Homes here mostly date from the 1980s. 1 planning file on this house, the latest from 2026. Home extensions nearby almost always get approved (94%). 61 homes approved 269 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 2 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992). 1 planning file on this house, the latest from 2026.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BallinaleaBuilt: most homes in this small area date from 1981–1990 (census estimate)most built2026: 2660258 · new house, approved2021: 3 files on Ballinalea2023: 1 file on Ballinalea2024: 7 files on Ballinalea2025: 2 files on Ballinalea2026: 4 files on Ballinalea17 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    2660258 · new house · approved 2026 · not started, runs out 2031
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities of existing residential areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

ashford town plan · 23 Oct 2022 – 23 Oct 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings2Mountusher House
Radon grid squares2
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 8 on the draft 2027 map; 8 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 62% approved, and 1 in 3 is asked for more information.

Attic or dormer12 decided · more info asked 17%
100% · council 92%
New house in a garden or site13 decided · more info asked 31%
62% · council 82%
Approved nearbyWicklow overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 25 nearby, 1,414 council-wide

Figure 3

Ballinalea, file by file since 2021

7 of 8 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

17 planning files on Ballinalea since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 52 · 2021 · two-storey side · approved · 211030No. 21 · 2021 · rear · approved · 21842No. 4 · 2024 · other extension · refused · 24268No number · 2024 · attic conversion / dormer · approved · 24366No. 5 · 2024 · single-storey rear · approved · 2460350No. 4 · 2024 · attic conversion / dormer · approved · 2460449No number · 2025 · single-storey rear · approved · 2560157No number · 2026 · attic conversion / dormer · approved · 2660767Porches, roofs, otherNo number · 2021 · other work · approved · SH202101No number · 2023 · other work · approved · 2360242No. 3 · 2024 · other work · refused · 24269No. 3 · 2024 · other work · approved · 24362No. 8 · 2024 · other work · approved · 2460242No. 4 · 2025 · other work · approved · 2560223No number · 2026 · other work · approved · 2660258No number · 2026 · other work · approved · 2660290New house in a side gardenNo number · 2026 · new house · approved · 2660470
ApprovedRefusedWithdrawn or invalid

17 files with "Ballinalea" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

2 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic32—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 49 days. 1 in 3 is asked for more information, which adds about 74 days. Building starts about 2 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; If more info asked (1 in 3): 124 days; Appeal window: 4 weeks; Building starts: 64 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 43–50 (n=24)49 daysIf more info asked (1 in 3)With further information: median 124 days (n=12)124 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 64 days after permission (n=12)64 days after permissionSigned off33% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated36 decided home extensions, 12 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    3 of 5 appealed refusals became permissions. 0 of 7 appealed approvals were reversed.

    Refusals appealed5 decided
    3 became permissions
    Approvals appealed7 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501622 Open · Mount Alto , Ashford , Co. Wicklow · 248 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher26 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 4

    What's changing around you?

    Street map around Woodview with 14 numbered planning items
    ⌖ the houseOpen for commentsWindow closingEmpty land zoned for homesApprovedNo decision yet
    1. 1No. 1 Ballinalea, Ashford 26204No decision yet · 233 m
    2. 2Townland of Ballinalea Ashford Co. Wicklow, located south of the L1096 north of the Ashford Oaks and 2660290Approved with conditions · 27 m
    3. 3Ballinalea, Ashford 2660767Approved with conditions · 93 m
    4. 40.2 ha zoned for homesEmpty land zoned for homes · 111 m
    5. 53.0 ha zoned for homesEmpty land zoned for homes · 244 m
    6. 62.0 ha zoned for homesEmpty land zoned for homes · 357 m
    7. 70.5 ha zoned for homesEmpty land zoned for homes · 386 m
    8. 80.3 ha zoned for homesEmpty land zoned for homes · 437 m
    9. 90.8 ha zoned for homesEmpty land zoned for homes · 456 m
    10. 10Lands at Ballinalea, Ashford 2660258Approved with conditions · 7 m
    11. 1110 Mount Usher Glade, Ashford 2561026Approved with conditions · 142 m
    12. 12The Woodpecker Pub, Ashford 26180No decision yet · 164 m
    13. 13Tree Tops, Ballymacahara 26192No decision yet · 237 m
    14. 14Mount Alto, Ashford 2560881Approved with conditions · 248 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 26 permissions since 2016, 5 show a start notice and 1 has a completion certificate.

    29 applications lodged within 500 m. Council: 25 approved, 4 refused. After appeals: 26 approved. Of those: 1 signed off, 2 built with the owner's opt-out, 2 started, 20 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT25: lodged → approved4: lodged → refused25: approved → approved3: refused → refused1 refused by the council, approved after an appeal20: approved → no start notice found2: approved → built, owner opted out2: approved → started, not signed off1: approved → signed off1: approved → ran out29 lodged29 lodged25 approved25 approved4 refused4 refused26 approved26 approved3 refused3 refused20 no start notice found20 no start notice found2 built, owner opted out2 built, owner opted out2 started, not signed off2 started, not signed off1 signed off1 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured29 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    3 deadlines within 500 m; the first closes 4 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-04 26204: application received — dwelling as constructed; 2026-11-05 2660290: CONDITIONAL — construction of an 87 no. unit residential development comprising 61 no. houses (4 no. detached and semi-detached two be; 2026-11-06 2660767: CONDITIONAL — to erect a dormer type dwelling and new entrance along with all associated site development works and connect to existintoday1 Nov6 Nov11 Nov16 Nov21 Nov26 Nov26204: application received — dwelling as constructed · 233 m away · 2026-11-042660290: CONDITIONAL — construction of an 87 no. unit residential development comprising 61 no. houses (4 no. detached and semi-detached two be · 27 m away · 2026-11-052660767: CONDITIONAL — to erect a dormer type dwelling and new entrance along with all associated site development works and connect to existin · 93 m away · 2026-11-06
    Comments closeTime to appeal ends
    • Comments close 4 Nov 20268 days left
      126204 · application received — dwelling as constructed
      €20 to the council · 233 m away
    • Time to appeal ends 5 Nov 20269 days left
      22660290 · CONDITIONAL — construction of an 87 no. unit residential development comprising 61 no. houses (4 no. detached and…
      €220 to An Coimisiún Pleanála (€110 observer) · 27 m away
    • Time to appeal ends 6 Nov 202610 days left
      32660767 · CONDITIONAL — to erect a dormer type dwelling and new entrance along with all associated site development works and…
      €220 to An Coimisiún Pleanála (€110 observer) · 93 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    61 homes 269 m away were approved Oct 2026 with no start notice yet; the permission runs to Oct 2031.

    Ballinalea Ashford Co.… · 61 homes: 61 homes approved Oct 2026, not started202420252026202720282029203020312032Ballinalea Ashford Co.… · 61 homes269 m · 266029061 homes approved Oct 2026, not started61 homes approved Oct 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 7 within 500 m

    Approved, not started 1

    Empty land zoned for homes 6

    • 40.2 ha zoned for homes · no homes built on it yet · 111 m
    • 53.0 ha zoned for homes · no homes built on it yet · 244 m
    • 62.0 ha zoned for homes · no homes built on it yet · 357 m
    • 70.5 ha zoned for homes · no homes built on it yet · 386 m
    • 80.3 ha zoned for homes · no homes built on it yet · 437 m
    • 90.8 ha zoned for homes · no homes built on it yet · 456 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 3 and 10 a year; busiest 2024. 86% of decisions were approvals.

    2021: 5, 2022: 4, 2023: 3, 2024: 10, 2025: 4, 2026: 305102021: 5 approved5’21*2022: 3 approved2022: 1 refused4’222023: 3 approved3’232024: 7 approved2024: 3 refused10’242025: 4 approved4’252026: 3 approved3’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 10 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Building work nearby 1 in the last 12 months
    1 signed off as finished
    • Unit 4, Mount Usher Court, Ashford, Wicklow, A67 PN59 · 7 Aug 2026 · start notice signed off · 25/60989 · 361 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Homes coming 61 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Early Days Montessori School · Crèche29 Apr 2025 · report · Tusla Early Years Inspectorateapprox. 561 m
    Willow House Childcare · Crèche8 Oct 2025 · report · Tusla Early Years Inspectorateapprox. 561 m
    Ashford Montessori School · Crèche24 Feb 2025 · report · Tusla Early Years Inspectorate890 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Wicklow County Council.
    Homes approved
    Here199
    Council middle0
    Homes started
    Here120
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    6% of homes built before 1971 (council 26%). 53% owner-occupied (council 71%).

    Homes built before 1971
    6% · council 26%
    Homes built since 2001
    17% · council 32%
    Owner-occupied
    53% · council 71%
    Rented
    43% · council 24%
    Children under 15
    20% · council 21%
    Aged 65 and over
    10% · council 15%
    Households with 2+ cars
    36% · council 48%
    Work mainly from home
    8% · council 14%
    This small area (339 people)Wicklow

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 257038004

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    235 m
    Ballinalea · 131, 133, 183 · busiest stop within 500 m: 3 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Homes sold nearby
    7
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    None nearby.

      Stops 4

      • Ballinalea · 131, 133, 183 · 3/hour at peak · 235 m
      • Ballinalea · 131, 133, 183 · 2/hour at peak · 271 m
      • Ashford · 131, 133, 183 · 3/hour at peak · 700 m
      • Ashford · 131, 133, 183 · 2/hour at peak · 763 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 27 Oct 2026, 01:57
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Council consultation portalsPublic27 Oct 2026, 00:57open
      Council meetings (ModernGov)Public27 Oct 2026, 01:57open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. New house (2660258) approved 2026, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      2. Application 233 m away open for comments until 4 Nov 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      3. Decision 27 m away can be appealed until 5 Nov 2026: appeal?
        Ask for: The decision on the council's website (€220 to appeal).
        Council
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Ballinalea
      Electoral division
      Glenealy
      Electoral area
      Wicklow
      Council
      Wicklow County Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest 2660258, approved 2026, not started, runs out 2031.
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 7 sites nearby could change: 1 approved scheme, 6 empty zoned plots.
      • 1 application open for comments nearby; nearest closes 4 Nov 2026.
      • 61 homes approved nearby, not started; largest 61 at Ballinalea Ashford Co. Wicklow.
      • Ballinalea (bus 131, 133) 235 m away: 3 an hour at morning peak; 6 from all stops within 500 m.
      • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 53% owner-occupied (council 71%); 7% of homes empty (council 7%); most built 1981–1990; 71% drive to work (council 58%); population up 5% since 2016.
      What the terms mean 8 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.027 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public27 Oct 2026
      www2.courts.ie—© the publisher26 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public27 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.027 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence27 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 27 Oct 2026, 19:47 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.