PlanningRegister.ie
Planning report · Wicklow County Council · 500 m around the house · the last 12 months · 25 Oct 2026, 21:09

170 Heathervue

53.14331, -6.06985

Homes here mostly date from the 1980s. 3 planning files on this house, the latest from 2026. Home extensions nearby almost always get approved (92%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992). 3 planning files on this house, the latest from 2026.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990. 3 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of GreystonesBuilt: most homes in this small area date from 1981–1990 (census estimate)most built2026: 2660467 · attic or dormer, approved2026: 2660460 · attic or dormer, withdrawn or invalid2022: 22516 · attic or dormer, approved2021: 31 files on Greystones2022: 26 files on Greystones2023: 16 files on Greystones2024: 7 files on Greystones2025: 20 files on Greystones2026: 20 files on Greystones120 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    2660467 · attic or dormer · approved 2026 · not started, runs out 2031
    approvedstartedsigned off
  2. 2026
    2660460 · attic or dormer · withdrawn
    approved?started?signed off?
  3. 2022
    22516 · attic or dormer · approved 2022 · not started, runs out 2027
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities of existing residential areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

greystones delgany kilcoole local planning framework lpf · 9 Feb 2026 – 23 Oct 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings38Eyrefield Lodge; Sommerville House
Radon grid squares1
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 13 on the draft 2027 map; 13 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, EPA radon map · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 81–100% by type. A new house in a garden is harder: 79% approved, and 69% are asked for more information.

Single-storey rear37 decided · more info asked 19%
95% · council 95%
Two-storey rear17 decided · more info asked 59%
94% · council 90%
Single-storey side13 decided · more info asked 8%
100% · council 99%
Attic or dormer122 decided · more info asked 26%
94% · council 92%
First-floor17 decided · more info asked 24%
82% · council 92%
Porch or front16 decided · more info asked 25%
81% · council 93%
New house in a garden or site48 decided · more info asked 69%
79% · council 82%
Approved nearbyWicklow overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 270 nearby, 2,142 council-wide

Figure 3

Greystones, file by file since 2021

51 of 55 decided extensions on the road were approved. New houses in side gardens or on sites: 5 of 9.

120 planning files on Greystones since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · porch / front · approved · 211088No. 195 · 2021 · single-storey rear · approved · 211239No number · 2021 · two-storey rear · approved · 211383No. 122 · 2021 · porch / front · approved · 211393No number · 2021 · other extension · approved · 21194No. 4 · 2021 · attic conversion / dormer · approved · 21298No number · 2021 · porch / front · refused · 21370No number · 2021 · single-storey rear · approved · 21421No number · 2021 · first-floor · approved · 21569No number · 2021 · attic conversion / dormer · approved · 21736No number · 2021 · porch / front · approved · 21794No number · 2021 · single-storey rear · approved · 21921No number · 2022 · first-floor · approved · 221052No. 6 · 2022 · attic conversion / dormer · approved · 221246No. 12 · 2022 · two-storey rear · approved · 221333No. 159 · 2022 · single-storey side · approved · 22134No number · 2022 · single-storey side · approved · 22157No. 3 · 2022 · single-storey rear · approved · 22183No number · 2022 · garage conversion · approved · 22360No. 167 · 2022 · attic conversion / dormer · approved · 22392No. 170 · 2022 · attic conversion / dormer · approved · 22516No number · 2022 · attic conversion / dormer · approved · 22551No number · 2022 · first-floor · refused · 22670No. 140 · 2022 · attic conversion / dormer · approved · 22828No number · 2022 · rear · approved · 22889No. 5 · 2022 · attic conversion / dormer · approved · 22970No number · 2022 · side · approved · 22977No. 133 · 2023 · attic conversion / dormer · approved · 23324No number · 2023 · attic conversion / dormer · approved · 2368No. 13 · 2023 · attic conversion / dormer · refused · 2383No number · 2023 · single-storey rear · refused · 23852No. 4 · 2023 · attic conversion / dormer · approved · 2395No number · 2024 · other extension · approved · 24458No number · 2024 · single-storey rear · approved · 2460800No number · 2025 · other extension · approved · 25144No number · 2025 · rear · approved · 2544No. 116 · 2025 · two-storey rear · approved · 2560101No number · 2025 · single-storey rear · approved · 2560425No number · 2025 · attic conversion / dormer · approved · 2560493No. 2 · 2025 · two-storey rear · approved · 2560856No. 116 · 2025 · two-storey side · approved · 2560890No number · 2025 · porch / front · approved · 2560907No. 196 · 2025 · single-storey side · approved · 2561000No number · 2025 · single-storey side · approved · 2561023No number · 2026 · rear · approved · 26123No. 1 · 2026 · other extension · approved · 2660152No number · 2026 · single-storey rear · approved · 2660227No number · 2026 · rear · approved · 2660274No. 3 · 2026 · rear · approved · 2660276No. 196 · 2026 · single-storey side · approved · 2660306No. 96 · 2026 · attic conversion / dormer · approved · 2660339No. 168 · 2026 · attic conversion / dormer · approved · 2660467No number · 2026 · rear · approved · 2660489No number · 2026 · first-floor · approved · 2660576No. 24 · 2026 · single-storey side · approved · 2660641Porches, roofs, otherNo. 1 · 2021 · other work · approved · 211089No number · 2021 · other work · approved · 211232No. 1 · 2021 · other work · approved · 211321No number · 2021 · other work · approved · 211322No number · 2021 · other work · approved · 211337No. 1 · 2021 · other work · approved · 211409No number · 2021 · other work · approved · 21225No number · 2021 · other work · approved · 21261No number · 2021 · other work · approved · 21266No number · 2021 · other work · refused · 2130No. 53 · 2021 · other work · approved · 21454No. 4A · 2021 · other work · approved · 21456No. 2 · 2021 · other work · approved · 21608No number · 2021 · other work · approved · 21693No number · 2021 · other work · refused · 21717No number · 2021 · other work · refused · 21803No number · 2021 · other work · approved · 21851No number · 2022 · other work · approved · 221024No number · 2022 · other work · approved · 221149No number · 2022 · other work · approved · 221161No number · 2022 · other work · approved · 221325No number · 2022 · other work · refused · 22218No number · 2022 · other work · refused · 22428No. 1 · 2022 · other work · approved · 22512No number · 2022 · other work · approved · 22549No number · 2022 · other work · approved · 22566No number · 2022 · other work · approved · 22749No number · 2023 · other work · refused · 23114No number · 2023 · other work · refused · 2317No number · 2023 · other work · approved · 23257No number · 2023 · other work · refused · 2360098No number · 2023 · other work · approved · 2360408No number · 2023 · other work · approved · 23665No number · 2023 · other work · refused · 23763No number · 2023 · other work · approved · 23777No number · 2023 · other work · approved · 23908No number · 2024 · other work · approved · 2460117No number · 2024 · other work · approved · 2460394No number · 2024 · other work · approved · 2460502No number · 2024 · other work · refused · 2460620No number · 2024 · other work · approved · 2460755No number · 2025 · other work · approved · 25241No number · 2025 · other work · approved · 2536No number · 2025 · other work · refused · 2560329No number · 2025 · other work · approved · 2560436No number · 2025 · other work · refused · 2560445No number · 2025 · other work · approved · 2560699No number · 2026 · other work · approved · 26148No number · 2026 · other work · approved · 2656No. 41 · 2026 · other work · approved · 2657No number · 2026 · other work · approved · 2660026No number · 2026 · other extension · approved · 2660180No number · 2026 · other work · approved · 2660282No number · 2026 · other work · approved · 2660368No number · 2026 · single-storey rear · approved · 2660519No number · 2026 · other work · approved · 2660732New house in a side gardenNo number · 2021 · new house · approved · 21221No number · 2021 · new house · refused · 21980No number · 2022 · new house · refused · 22785No number · 2023 · new house · approved · 23108No number · 2023 · new house · approved · 2360008No. 12 · 2025 · new house · approved · 256035312No number · 2025 · new house · refused · 2560356No. 11A · 2025 · new house · approved · 2560476No number · 2025 · new house · refused · 2560923
ApprovedRefusedWithdrawn or invalid

120 files with "Greystones" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 7 within 250 m · 0 refused within 100 m

Extensions and refusals near you 7 extensions within 250 m · the last 12 months

6 of 6 approved (100%) · most common: dormer or attic

6 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic32—
Single-storey side22—
Single-storey rear11—
Two-storey side11—

On Heathervue: 20 extensions in 10 years, 94% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 25 Oct 2026, 01:30
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 49 days. 1 in 4 is asked for more information, which adds about 63 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; If more info asked (1 in 4): 110 days; Appeal window: 4 weeks; Building starts: 150 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 45–53 (n=209)49 daysIf more info asked (1 in 4)With further information: median 110 days (n=81)110 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 150 days after permission (n=95)150 days after permissionSigned off61% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated290 decided home extensions, 95 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    7 of 22 appealed refusals became permissions. 3 of 24 appealed approvals were reversed.

    Refusals appealed22 decided
    7 became permissions
    Approvals appealed24 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months
    • 501928 Pending · 'Cashel' , Hillside Road , Greystones. Co. Wicklow. · 257 m
    • 324539 Pending · Lands at Greystones Golf Club, Killincarrig, Greystones, Co. Wicklow · 247 m
    • 500686 Refused · Nullamore , Whitshed Road , Greystones, Co. Wicklow · 423 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 25 Oct 2026, 01:30
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher24 Oct 2026, 23:01open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Question 4

    What's changing around you?

    Street map around 170 Heathervue with 15 numbered planning items
    ⌖ the houseEmpty land zoned for homesApprovedNo decision yet
    1. 12.8 ha zoned for homesEmpty land zoned for homes · 178 m
    2. 21.8 ha zoned for homesEmpty land zoned for homes · 183 m
    3. 31.1 ha zoned for homesEmpty land zoned for homes · 270 m
    4. 44.2 ha zoned for homesEmpty land zoned for homes · 294 m
    5. 52.9 ha zoned for homesEmpty land zoned for homes · 302 m
    6. 61.6 ha zoned for homesEmpty land zoned for homes · 308 m
    7. 7168 Heathervue, Greystones 2660467Approved with conditions · 11 m
    8. 8196 Heathervue, Greystones 2660306Approved with conditions · 26 m
    9. 996 Heathervue, Rathdown Lower 2660339Approved with conditions · 153 m
    10. 10116 Heathervue, Greystones 2560890Approved with conditions · 181 m
    11. 11The Brambles, Hillside Road 2660227Approved with conditions · 211 m
    12. 12'Cashel', Hillside Road 2656Approved with conditions · 257 m
    13. 138 Hillside, Greystones 2660490No decision yet · 258 m
    14. 14Hillside Rd Rathdown Lower, Greystones 2660576Approved with conditions · 287 m
    15. 1524 Heathervue, Greystones 2660641Approved with conditions · 300 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 68 permissions since 2016, 26 show a start notice and 3 have a completion certificate. Most owners opt out of sign-off.

    77 applications lodged within 500 m. Council: 67 approved, 10 refused. After appeals: 68 approved. Of those: 3 signed off, 16 built with the owner's opt-out, 7 started, 41 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT67: lodged → approved10: lodged → refused66: approved → approved8: refused → refused1 approved by the council, refused after an appeal2 refused by the council, approved after an appeal41: approved → no start notice found16: approved → built, owner opted out7: approved → started, not signed off3: approved → signed off1: approved → ran out77 lodged77 lodged67 approved67 approved10 refused10 refused68 approved68 approved9 refused9 refused41 no start notice found41 no start notice found16 built, owner opted out16 built, owner opted out7 started, not signed off7 started, not signed off3 signed off3 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured77 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      DART+ Coastal South is planned 540 m away.

      DART+ Coastal South, DART+…: proposed (stage 1: Bray-Greystones 2 to 3 trains per hour); DART+ Coastal South,…: proposed (stage 1: Bray-Greystones 2 to 3 trains per hour)20242025202620272028DART+ Coastal South, DART+…540 m · plannedproposed (stage 1: Bray-Greystones 2 to 3 trains per hour)DART+ Coastal South,…589 m · plannedproposed (stage 1: Bray-Greystones 2 to 3 trains per hour)today

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 10 within 500 m

      Empty land zoned for homes 10

      • 12.8 ha zoned for homes · no homes built on it yet · 178 m
      • 21.8 ha zoned for homes · no homes built on it yet · 183 m
      • 31.1 ha zoned for homes · no homes built on it yet · 270 m
      • 44.2 ha zoned for homes · no homes built on it yet · 294 m
      • 52.9 ha zoned for homes · no homes built on it yet · 302 m
      • 61.6 ha zoned for homes · no homes built on it yet · 308 m
      • 7.2 ha zoned for homes · no homes built on it yet · 374 m
      • 1.9 ha zoned for homes · no homes built on it yet · 382 m
      • 1.8 ha zoned for homes · no homes built on it yet · 457 m
      • 1.5 ha zoned for homes · no homes built on it yet · 461 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 25 Oct 2026, 01:46
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
      Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
      Figure 9

      Applications within 500 m, by year

      Between 4 and 19 a year; busiest 2022. 87% of decisions were approvals.

      2021: 18, 2022: 19, 2023: 7, 2024: 4, 2025: 13, 2026: 16051015202021: 14 approved2021: 4 refused18’21*2022: 17 approved2022: 2 refused19’222023: 6 approved2023: 1 refused7’232024: 3 approved2024: 1 refused4’242025: 11 approved2025: 2 refused13’252026: 16 approved16’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 25 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 25 Oct 2026, 01:46
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
      Building work nearby 6 in the last 12 months
      2 signed off as finished2 not signed off2 no sign-off needed
      • Hillside Road, Greystones, Wicklow, A63N159 · 19 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 26/60227 · 234 m
      • Church Road, Greystones, Wicklow, A63H424 · 29 Sept 2026 · 1 homes · short notice no sign-off needed · 26/60519 · 433 m
      • 6 Church Road, Greystones, Wicklow, A63 NA47 · 23 Jun 2026 · 7-day notice signed off · 25/60436 · 464 m
      • Hillside Road, Greystones, Wicklow · 4 Jun 2026 · 14 homes · start notice not signed off · ABP-318662-23 & 23/257 & 25/241 · 277 m
      • Church Road, Greystones, Wicklow, A63 W624 · 30 Apr 2026 · 7-day notice signed off · 397 m
      • Meridian Point, Church Road, Greystones, Wicklow · 12 Nov 2025 · start notice not signed off · 24/60502 · 435 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 25 Oct 2026, 01:46
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
      Homes coming 0 not started
      • 12'Cashel' · 14 homes · under appeal · runs out 30 Jul 2031 · 270 m
      • 'Cashel' · 14 homes · building started · 270 m
      • 'Cashel' · 14 homes · building started · 270 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 25 Oct 2026, 01:46
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Heathervue · 21 applications in 10 years · 94% approved · most common: attic conversion / dormer

      Crèches and schools inspected

      NameLatest inspectionDistance
      Smiley Sunflowers Pre-school · Crèche28 Nov 2024 · report · Tusla Early Years Inspectorate619 m
      The Cove Preschool · Crèche14 May 2025 · report · Tusla Early Years Inspectorate653 m
      Footprints Montessori Pre- school · Crèche30 Sept 2025 · report · Tusla Early Years Inspectorateapprox. 788 m
      Orahova Montessori School · Crèche18 Sept 2024 · report · Tusla Early Years Inspectorate871 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
      SourceLicenceFetchedLink
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register21 Oct 2026, 23:37open
      How busy is this area Busier than most of Wicklow County Council.
      Homes approved
      Here42
      Council middle0
      Homes started
      Here110
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      11% of homes built before 1971 (council 26%). 97% owner-occupied (council 71%).

      Homes built before 1971
      11% · council 26%
      Homes built since 2001
      0% · council 32%
      Owner-occupied
      97% · council 71%
      Rented
      2% · council 24%
      Children under 15
      15% · council 21%
      Aged 65 and over
      23% · council 15%
      Households with 2+ cars
      36% · council 48%
      Work mainly from home
      23% · council 14%
      This small area (246 people)Wicklow

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 257039019

      Bus
      187 m
      Bellevue Road · L1, L2 · busiest stop within 500 m: 9 an hour at peak
      Planned
      540 m
      DART+ Coastal South, DART+ Coastal South: Bray (Daly) - Greystones
      Nearest school
      616 m
      St Brigids School, 396 pupils
      Homes sold nearby
      31
      in 3 years, 1 new (Property Price Register)
      Schools, stops and the council

      Schools

      • St Brigids School · primary · 396 pupils · 616 m
      • St Patrick's National School · primary · 385 pupils · 619 m
      • St David's Holy Faith Secondary · postprimary · 792 pupils · 665 m
      • Scoil Naomh Caoimhghin · primary · 459 pupils · 713 m

      Stops 29

      • Bellevue Road · L1, L2 · 4/hour at peak · 187 m
      • Bellevue Road · L1, L2 · 4/hour at peak · 214 m
      • Greystones SC · L1, L2 · 4/hour at peak · 385 m
      • Greystones SC · L1, L2 · 4/hour at peak · 421 m
      • Greystones Village · L1, L2, L3, X1, X2 · 9/hour at peak · 428 m
      • Greystones Village · 84n, L1, L2, L3, X1, X2 · 6/hour at peak · 453 m
      • Greystones Station · L1, L2, L3, X1, X2 · 9/hour at peak · 574 m
      • La Touche Road · 84n, L3 · 2/hour at peak · 582 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Brigids School · 616 m+1.8% pupils (396) · an extension 2025, approved with conditions
      • St Patrick's National School · 619 m-5.4% pupils (385)
      • St David's Holy Faith Secondary · 664 m+2.6% pupils (792)
      • Scoil Naomh Caoimhghin · 713 m+0.2% pupils (459)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 25 Oct 2026, 01:51
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      Council consultation portalsPublic25 Oct 2026, 01:52open
      Council meetings (ModernGov)Public25 Oct 2026, 01:51open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Attic or dormer (2660467) approved 2026, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      2. Attic or dormer (22516) approved 2022, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Rathdown Lower
      Electoral division
      Greystones
      Electoral area
      Greystones
      Council
      Wicklow County Council
      Everything we found, as a list 8 lines
      • 3 applications on this site; latest 2660467, approved 2026, not started, runs out 2031.
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 10 sites nearby could change: 10 empty zoned plots.
      • Greystones Village (bus L1, L2) 428 m away: 9 an hour at morning peak; 30 from all stops within 500 m. Planned: DART+ Coastal South 540 m away, proposed (stage 1: Bray-Greystones 2 to 3 trains per hour).
      • Here (2022 census): 97% owner-occupied (council 71%); 5% of homes empty (council 7%); most built 1981–1990; 43% drive to work (council 58%).
      • 7 home extensions within 250 m since 2025: 6 approved (100%). Most were dormers or attic conversions. On Heathervue: 20 in 10 years, 94% approved.
      • Around here the council decides in a median 53 days (about 8 weeks); 39% are asked for more information.
      • Homes started within 1 km: 34 in the last year, 35 three years before.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.025 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public25 Oct 2026
      www2.courts.ie—© the publisher24 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public25 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.025 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence25 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
      water.ie—© the publisher · flag only—
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 25 Oct 2026, 21:09 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.