Planning report · Kildare County Council · 2000 m around the house · the last 12 months · 13 Oct 2026, 02:48

Pudding Lane, Ballymore Eustace

53.12995, -6.60953

Homes here mostly date from the 1970s. 11 homes approved 225 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 8 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Ballymore EustaceBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2017: 7 files on Ballymore Eustace2018: 4 files on Ballymore Eustace2019: 8 files on Ballymore Eustace2020: 3 files on Ballymore Eustace2021: 9 files on Ballymore Eustace2022: 5 files on Ballymore Eustace2023: 6 files on Ballymore Eustace2024: 5 files on Ballymore Eustace2025: 2 files on Ballymore Eustace2026: 2 files on Ballymore Eustace51 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Ballymore Eustace (604 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Natural heritage areas1Poulaphouca Reservoir
Heritage inventory buildings46Catholic Church of the Immaculate Conception; house
Radon grid squares1
Monuments54Enclosure; Bullaun stone
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 33 on the draft 2027 map; 33 on the final 2026 map.
Sources: zoning, constraints.radon, epa_leap, rzlt, constraints, constraints.nha, constraints.niah, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
epa_leapCC-BY-4.012 Oct 2026, 23:31open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.nhaCC-BY-4.027 Sept 2026, 19:27open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 13 Oct 2026, 00:21
SourceLicenceFetchedLink
bcmsCC-BY-4.013 Oct 2026, 00:21open
npadCC-BY-4.013 Oct 2026, 01:45open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 95% approved, and 1 in 2 is asked for more information.

New house in a garden or site19 decided · more info asked 47%
95% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 19 nearby, 2,003 council-wide

Figure 3

Ballymore Eustace, file by file since 2017

14 of 14 decided extensions on the road were approved. New houses in side gardens or on sites: 10 of 11.

51 planning files on Ballymore Eustace since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2017 · single-storey rear · approved · 17516No number · 2019 · single-storey rear · approved · 19127No number · 2019 · attic conversion / dormer · approved · 191416No number · 2020 · attic conversion / dormer · approved · 201029No number · 2021 · first-floor · approved · 211446No number · 2021 · two-storey rear · approved · 211501No number · 2021 · single-storey rear · approved · 21349No number · 2022 · rear · approved · 2246No. 15 · 2023 · single-storey rear · approved · 23309No number · 2023 · single-storey rear · approved · 23840No. 8 · 2023 · attic conversion / dormer · approved · 23867No number · 2024 · first-floor · approved · 2460152No number · 2024 · single-storey rear · approved · 2460299No number · 2026 · single-storey rear · approved · 2660474Porches, roofs, otherNo number · 2017 · other work · approved · 171443No number · 2017 · other work · refused · 17204No number · 2017 · other work · approved · 17446No number · 2017 · other work · refused · 17796No number · 2017 · other work · approved · 17848No number · 2018 · other work · approved · 181347No number · 2018 · other work · approved · 18304No number · 2018 · other work · approved · 18615No number · 2019 · other work · refused · 191029No. 16 · 2019 · other work · approved · 191084No number · 2019 · other work · approved · 191415No number · 2019 · other work · approved · 19750No number · 2020 · other work · approved · 2059No number · 2021 · other work · approved · 211643No number · 2021 · other work · approved · 21497No number · 2021 · other work · approved · 21728No number · 2022 · other work · refused · 221363No number · 2022 · other work · approved · 221371No number · 2022 · other work · approved · 221373No number · 2022 · other work · refused · 221425No number · 2023 · other work · approved · 23224No number · 2023 · other work · approved · 23408No number · 2024 · other work · approved · 2460746No number · 2025 · other work · approved · 2560317No number · 2025 · other work · approved · 2561276No number · 2026 · other work · approved · 2630New house in a side gardenNo number · 2017 · new house · refused · 17294No number · 2018 · new house · approved · 1881No number · 2019 · new house · approved · 191150No number · 2019 · new house · approved · 19554No number · 2020 · new house · approved · 20471No number · 2021 · new house · approved · 211357No number · 2021 · new house · approved · 21161No. 19 · 2021 · new house · approved · 21758No number · 2023 · new house · approved · 2360119No number · 2024 · new house · approved · 2460074No number · 2024 · new house · approved · 2461098
ApprovedRefusedWithdrawn or invalid

51 files with "Ballymore Eustace" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 13 Oct 2026, 01:45
    SourceLicenceFetchedLink
    npadCC-BY-4.013 Oct 2026, 01:45open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 2 is asked for more information, which adds about 97 days. Building starts about 8 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 2): 150 days; Appeal window: 4 weeks; Building starts: 243 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 mo21 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–54 (n=13)52 daysIf more info asked (1 in 2)With further information: median 150 days (n=10)150 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 243 days after permission (n=8)243 days after permissionSigned off100% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated23 decided home extensions, 8 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 3 appealed refusals became permissions. 2 of 3 appealed approvals were reversed.

    Refusals appealed3 decided
    1 became permissions
    Approvals appealed3 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500379 Withdrawn · The Former Thatch Pub Site , Main St. , Ballymore Eustace · 465 m
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved13 Oct 2026, 01:30open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 4

    What's changing around you?

    Street map around Pudding Lane, Ballymore Eustace with 15 numbered planning items
    ⌖ the houseWindow closingApproved, not startedEmpty land zoned for homesApprovedNo decision yet
    1. 1Scoil Mhuire, Naas Rd Ballymore Eustace East 2660463Approved with conditions · 644 m
    2. 2Oliver Plunkett Road 211643Approved, not started, approval runs out within a year · 225 m
    3. 31.5 ha zoned for homesEmpty land zoned for homes · 43 m
    4. 41.6 ha zoned for homesEmpty land zoned for homes · 168 m
    5. 50.2 ha zoned for homesEmpty land zoned for homes · 245 m
    6. 60.7 ha zoned for homesEmpty land zoned for homes · 255 m
    7. 71.9 ha zoned for homesEmpty land zoned for homes · 268 m
    8. 81.6 ha zoned for homesEmpty land zoned for homes · 282 m
    9. 9Broadleas Common, Ballymore Eustace 2630Approved with conditions · 292 m
    10. 10Barrack Street, Ballymore Eustace 2660474Approved with conditions · 423 m
    11. 11The former Thatch Pub Main Street, Ballymore Eustace 2660885No decision yet · 465 m
    12. 12The Hub Market Square, Ballymore Eustace 2561276Approved with conditions · 498 m
    13. 13Main Street, Ballymore Eustace 2660767No decision yet · 590 m
    14. 14Mount Cashel Lodge Ballymore Eustace West, Ballymore Eustace 2660378No decision yet · 743 m
    15. 15Highland, Briencan 2660096Approved with conditions · 1.1 km
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 38 permissions since 2016, 8 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    43 applications lodged within 500 m. Council: 38 approved, 5 refused. After appeals: 38 approved. Of those: 0 signed off, 8 built with the owner's opt-out, 0 started, 15 with no start notice found, 15 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT38: lodged → approved5: lodged → refused38: approved → approved5: refused → refused15: approved → no start notice found8: approved → built, owner opted out15: approved → ran out43 lodged43 lodged38 approved38 approved5 refused5 refused38 approved38 approved5 refused5 refused15 no start notice found15 no start notice found8 built, owner opted out8 built, owner opted out15 ran out15 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured43 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 2.0 km; the first closes 14 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-14 2660463: CONDITIONAL — Permission for the Provision of 4no. 12.0m high floodlight columns to existing astro pitch at Scoil Mhuire, Naas Road, Btoday18 Oct23 Oct28 Oct2 Nov7 Nov12 Nov2660463: CONDITIONAL — Permission for the Provision of 4no. 12.0m high floodlight columns to existing astro pitch at Scoil Mhuire, Naas Road, B · 644 m away · 2026-10-14
    Time to appeal ends
    • Time to appeal ends 14 Oct 20261 day left
      12660463 · CONDITIONAL — Permission for the Provision of 4no. 12.0m high floodlight columns to existing astro pitch at Scoil…
      €220 to An Coimisiún Pleanála (€110 observer) · 644 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    11 homes 225 m away were approved Jun 2022 with no start notice yet; the permission runs to Jun 2027.

    Oliver Plunkett Road · 11 homes: 11 homes approved, not started; runs out Jun 20272022202320242025202620272028Oliver Plunkett Road · 11 homes225 m · 21164311 homes approved, not started; runs out Jun 202711 homes approved, not started; runs out Jun 2027today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 2.0 km

    Approved, not started, approval running out 1

    Empty land zoned for homes 10

    • 31.5 ha zoned for homes · no homes built on it yet · 43 m
    • 41.6 ha zoned for homes · no homes built on it yet · 168 m
    • 50.2 ha zoned for homes · no homes built on it yet · 245 m
    • 60.7 ha zoned for homes · no homes built on it yet · 255 m
    • 71.9 ha zoned for homes · no homes built on it yet · 268 m
    • 81.6 ha zoned for homes · no homes built on it yet · 282 m
    • 0.4 ha zoned for homes · no homes built on it yet · 343 m
    • 0.2 ha zoned for homes · no homes built on it yet · 357 m
    • 1.0 ha zoned for homes · no homes built on it yet · 368 m
    • 1.0 ha zoned for homes · no homes built on it yet · 382 m

    Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

    Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    derelictCC-BY-4.012 Oct 2026, 23:08open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Figure 9

    Applications within 500 m, by year

    Between 1 and 8 a year; busiest 2021. 88% of decisions were approvals.

    2017: 7, 2018: 3, 2019: 7, 2020: 3, 2021: 8, 2022: 3, 2023: 6, 2024: 3, 2025: 1, 2026: 205102017: 4 approved2017: 3 refused7’17*2018: 3 approved3’182019: 6 approved2019: 1 refused7’192020: 3 approved3’202021: 8 approved8’212022: 2 approved2022: 1 refused3’222023: 6 approved6’232024: 3 approved3’242025: 1 approved1’252026: 2 approved2’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 2.0 km 16 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 13 Oct 2026, 01:45
    SourceLicenceFetchedLink
    npadCC-BY-4.013 Oct 2026, 01:45open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    Building work nearby 7 in the last 12 months
    2 not signed off5 no sign-off needed
    • Ballymore Eustace, Kildare · 1 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · 2461093 · 674 m
    • Main Street, Ballymore Eustace, Kildare, W91 PF86 · 11 May 2026 · start notice not signed off · 24/60312 · 725 m
    • Ballymore Eustace, Kildare, W91 Y6W3 · 4 May 2026 · 1 homes · start notice, opted out no sign-off needed · 25126 · 1.8 km
    • Coughlanstown, Ballymore Eustace, Kildare · 25 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60226 · 1.4 km
    • 15 Hillcrest, Ballymore Eustace, Kildare, W91 A4P2 · 20 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 23309 · 468 m
    • Bishopland, Ballymore Eustace, Kildare · 5 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 2560317 · 636 m
    • Chapel Street, Ballymore Eustace, Kildare · 31 Oct 2025 · 2 homes · start notice not signed off · 23/840 · 498 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 13 Oct 2026, 00:21
    SourceLicenceFetchedLink
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    Homes coming 11 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools
    How busy is this area Busier than most of Kildare County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here17
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    35% of homes built before 1971 (council 16%). 86% owner-occupied (council 71%).

    Homes built before 1971
    35% · council 16%
    Homes built since 2001
    20% · council 40%
    Owner-occupied
    86% · council 71%
    Rented
    5% · council 24%
    Children under 15
    18% · council 22%
    Aged 65 and over
    22% · council 12%
    Households with 2+ cars
    68% · council 51%
    Work mainly from home
    13% · council 12%
    This small area (427 people)Kildare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087006002

    Bus
    517 m
    Ballymore Eustace · 65, 885
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Nearest school
    725 m
    S N Mhuire, 216 pupils
    Homes sold nearby
    7
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • S N Mhuire · primary · 216 pupils · 725 m

    Stops 4

    • Ballymore Eustace · 65, 885 · 1/hour at peak · 517 m
    • Ballymore Eustace · 885 · 0/hour at peak · 520 m

    Schools growing or shrinking planning in 3 years · pupils last year

    Open consultations

    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
    SourceLicenceFetchedLink
    gtfsCC-BY-4.011 Oct 2026, 23:43open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.013 Oct 2026, 01:45open
    consultpublic13 Oct 2026, 01:29open
    moderngovpublic13 Oct 2026, 01:29open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    2. 11 homes approved 225 m away (Oliver Plunkett Road), not started: what is planned?
      Ask for: The planning file for 211643.
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Bishopsland
    Electoral division
    Ballymore Eustace
    Electoral area
    Naas
    Council
    Kildare County Council
    Everything we found, as a list 8 lines
    • Not protected; no vacant land tax; high radon area.
    • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
    • 11 homes approved nearby, not started; largest 11 at Oliver Plunkett Road.
    • No morning-peak service within 500 m; nearest is Ballymore Eustace, 517 m away (1 an hour).
    • Here (2022 census): 86% owner-occupied (council 71%); 8% of homes empty (council 5%); most built 1971–1980; 66% drive to work (council 61%); population up 5% since 2016.
    • The council decides in a median 61 days (about 9 weeks); 43% are asked for more information.
    • Homes started within 1 km: 5 in the last year, 88 three years before.
    • 16 applications nearby in the last 12 months; 88% approved (council 80%).
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.012 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public13 Oct 2026
    www2.courts.ie—all-rights-reserved13 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public13 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.013 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…13 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    water.ie—all-rights-reserved (water.ie terms cl… · flag only—
    water.ie—all-rights-reserved (water.ie terms cl… · flag only—
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 13 Oct 2026, 02:48 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.