homes · no homes built on it yet · 439 m
    • 0.4 ha zoned for homes · no homes built on it yet · 463 m
    • 3.7 ha zoned for homes · no homes built on it yet · 474 m
    • 0.6 ha zoned for homes · no homes built on it yet · 483 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 8

    Applications within 500 m, by year

    Between 1 and 12 a year; busiest 2018. 87% of decisions were approvals.

    2017: 12, 2018: 12, 2019: 12, 2020: 4, 2021: 10, 2022: 1, 2023: 10, 2024: 8, 2025: 8, 2026: 6051015202017: 11 approved2017: 1 refused12’17*2018: 11 approved2018: 1 refused12’182019: 11 approved2019: 1 refused12’192020: 3 approved2020: 1 refused4’202021: 9 approved2021: 1 refused10’212022: 1 approved1’222023: 9 approved2023: 1 refused10’232024: 5 approved2024: 3 refused8’242025: 7 approved2025: 1 refused8’252026: 5 approved2026: 1 refused6’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 12 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Building work nearby 5 in the last 12 months
    1 not signed off4 no sign-off needed
    • 2 Saint Manntans's Road, Wicklow, A67 FK80 · 20 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 26/28 · 435 m
    • 25 Kilmantin Road, Wicklow, A67 DE68 · 6 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 26/46 · 325 m
    • Fitzwilliam Square, Wicklow · 2 Jul 2026 · 8 homes · start notice not signed off · 23/806 · 482 m
    • 3 Saint Manntans's Road, Wicklow, A67 NW10 · 24 Jun 2026 · start notice, opted out no sign-off needed · 25340 · 423 m
    • 102 Mount Carmel Avenue, Wicklow, A67 X296 · 20 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 2560825 · 274 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 20 Oct 2026, 01:45
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Jellytots Pre School · Crèche17 Sept 2025 · report · Tusla Early Years Inspectorate42 m
    Postman Pats Playgroup · Crèche8 Dec 2025 · report · Tusla Early Years Inspectorate82 m
    Buttons Preschool Maria Forsyth · Crèche11 May 2026 · report · Tusla Early Years Inspectorate94 m
    Balloons Pre-School · Crèche12 Jan 2026 · report · Tusla Early Years Inspectorate94 m
    Dee's Montessori Pre-school · Crèche10 Feb 2025 · report · Tusla Early Years Inspectorate177 m
    The Little Rascals Pre-school Wicklow · Crèche21 Nov 2024 · report · Tusla Early Years Inspectorate287 m
    A Place to Grow Montessori · Crèche1 Dec 2025 · report · Tusla Early Years Inspectorate434 m
    The Cave Preschool · Crèche8 Apr 2025 · report · Tusla Early Years Inspectorate629 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Wicklow County Council.
    Homes approved
    Here134
    Council middle0
    Homes started
    Here111
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    73% owner-occupied (council 71%).

    Homes built before 1971
    32% · council 26%
    Homes built since 2001
    1% · council 32%
    Owner-occupied
    73% · council 71%
    Rented
    22% · council 24%
    Children under 15
    17% · council 21%
    Aged 65 and over
    28% · council 15%
    Households with 2+ cars
    34% · council 48%
    Work mainly from home
    6% · council 14%
    This small area (294 people)Wicklow

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 257078012

    Bus
    302 m
    Grand Hotel · 131, 133, 740A · busiest stop within 500 m: 3 an hour at peak
    Nearest school
    172 m
    Padraig Naofa NS, 377 pupils
    Homes sold nearby
    254
    in 3 years, 112 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Padraig Naofa NS · primary · 377 pupils · 172 m
    • Scoil An Choroin Mhuire · primary · 432 pupils · 574 m
    • Wicklow Educate Together Secondary School · postprimary · 404 pupils · 594 m
    • Dominican College · postprimary · 461 pupils · 604 m
    • Glebe Ns · primary · 210 pupils · 645 m

    Stops 13

    • Grand Hotel · 131, 133, 740A, UM11 · 3/hour at peak · 302 m
    • Grand Hotel · 131, 133, 740, 740A, UM11 · 2/hour at peak · 366 m
    • Convent Road · 131, 133, 183 · 3/hour at peak · 491 m
    • Convent Road · 131, 133, 183 · 2/hour at peak · 492 m
    • Wicklow Village · 183 · 1/hour at peak · 512 m
    • Wicklow Village · 183 · 1/hour at peak · 537 m
    • Rose Hill · 131, 133, 183 · 2/hour at peak · 557 m
    • Bollarney South · 131, 133, 183, BR01 · 2/hour at peak · 567 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Padraig Naofa NS · 172 m+2.2% pupils (377)
    • Scoil An Choroin Mhuire · 574 m+1.6% pupils (432)
    • Wicklow Educate Together Secondary School · 594 m+7.7% pupils (404)
    • Dominican College · 604 m-2.5% pupils (461)
    • Glebe Ns · 644 m+1.4% pupils (210)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 20 Oct 2026, 02:32
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Council consultation portalsPublic20 Oct 2026, 01:41open
    Council meetings (ModernGov)Public20 Oct 2026, 02:32open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Decision 61 m away can be appealed until 5 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Ballynerrin Lower
    Electoral division
    Wicklow Urban
    Electoral area
    Wicklow
    Council
    Wicklow County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 10 sites nearby could change: 10 empty zoned plots.
    • Grand Hotel (bus 131, 133) 302 m away: 3 an hour at morning peak; 10 from all stops within 500 m.
    • Here (2022 census): 73% owner-occupied (council 71%); 2% of homes empty (council 7%); most built 1971–1980; 64% drive to work (council 58%); population up 5% since 2016.
    • 1 home extension within 250 m since 2026.
    • Around here the council decides in a median 56 days (about 8 weeks); 41% are asked for more information.
    • Homes started within 1 km: 26 in the last year, 11 three years before.
    • 12 applications nearby in the last 12 months; 88% approved (council 86%).
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.020 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public20 Oct 2026
    www2.courts.ie—© the publisher20 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public20 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.020 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence20 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    water.ie—© the publisher · flag only—
    water.ie—© the publisher · flag only—
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 20 Oct 2026, 03:45 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.