PlanningRegister.ie
Planning report · Galway County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 20:23

N67

53.14014, -8.93067

Homes here mostly date from the 2000s. 31 homes approved 333 m away haven't started.

See on the mapWatch this area

Not held yet for Galway County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Dungory WestBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 2 files on Dungory West2022: 2 files on Dungory West2023: 2 files on Dungory West2024: 5 files on Dungory West2025: 3 files on Dungory West2026: 2 files on Dungory West16 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
Yes
Protected or listed · a building in the national heritage inventory (30339019)
Yes
Vacant land tax · 3% of land value a year
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Residential Existing: To protect and improve residential amenities of existing residential areas

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

galway county development plan 2022 2028 · 20 Jun 2022 – 19 Jun 2028

Heritage inventoryOn this site house

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Kinvara (489 m)

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings12harbour/dock/port; store/warehouse
Monuments12Castle - tower house; House - 18th/19th century
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 21 on the draft 2027 map; 21 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 57% approved, and 1 in 2 is asked for more information.

New house in a garden or site14 decided · more info asked 43%
57% · council 79%
Approved nearbyGalway overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 14 nearby, 3,279 council-wide

Figure 3

Dungory West, file by file since 2021

3 of 3 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

16 planning files on Dungory West since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · other extension · approved · 21160No number · 2024 · other extension · approved · 2460213No number · 2024 · attic conversion / dormer · approved · 2461264Porches, roofs, otherNo number · 2021 · other work · approved · 21566No number · 2022 · other work · refused · 2260405No number · 2022 · other work · refused · 2260466No number · 2023 · other work · approved · 2360658No number · 2023 · other work · approved · 2360774No number · 2024 · other work · approved · 2461294No number · 2024 · other work · approved · 2461781No. 1 · 2025 · other work · approved · 2561796No number · 2025 · other work · approved · 2561797No number · 2025 · other work · approved · 2561799No number · 2026 · other work · refused · 26177No number · 2026 · other work · approved · 2660701New house in a side gardenNo number · 2024 · new house · approved · 2460682
ApprovedRefusedWithdrawn or invalid

16 files with "Dungory West" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days.

    Comments open: 5 weeks · €20; Council decision: 54 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 50–56 (n=10)54 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated13 decided home extensions, 5 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 3 appealed refusals became permissions. 0 of 3 appealed approvals were reversed.

    Refusals appealed3 decided
    1 became permissions
    Approvals appealed3 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around N67 with 15 numbered planning items
    ⌖ the houseWindow closingEmpty land zoned for homesRefusedApprovedNo decision yet
    1. 1Dungory West, Bóthar na Mias 2660701Approved with conditions · 256 m
    2. 2Kinvara, Courthouse Road 2660873Approved with conditions · 459 m
    3. 32.1 ha zoned for homesEmpty land zoned for homes · 47 m
    4. 40.5 ha zoned for homesEmpty land zoned for homes · 93 m
    5. 51.5 ha zoned for homesEmpty land zoned for homes · 126 m
    6. 61.6 ha zoned for homesEmpty land zoned for homes · 147 m
    7. 70.2 ha zoned for homesEmpty land zoned for homes · 179 m
    8. 80.5 ha zoned for homesEmpty land zoned for homes · 196 m
    9. 9Dungory West & Dungory East, Cul an Rí 26177Refused · 305 m
    10. 10No. 1 Cuil Na RÍ, Dungory West Kinvara 2561796Approved with conditions · 305 m
    11. 11Dungory West, 2 Cuil Na RÍ 2561797Approved with conditions · 341 m
    12. 12Cartron, Kinvara 2660823Approved with conditions · 353 m
    13. 13Dungory West, 7 Cuil Na RÍ 2561799Approved with conditions · 375 m
    14. 14Cartron, Sexton's Main Street 2661497No decision yet · 385 m
    15. 15Cartron, Kinvara 2660299Approved with conditions · 410 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 29 permissions since 2016, 6 show a start notice and 3 have a completion certificate.

    33 applications lodged within 500 m. Council: 29 approved, 4 refused. After appeals: 29 approved. Of those: 3 signed off, 1 built with the owner's opt-out, 2 started, 23 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT29: lodged → approved4: lodged → refused29: approved → approved4: refused → refused23: approved → no start notice found1: approved → built, owner opted out2: approved → started, not signed off3: approved → signed off33 lodged33 lodged29 approved29 approved4 refused4 refused29 approved29 approved4 refused4 refused23 no start notice found23 no start notice found1 built, owner opted out1 built, owner opted out2 started, not signed off2 started, not signed off3 signed off3 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured33 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 2 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-02 2660873: CONDITIONAL — sought to; (1) demolish an existing fire damaged and uninhabitable dwellinghouse. (2) Permission to construct a two and ; 2026-11-12 2660701: CONDITIONAL — for a residential development comprising 31 no. units. The site is accessed via Bóthar na Mias, which in turn is accessetoday5 Nov10 Nov15 Nov20 Nov25 Nov30 Nov2660873: CONDITIONAL — sought to; (1) demolish an existing fire damaged and uninhabitable dwellinghouse. (2) Permission to construct a two and · 459 m away · 2026-11-022660701: CONDITIONAL — for a residential development comprising 31 no. units. The site is accessed via Bóthar na Mias, which in turn is accesse · 256 m away · 2026-11-12
    Time to appeal ends
    • Time to appeal ends 2 Nov 20262 days left
      22660873 · CONDITIONAL — sought to; (1) demolish an existing fire damaged and uninhabitable dwellinghouse. (2) Permission to…
      €220 to An Coimisiún Pleanála (€110 observer) · 459 m away
    • Time to appeal ends 12 Nov 202612 days left
      12660701 · CONDITIONAL — for a residential development comprising 31 no. units. The site is accessed via Bóthar na Mias, which in…
      €220 to An Coimisiún Pleanála (€110 observer) · 256 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    31 homes 333 m away were approved Oct 2026 with no start notice yet; the permission runs to Oct 2031.

    Dungory West · 31 homes: 31 homes approved Oct 2026, not started202420252026202720282029203020312032Dungory West · 31 homes333 m · 266070131 homes approved Oct 2026, not started31 homes approved Oct 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 500 m

    Approved, not started 1

    • Dungory West · 31 homes approved Oct 2026, not started · 333 m

    Empty land zoned for homes 10

    • 32.1 ha zoned for homes · no homes built on it yet · 47 m
    • 40.5 ha zoned for homes · no homes built on it yet · 93 m
    • 51.5 ha zoned for homes · no homes built on it yet · 126 m
    • 61.6 ha zoned for homes · no homes built on it yet · 147 m
    • 70.2 ha zoned for homes · no homes built on it yet · 179 m
    • 80.5 ha zoned for homes · no homes built on it yet · 196 m
    • 0.3 ha zoned for homes · no homes built on it yet · 211 m
    • 1.3 ha zoned for homes · no homes built on it yet · 212 m
    • 0.8 ha zoned for homes · no homes built on it yet · 250 m
    • 0.8 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 4 and 10 a year; busiest 2024. 88% of decisions were approvals.

    2021: 3, 2022: 4, 2023: 5, 2024: 10, 2025: 6, 2026: 505102021: 3 approved3’21*2022: 2 approved2022: 2 refused4’222023: 5 approved5’232024: 9 approved2024: 1 refused10’242025: 6 approved6’252026: 4 approved2026: 1 refused5’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 9 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 1 in the last 12 months
    1 not signed off
    • 7 Cuil an Ri, Kinvarra, Galway · 14 May 2026 · 1 homes · start notice not signed off · 24/60682 · 413 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 31 not started
    • Dungory West · 45 homes · building started · 217 m
    • 1Dungory West · 31 homes · not started · runs out 15 Oct 2031 · 333 m
    • Cartron · 28 homes · building started · 329 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Kinvara Community Children's Centre · Crèche23 Jan 2025 · report · Tusla Early Years Inspectorate606 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Galway County Council.
    Homes approved
    Here76
    Council middle0
    Homes started
    Here64
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    72% owner-occupied (council 75%).

    Homes built before 1971
    19% · council 23%
    Homes built since 2001
    60% · council 39%
    Owner-occupied
    72% · council 75%
    Rented
    18% · council 18%
    Children under 15
    23% · council 21%
    Aged 65 and over
    15% · council 17%
    Households with 2+ cars
    56% · council 52%
    Work mainly from home
    18% · council 11%
    This small area (276 people)Galway

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 067154003

    Bus
    495 m
    Kinvara · 350, 351 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    353 m
    Seamount College, 628 pupils
    Homes sold nearby
    3
    in 3 years, 2 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Seamount College · postprimary · 628 pupils · 353 m
    • S N Naomh Iosef · primary · 324 pupils · 776 m

    Stops 2

    • Kinvara · 350, 351 · 1/hour at peak · 495 m
    • Kinvara · 350, 351 · 1/hour at peak · 501 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Seamount College · 353 m0% pupils (628)
    • S N Naomh Iosef · 776 m+2.5% pupils (324)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Dungory West
    Electoral division
    Kinvarra
    Electoral area
    Gort-Kinvara
    Council
    Galway County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); heritage-listed; on the vacant land tax map.
    • Flood Zone A 33 m away on the Galway County Development Plan 2022-2028 flood map.
    • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
    • 31 homes approved nearby, not started; largest 31 at Dungory West.
    • Kinvara (bus 350, 351) 495 m away: 1 an hour at morning peak.
    • Here (2022 census): 72% owner-occupied (council 75%); 24% of homes empty (council 16%); most built 2001–2010; 64% drive to work (council 66%); population up 1% since 2016.
    • Around here the council decides in a median 54 days (about 8 weeks); 1 in 7 is asked for more information.
    • 9 applications nearby in the last 12 months; 88% approved (council 87%).
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher30 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    services1.arcgis.com—CC BY 4.0—
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 20:23 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.