PlanningRegister.ie
Planning report · Laois County Council · 500 m around the house · the last 12 months · 19 Oct 2026, 10:09

The Glebe, Stradbally ED, The Municipal District of Graiguecullen — Portarlington, County Laois, Leinster, Éire / Ireland

53.01640, -7.13994

Homes here mostly date from the 2000s.

See on the mapWatch this area

Not held yet for Laois County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of StradballyBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2017: 3 files on Stradbally2018: 4 files on Stradbally2019: 2 files on Stradbally2020: 2 files on Stradbally2021: 4 files on Stradbally2022: 4 files on Stradbally2024: 3 files on Stradbally2025: 5 files on Stradbally27 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Residential 1 - Existing Residential: To protect and enhance the amenity of developed residential communities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

laois county development plan 2021 2027 · 8 Mar 2022 – 7 Mar 2028

ZoningR2 · Existing residential
What it says

Residential 1 - Existing Residential: To protect and enhance the amenity of developed residential communities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

laois county development plan 2021 2027 including ministerial direction as varied by variation no 1 no 2 and no 3 · 8 Mar 2022 – 7 Mar 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Stradbally Agglomeration (318 m)

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings6The Old Rectory; Daniel Dunne
Monuments5Religious house - Franciscan friars; Bawn
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 16 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed facilities (LEAP)CC BY 4.012 Oct 2026, 23:31open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 82% approved, and 1 in 2 are asked for more information.

New house in a garden or site11 decided · more info asked 55%
82% · council 91%
Approved nearbyLaois overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 11 nearby, 1,497 council-wide

Figure 3

Stradbally, file by file since 2017

12 of 12 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

27 planning files on Stradbally since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo. 36 · 2017 · single-storey side · approved · 17310No. 20 · 2017 · two-storey rear · approved · 17641No number · 2018 · other extension · approved · 1842No number · 2018 · attic conversion / dormer · approved · 18751No number · 2019 · other extension · approved · 19617No number · 2020 · other extension · approved · 20567No. 14 · 2021 · single-storey rear · approved · 21594No number · 2022 · two-storey rear · approved · 2246No number · 2024 · single-storey rear · approved · 2460478No number · 2025 · rear · approved · 2560021No. 10 · 2025 · rear · approved · 2560655No number · 2025 · attic conversion / dormer · approved · 2560837Porches, roofs, otherNo number · 2017 · other work · approved · 17403No number · 2018 · other work · approved · 18245No number · 2018 · other work · approved · 18301No number · 2019 · other work · approved · 19652No number · 2020 · other work · approved · 2086No number · 2021 · other work · approved · 2133No number · 2021 · other work · approved · 21441No number · 2021 · other work · approved · 21821No number · 2022 · other work · approved · 22314No. 50 · 2022 · other work · approved · 22430No number · 2022 · other work · approved · 22459No number · 2024 · other work · approved · 2444No number · 2024 · other work · approved · 2460219No number · 2025 · other work · approved · 2560285New house in a side gardenNo number · 2025 · new house · approved · 2560686
ApprovedRefusedWithdrawn or invalid

27 files with "Stradbally" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days. 1 in 3 is asked for more information, which adds about 81 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 3): 130 days; Appeal window: 4 weeks; Building starts: 168 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 49–52 (n=17)51 daysIf more info asked (1 in 3)With further information: median 130 days (n=8)130 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 168 days after permission (n=11)168 days after permissionSigned off91% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated25 decided home extensions, 11 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around The Glebe, Stradbally ED, The Municipal District of Graiguecullen — Portarlington, County Laois, Leinster, Éire / Ireland with 11 numbered planning items
    ⌖ the houseEmpty land zoned for homesBuilding startedApprovedNo decision yet
    1. 10.5 ha zoned for homesEmpty land zoned for homes · 42 m
    2. 21.3 ha zoned for homesEmpty land zoned for homes · 53 m
    3. 30.2 ha zoned for homesEmpty land zoned for homes · 74 m
    4. 40.1 ha zoned for homesEmpty land zoned for homes · 74 m
    5. 50.6 ha zoned for homesEmpty land zoned for homes · 111 m
    6. 60.4 ha zoned for homesEmpty land zoned for homes · 113 m
    7. 7Church Avenue, Stradbally 2560686Building started · 161 m
    8. 8Church avenue, Stradbally 2560686Approved with conditions · 137 m
    9. 9St Colemans National School, Church Avenue 2660464No decision yet · 327 m
    10. 10Athy Road, Stradbally 2560837Approved with conditions · 376 m
    11. 11Kylebeg, Athy Rd. 2660326No decision yet · 406 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 18 permissions since 2016, 9 show a start notice and 4 have a completion certificate. Most owners opt out of sign-off.

    18 applications lodged within 500 m. Council: 18 approved, 0 refused. After appeals: 18 approved. Of those: 4 signed off, 5 built with the owner's opt-out, 0 started, 5 with no start notice found, 4 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT18: lodged → approved18: approved → approved5: approved → no start notice found5: approved → built, owner opted out4: approved → signed off4: approved → ran out18 lodged18 lodged18 approved18 approved18 approved18 approved5 no start notice found5 no start notice found5 built, owner opted out5 built, owner opted out4 signed off4 signed off4 ran out4 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured18 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 10 within 500 m

      Empty land zoned for homes 10

      • 10.5 ha zoned for homes · no homes built on it yet · 42 m
      • 21.3 ha zoned for homes · no homes built on it yet · 53 m
      • 30.2 ha zoned for homes · no homes built on it yet · 74 m
      • 40.1 ha zoned for homes · no homes built on it yet · 74 m
      • 50.6 ha zoned for homes · no homes built on it yet · 111 m
      • 60.4 ha zoned for homes · no homes built on it yet · 113 m
      • 2.8 ha zoned for homes · no homes built on it yet · 129 m
      • 0.3 ha zoned for homes · no homes built on it yet · 129 m
      • 0.8 ha zoned for homes · no homes built on it yet · 198 m
      • 0.5 ha zoned for homes · no homes built on it yet · 0 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 19 Oct 2026, 02:08
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
      Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
      National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
      Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
      Figure 7

      Applications within 500 m, by year

      Between 1 and 3 a year; busiest 2018. 100% of decisions were approvals.

      2017: 3, 2018: 3, 2019: 1, 2020: 2, 2021: 3, 2022: 1, 2024: 1, 2025: 405102017: 3 approved3’17*2018: 3 approved3’182019: 1 approved1’192020: 2 approved2’202021: 3 approved3’212022: 1 approved1’222024: 1 approved1’242025: 4 approved4’25
      ApprovedRefusedWithdrawn or invalidUndecided

      2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 6 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 19 Oct 2026, 02:08
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
      Building work nearby 3 in the last 12 months
      1 not signed off2 no sign-off needed
      • 7Church Avenue, Stradbally, Laois · 19 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · 2560686 · 161 m
      • 10 Brockley Park, Stradbally, Laois, R32 E6K8 · 2 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 2560655 · 218 m
      • 28 Church Avenue, Stradbally, Laois · 2 Feb 2026 · 72 homes · start notice not signed off · 23/222 · 235 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 19 Oct 2026, 01:33
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 19 Oct 2026, 02:08
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
      National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
      Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: The Glebe · 3 applications in 10 years

      Crèches and schools inspected

      NameLatest inspectionDistance
      Early Learning Montessori · Crèche5 Feb 2026 · report · Tusla Early Years Inspectorateapprox. 772 m
      Stay & Play Childcare · Crèche8 Jun 2026 · report · Tusla Early Years Inspectorateapprox. 772 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
      SourceLicenceFetchedLink
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register14 Oct 2026, 23:20open
      How busy is this area Busier than most of Laois County Council.
      Homes approved
      Here18
      Council middle0
      Homes started
      Here193
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
      National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      75% owner-occupied (council 71%).

      Homes built before 1971
      21% · council 23%
      Homes built since 2001
      35% · council 44%
      Owner-occupied
      75% · council 71%
      Rented
      20% · council 24%
      Children under 15
      19% · council 22%
      Aged 65 and over
      12% · council 13%
      Households with 2+ cars
      44% · council 49%
      Work mainly from home
      13% · council 9%
      This small area (229 people)Laois

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 107091005

      Bus
      522 m
      Stradbally · 73, 838, IW04
      Nearest school
      403 m
      St Coleman's National School, 318 pupils
      Schools, stops and the council

      Schools

      • St Coleman's National School · primary · 318 pupils · 403 m
      • Cosby NS · primary · 57 pupils · 494 m

      Stops 3

      • Stradbally · 73, 838, IW04, IW06, IW08 · 1/hour at peak · 522 m
      • Stradbally · 838, IW04, IW06, IW08 · 536 m
      • Stradbally · 73, AI07, IW04 · 680 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Coleman's National School · 403 m-2.2% pupils (318)
      • Cosby NS · 494 m+9.6% pupils (57)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 19 Oct 2026, 02:28
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
      Council consultation portalsPublic19 Oct 2026, 01:38open
      Council meetings (ModernGov)Public19 Oct 2026, 02:28open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Stradbally
      Electoral division
      Stradbally
      Electoral area
      Graiguecullen -Portarlington-Lea-6
      Council
      Laois County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; on the vacant land tax map.
      • 10 sites nearby could change: 10 empty zoned plots.
      • No morning-peak service within 500 m; nearest is Stradbally, 522 m away (1 an hour).
      • Here (2022 census): 75% owner-occupied (council 71%); 2% of homes empty (council 8%); most built 2001–2010; 69% drive to work (council 65%); population up 6% since 2016.
      • The council decides in a median 55 days (about 8 weeks); 41% are asked for more information.
      • 6 applications nearby in the last 12 months.
      • 1 building job started within 250 m in the last six months.
      • 193 homes started within 1 km in 3 years (council middle 1).
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.019 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public19 Oct 2026
      www2.courts.ie—© the publisher19 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.012 Oct 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public19 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.019 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence19 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 19 Oct 2026, 10:09 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.