Bull Lane, Portlaoise
Homes here mostly date from before 1919. 1 planning file on this house, the latest from 2022. Home extensions nearby almost always get approved (98%). 36 homes approved 367 m away haven't started.
Not held yet for Laois County Council: council consultations.
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 51 days
- 4Appeal window4 weeks after the decision
- 5AppealAt An Coimisiún Pleanála
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 6 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built before 1919, before planning permission was needed. 1 planning file on this house, the latest from 2022.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
- 202222274 · work already done · approved 2022 · work already doneapprovedstartedsigned off?
Zoning, protection, tax and flood: the detail
What it says
Town Centre (Primary / Core Retail Area): To protect and enhance the special physical and social character of the existing town centre and to provide for and improve retailing and commercial activities
The main town centre — retail, offices, civic uses, apartments.
laois county development plan 2021 2027 · 8 Mar 2022 – 7 Mar 2028
What it says
Town Centre (Primary / Core Retail Area): To protect and enhance the special physical and social character of the existing town centre and to provide for and improve retailing and commercial activities
The main town centre — retail, offices, civic uses, apartments.
laois county development plan 2021 2027 including ministerial direction as varied by variation no 1 no 2 and no 3 · 8 Mar 2022 – 7 Mar 2028
Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Smith & McLaurin Ltd. (518 m); Tretorn Sport Ltd. (592 m)
| Within 500 m | Count | For example |
|---|---|---|
| Heritage inventory buildings | 152 | Greenbank; Maryville |
| Monuments | 13 | Historic town; Castle - unclassified |
How we work this out
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 26 Oct 2026, 23:21
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Development plan zoning (councils) | CC BY 4.0 | 25 Oct 2026, 23:06 | open |
| National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026, 19:35 | open |
| Sites and Monuments Record | CC BY 4.0 | 27 Sept 2026, 19:29 | open |
| SMR zones of notification | CC BY 4.0 | 27 Sept 2026, 19:34 | open |
| EPA licensed facilities (LEAP) | CC BY 4.0 | 26 Oct 2026, 23:21 | open |
| Records of Protected Structures | No licence stated · shown as a yes/no only | — | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
| Constraint layers (bundle) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026, 19:37 | open |
How we work this out
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 31 Oct 2026, 02:56 | open |
| National Planning Application Database | CC BY 4.0 | 31 Oct 2026, 23:00 | open |
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions are almost always approved here: 90–100% by type. A new house in a garden is harder: 82% approved, and 1 in 2 is asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 31 nearby, 1,116 council-wide
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 31 Oct 2026, 02:56 | open |
| National Planning Application Database | CC BY 4.0 | 31 Oct 2026, 23:00 | open |
How long, and what if someone objects?
A home extension's journey here
A decision takes 51 days. 1 in 3 is asked for more information, which adds about 82 days. Building starts about 6 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated63 decided home extensions, 14 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
1 of 2 appealed refusals became permissions. 1 of 8 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 2 in the last 12 months
- 501545 Granted · Hapurs Lane , Portlaoise , Co. Laois (part of former Minch Norton… · 329 m
- 324341 Withdrawn · Lands located between Harpur?s Lane and Mountrath Road (former… · 489 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 23:12
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Courts Service legal diary (judicial reviews) | © the publisher | 31 Oct 2026, 23:12 | open |
| National Planning Application Database | CC BY 4.0 | 31 Oct 2026, 23:00 | open |
What's changing around you?
- 1Maryville House 2460422
- 2Block 5 2460623
- 3Harpur’s Lane 2460056
- 4Lands located between Harpur’s Lane and Mountrath Road (former Centrepoint Shopping Centre), Maryborough Portlaoise 2660008
- 50.1 ha zoned for homes
- 60.5 ha zoned for homes
- 70.7 ha zoned for homes
- 80.1 ha zoned for homes
- 92.4 ha zoned for homes
- 100.2 ha zoned for homes
- 11First Floor, No. 6 Market Square 2660656
- 12Rear Building at 99 Main Street, Portlaoise 2660068
- 135 Wesley Terrace, Railway Street 2660380
- 14Hapurs Lane, Portlaoise 2560884
- 15Harpur's Lane, Portlaoise 2560894
What happens to applications within 500 m
Permission isn't building. Of 69 permissions since 2016, 22 show a start notice and 11 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured73 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
1 deadline within 500 m; the first closes 3 Dec 2026.
- Time to ask the High Court for a review ends 3 Dec 202633 days leftGrant permission329 m away
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Approved, stalled or planned, not built yet
36 homes 367 m away were approved Jan 2025 with no start notice yet; the permission runs to Jan 2030.
Each row is a dated fact from a public register: no score and no forecast.
Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)
Sites that could change 13 within 500 m
Approved, not started 3
- Maryville House · 14 homes approved Jan 2025, not started · 296 m
- Block 5 · 36 homes approved Jan 2025, not started · 367 m
- Harpur’s Lane · 28 homes approved Aug 2024, not started · 440 m
Empty land zoned for homes 10
- 50.1 ha zoned for homes · no homes built on it yet · 169 m
- 60.5 ha zoned for homes · no homes built on it yet · 173 m
- 70.7 ha zoned for homes · no homes built on it yet · 196 m
- 80.1 ha zoned for homes · no homes built on it yet · 224 m
- 92.4 ha zoned for homes · no homes built on it yet · 241 m
- 100.2 ha zoned for homes · no homes built on it yet · 252 m
- 1.9 ha zoned for homes · no homes built on it yet · 252 m
- 2.7 ha zoned for homes · no homes built on it yet · 281 m
- 0.3 ha zoned for homes · no homes built on it yet · 329 m
- 1.7 ha zoned for homes · no homes built on it yet · 342 m
Not covered here: council land to be sold (Dublin only).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 31 Oct 2026, 02:56 | open |
| Derelict sites registers | CC BY 4.0 | 26 Oct 2026, 23:09 | open |
| National Planning Application Database | CC BY 4.0 | 31 Oct 2026, 23:00 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
Applications within 500 m, by year
Between 13 and 16 a year; busiest 2022. 95% of decisions were approvals.
2021 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Every application within 500 m 12 in the last 12 months
See every application on the map
- No.10 Kellyville Park , portlaoise , Co.Laois Withdrawn or not validChange of use from residential to short-term letting.
- Beechfield House Green Road , Portlaoise , Co. Laois Withdrawn or not valid1. demolish part of the existing boundary wall; 2. Planning permission to erect 14 no. dwelling units within…
- 11First Floor , No. 6 Market Square , Portlaoise Co. Laois No decision yetdevelop first Floor, No. 6 Market Square, Portlaoise, Co. Laois (Former Portlaoise arms Building Protected…
- First Floor , No. 6 Market Square , Portlaoise Co. Laois Withdrawn or not validdevelop at First Floor, No. 6 Market Square, Portlaoise, Co. Laois (Former Portlaoise arms Building Protected…
- 135 Wesley Terrace , Railway Street , Portlaoise Approved with conditionsRetain change of use from dwelling house to office and associated site works
- 12Rear Building at 99 Main Street , Portlaoise , Co. Laois Approved with conditionsChange of Use from a single-storey, shop store (previously a launderette facility) to Natural Salt Wellness…
- 4Lands located between Harpur’s Lane and Mountrath Road (former Centrepoint Shopping Centre) , Maryborough Portlaoise , Co. Laois Approved with conditionscarry out development which will consist of: A proposed residential and commercial development on a…
- 15Harpur's Lane , Portlaoise , Co. Laois Approved with conditionsConstruct an aparthotel five storeys in height. The aparthotel will consist of 25no. guest suites comprising…
- 14Hapurs Lane , Portlaoise , Co. Laois (part of former Minch Norton Maltings). Approved with conditionsmodify the granted planning 25/60636 for the construction of a new two-storey property manager office…
- Hapurs Lane , Portlaoise , Co. Laois (part of former Minch Norton Maltings). Withdrawn or not validmodify the granted planning 25/60636 for the construction of a new two-storey property manager office…
- Rear Building at 99 Main Street , Portlaoise , Co. Laois Withdrawn or not validA Change of Use from a single-storey, shop store (previously a launderette facility) to Natural Salt Wellness…
- Hapurs Lane , Portlaoise , Co. Laois (part of former Minch Norton Maltings). RefusedIntensify the usage of the creche, located at the Maltings, Harpurs Lane Portlaoise previous planning grant…
How we work this out
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 31 Oct 2026, 23:00 | open |
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 31 Oct 2026, 02:56 | open |
Building work nearby 4 in the last 12 months
- 99 Main Street, Portlaoise, Laois, R32 X015 · 28 Sept 2026 · 7-day notice not signed off · 26/60068 · 262 m
- Mountrath Road, Portlaoise, Laois · 12 Aug 2026 · 7-day notice not signed off · 464 m
- 2 Abbeyleix Road, Portlaoise, Laois · 29 Jun 2026 · short notice no sign-off needed · 2560469 · 423 m
- 1 Church Avenue, Portlaoise, Laois, R32 EV65 · 18 Dec 2025 · 1 homes · 7-day notice not signed off · 2560490 · 346 m
How we work this out
Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 31 Oct 2026, 02:56 | open |
Homes coming 78 not started
- Harpur's Lane · 68 homes · building started · 424 m
- part of former Minch Norton Maltings · 66 homes · building started · 393 m
- 2Block 5 · 36 homes · not started · runs out 27 Jan 2030 · 367 m
- 3Harpur’s Lane · 28 homes · not started · runs out 27 Mar 2028 · 440 m
- Harpur's Lane · 28 homes · building started · 492 m
- part of former Minch Norton Maltings · 19 homes · building started · 473 m
- 1Maryville House · 14 homes · not started · runs out 27 Jan 2030 · 296 m
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 31 Oct 2026, 02:56 | open |
| National Planning Application Database | CC BY 4.0 | 31 Oct 2026, 23:00 | open |
| Social housing construction status report | CC BY-SA 4.0 | 23 Oct 2026, 23:02 | open |
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| Laois International School · Crèche | 14 Jul 2025 · report · Tusla Early Years Inspectorate | 278 m |
| Elaines Little Treasures Preschool Limited · Crèche | 4 Jun 2025 · report · Tusla Early Years Inspectorate | approx. 597 m |
| The Maples Creche · Crèche | 9 Mar 2026 · report · Tusla Early Years Inspectorate | 795 m |
| The Hive at Maples Early Years · Crèche | 3 Jun 2026 · report · Tusla Early Years Inspectorate | 795 m |
| Maples 2 · Crèche | 13 Jan 2025 · report · Tusla Early Years Inspectorate | 795 m |
| The Stables@Maples · Crèche | 25 Sept 2025 · report · Tusla Early Years Inspectorate | 795 m |
| The Rainbow Castle Ltd. · Crèche | 1 Jul 2025 · report · Tusla Early Years Inspectorate | 966 m |
How we work this out
How busy is this area Busier than most of Laois County Council.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 31 Oct 2026, 02:56 | open |
| National Planning Application Database | CC BY 4.0 | 31 Oct 2026, 23:00 | open |
What's the area like?
This street block against the council
42% of homes built before 1971 (council 23%). 32% owner-occupied (council 71%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 107080017
Schools, stops and the council
Schools
- Dunamase College (Coláiste Dhún Másc) · postprimary · 506 pupils · 177 m
- St Francis S S · primary · 121 pupils · 814 m
- Portlaoise College · postprimary · 1005 pupils · 897 m
Stops 34
- Kellyville Park · PL1, PL2 · 4/hour at peak · 101 m
- Kellyville Park · 858, 858a, 858b, PL1, PL2 · 4/hour at peak · 109 m
- Market Square · IW08 · 0/hour at peak · 181 m
- Market Sq · 823, 834, 858, 858a, 858b, PL1 · 5/hour at peak · 181 m
- Portlaoise JFL Ave · 73, 735, 823, 832, 834, 858 · 5/hour at peak · 190 m
- Portlaoise JFL Ave · 726 · 1/hour at peak · 191 m
- Portlaoise JFL Ave · 827, 829, 830, 831, 838 · 2/hour at peak · 191 m
- Market Square · IW08 · 202 m
Schools growing or shrinking planning in 3 years · pupils last year
- Dunamase College (Coláiste Dhún Másc) · 177 m-12.3% pupils (506)
- St Francis S S · 814 m+1.7% pupils (121) · temporary classrooms 2025, approved with conditions · 4 classrooms 2024, approved with conditions
- Portlaoise College · 897 m+5.6% pupils (1,005)
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Public transport stops and routes (NTA GTFS) | CC BY 4.0 | 25 Oct 2026, 23:02 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| National Planning Application Database | CC BY 4.0 | 31 Oct 2026, 23:00 | open |
| Council consultation portals | Public | 31 Oct 2026, 01:06 | open |
| Council meetings (ModernGov) | Public | 31 Oct 2026, 02:21 | open |
| Land Development Agency public land register | CC BY 4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Work already done (22274): work kept with permission. Done as approved?Seller · solicitorAsk for: The retention grant and an opinion of compliance.
- Next to a recorded monument: does digging need notice?Seller · councilAsk for: Details of past works from the seller.
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Maryborough
- Electoral division
- Portlaoighise Urban
- Electoral area
- Portlaoise
- Council
- Laois County Council
Everything we found, as a list 8 lines
- 1 application on this site; latest 22274, approved 2022, work already done.
- Zoned M2 (major town centre); monument zone; no vacant land tax.
- 13 sites nearby could change: 3 approved schemes, 10 empty zoned plots.
- 78 homes approved nearby, not started; largest 36 at Block 5.
- Portlaoise JFL Ave (bus 726, 73) 284 m away: 8 an hour at morning peak; 50 from all stops within 500 m.
- Here (2022 census): 63% rent (council 24%); 44% of homes empty (council 8%); most built before 1919; 29% drive to work (council 65%); population up 1% since 2016.
- Around here the council decides in a median 55 days (about 8 weeks); 48% are asked for more information.
- 12 applications nearby in the last 12 months; 83% approved (council 93%).
What the terms mean 8 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- Permission for work already done (Retention permission): An application to keep something that was built without permission.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 29
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC BY 4.0 | 30 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC BY 4.0 | 31 Oct 2026 |
| data.gov.ie | Various (see each layer) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR zones) | CC BY 4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | Local authorities (consultation portals) | Public | 31 Oct 2026 |
| www2.courts.ie | — | © the publisher | 31 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC BY 4.0 | 26 Oct 2026 |
| data.epa.ie | Environmental Protection Agency (LEAP licence register) | CC BY 4.0 | 26 Oct 2026 |
| transportforireland.ie | National Transport Authority | CC BY 4.0 | 25 Oct 2026 |
| lda.ie | Land Development Agency | CC BY 4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | Public | 31 Oct 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC BY 4.0 | 31 Oct 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC BY 4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC BY 4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | © PSRA, PSI licence | 31 Oct 2026 |
| services3.arcgis.com | Local authorities (Record of Protected Structures) | No licence stated · flag only | — |
| services.arcgis.com | Local authorities (RZLT maps) | CC BY 4.0 | 25 Oct 2026 |
| gov.ie | Department of Education | CC BY 4.0 | 27 Oct 2026 |
| gov.ie | Department of Housing | CC BY-SA 4.0 | 23 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | Public register | 28 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC BY 4.0 | 25 Oct 2026 |