PlanningRegister.ie
Planning report · Laois County Council · 500 m around the house · the last 12 months · 20 Oct 2026, 04:42

Ballyfin Road

53.04532, -7.37785

Homes here mostly date from the 1970s. 1 planning file on this house, the latest from 2023. 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Laois County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 1 planning file on this house, the latest from 2024.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of RossBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2024: 2360494 · extension, approved2019: 1 file on Ross2021: 2 files on Ross2022: 1 file on Ross2023: 1 file on Ross2026: 1 file on Ross6 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    2360494 · extension · approved 2024 · started, no sign-off needed
    approvedstartedsigned off?
On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 1 in 2 are asked for more information.

New house in a garden or site10 decided · more info asked 50%
100% · council 91%
Approved nearbyLaois overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 10 nearby, 1,497 council-wide

Figure 3

Ross, file by file since 2019

2 of 2 decided extensions on the road were approved. New houses in side gardens or on sites: 3 of 3.

6 planning files on Ross since 2019, by kind and decision.20192020202120222023202420252026Extensions, atticsNo number · 2021 · porch / front · approved · 21339No number · 2023 · single-storey side · approved · 2360494Porches, roofs, otherNo number · 2026 · other work · refused · 2660482New house in a side gardenNo number · 2019 · new house · approved · 19699No number · 2021 · new house · approved · 21519No number · 2022 · new house · approved · 22570
ApprovedRefusedWithdrawn or invalid

6 files with "Ross" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2019–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 3

    How long, and what if someone objects?

    Figure 4

    What appeals changed

    0 of 2 appealed approvals were reversed.

    Approvals appealed2 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Ballyfin Road with 1 numbered planning items
    ⌖ the houseOpen for comments
    1. 1Ross House, Ross Ballyfin 2660705No decision yet · 254 m
    Figure 5

    The next 30 days

    1 deadline within 500 m; the first closes 5 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-05 2660705: application received — (i) Construct a two-storey rear extension and a single-storey family flat extension ancillary to the existing dwelling; today25 Oct30 Oct4 Nov9 Nov14 Nov19 Nov2660705: application received — (i) Construct a two-storey rear extension and a single-storey family flat extension ancillary to the existing dwelling; · 254 m away · 2026-11-05
    Comments close
    • Comments close 5 Nov 202616 days left
      12660705 · application received — (i) Construct a two-storey rear extension and a single-storey family flat extension ancillary to…
      €20 to the council · 254 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Applications within 500 m, by year

    Between 1 and 1 a year; busiest 2022. 100% of decisions were approvals.

    2021: 2, 2022: 1, 2023: 105102021: 2 approved2’21*2022: 1 approved1’222023: 1 approved1’23
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1Ross House , Ross Ballyfin , Co. Laois comments close 5 Nov 2026
      (i) Construct a two-storey rear extension and a single-storey family flat extension ancillary to the existing…
      26607051 Oct 20261 homes254 m
    Every application within 500 m 1 in the last 12 months

    See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 20 Oct 2026, 02:09
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
      0
      How busy is this area About as busy as most of Laois County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here1
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
      National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
      Question 5

      What's the area like?

      Figure 7

      This street block against the council

      91% owner-occupied (council 71%).

      Homes built before 1971
      19% · council 23%
      Homes built since 2001
      29% · council 44%
      Owner-occupied
      91% · council 71%
      Rented
      1% · council 24%
      Children under 15
      22% · council 22%
      Aged 65 and over
      16% · council 13%
      Households with 2+ cars
      69% · council 49%
      Work mainly from home
      7% · council 9%
      This small area (471 people)Laois

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 107029001

      Schools, stops and the council

      Schools

      None nearby.

        Stops 0

          Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 20 Oct 2026, 02:32
          SourceLicenceFetchedLink
          Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
          Department of Education school listCC BY 4.027 Sept 2026, 23:32open
          Council consultation portalsPublic20 Oct 2026, 01:41open
          Council meetings (ModernGov)Public20 Oct 2026, 02:32open
          Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
          cso_saps_2022CC BY 4.0—open
          National Transport AuthorityCC BY 4.0——
          Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
          dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
          EPA strategic noise mapsCC BY 4.0——
          Fingal County CouncilCC BY 4.0——
          Question 6

          What to ask, and who

          1. Extension (2360494) built without official sign-off: built properly?
            Ask for: An engineer's opinion of compliance.
            Seller · solicitor
          2. Application 254 m away open for comments until 5 Nov 2026: comment?
            Ask for: The plans on the council's website (€20 to comment).
            Council
          3. Any work done without planning permission?
            Ask for: An opinion of compliance for the whole house.
            Seller · solicitor
          Reference

          Where this is, the terms, the sources

          Townland
          Ross
          Electoral division
          Clondarrig
          Electoral area
          Portlaoise
          Council
          Laois County Council
          Everything we found, as a list 8 lines
          • 1 application on this site; latest 2360494, approved 2024, started, no sign-off needed.
          • Not protected; no vacant land tax.
          • Nothing nearby looks set to change.
          • 1 application open for comments nearby; nearest closes 5 Nov 2026.
          • No scheduled public transport within 800 m.
          • Here (2022 census): 91% owner-occupied (council 71%); 9% of homes empty (council 8%); most built 1971–1980; 72% drive to work (council 65%); population up 47% since 2016.
          • The council decides in a median 55 days (about 8 weeks); 41% are asked for more information.
          • 1 applications nearby in the last 12 months.
          What the terms mean 6 terms
          • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
          • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
          • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
          • Approved (Grant of permission): The council said yes, usually with conditions.
          • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
          • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
          Sources and licences 23
          SourcePublisherLicenceFetched
          EPA strategic noise maps—CC BY 4.0—
          Fingal County Council—CC BY 4.0—
          Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
          National Transport Authority—CC BY 4.0—
          services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
          data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.020 Oct 2026
          data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
          dlrcoco.citizenspace.comLocal authorities (consultation portals)Public20 Oct 2026
          www2.courts.ie—© the publisher20 Oct 2026
          cso.ie—CC BY 4.0—
          dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
          services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
          transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
          lda.ieLand Development AgencyCC BY 4.011 Sept 2026
          meetings.fingal.ieLocal authorities (council meetings)Public20 Oct 2026
          services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.020 Oct 2026
          services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
          services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
          propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence20 Oct 2026
          services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
          gov.ieDepartment of EducationCC BY 4.027 Sept 2026
          gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
          services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
          Measured
          counted from a public register
          Calculated
          a rate or median we worked out from those counts
          Our classification
          we sorted it by reading each description
          Estimate
          inferred from another source (census, map data)
          Rule summary
          the law, simplified: check before relying on it
          How we work this out
          Generated 20 Oct 2026, 04:42 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.