PlanningRegister.ie
Planning report · Wicklow County Council · 500 m around the house · the last 12 months · 29 Oct 2026, 20:31

Redford Rise

53.15233, -6.08072

Homes here mostly date from the 1980s. 1 planning file on this house, the latest from 2021. Home extensions nearby almost always get approved (94%). 3 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992). 1 planning file on this house, the latest from 2021.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1981–1990 (census estimate)most built2021: 21490 · driveway, approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    21490 · driveway · approved 2021 · ran out unbuilt
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities of existing residential areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

greystones delgany kilcoole local planning framework lpf · 9 Feb 2026 – 23 Oct 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings2Slieve Cillín; Saint Kilian's Catholic Church
Radon grid squares2
Monuments1R181683
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 10 on the draft 2027 map; 10 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 79–96% by type. A new house in a garden is harder: 81% approved, and 1 in 2 are asked for more information.

Single-storey rear23 decided · more info asked 17%
96% · council 95%
Two-storey rear15 decided · more info asked 47%
93% · council 90%
Attic or dormer97 decided · more info asked 23%
95% · council 92%
First-floor14 decided · more info asked 14%
79% · council 92%
New house in a garden or site43 decided · more info asked 60%
81% · council 82%
Approved nearbyWicklow overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 192 nearby, 1,895 council-wide

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

2 approved1 refused
KindAppliedApprovedRefused
Two-storey rear211
Single-storey rear11—

On Redford Park: 29 extensions in 10 years, 74% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 49 days. 1 in 4 is asked for more information, which adds about 52 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; If more info asked (1 in 4): 105 days; Appeal window: 4 weeks; Building starts: 159 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 45–52 (n=160)49 daysIf more info asked (1 in 4)With further information: median 105 days (n=49)105 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 159 days after permission (n=65)159 days after permissionSigned off63% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated209 decided home extensions, 65 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    2 of 11 appealed refusals became permissions. 1 of 16 appealed approvals were reversed.

    Refusals appealed11 decided
    2 became permissions
    Approvals appealed16 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 4 in the last 12 months
    • 502163 Pending · Chrysanthemum Cottage , Chapel Road , Greystones · 428 m
    • 501763 Pending · ""Little Acre" New Rd Rathdown Lower , Greystones , Co. Wicklow · 468 m
    • 500993 Refused · 178 Redford Park, Greystones, Co. Wicklow · 486 m
    • 501004 Invalid · 178 Redford Park, Greystones, Co. Wicklow · 486 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher28 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 4

    What's changing around you?

    Street map around Redford Rise with 15 numbered planning items
    ⌖ the houseOpen for commentsRefusedEmpty land zoned for homesApproved
    1. 11 La Touche Park, Greystones 2660935No decision yet · 336 m
    2. 2Roslyn, Blacklion 2660903No decision yet · 352 m
    3. 310 Redford Court, Rathdown Lower 2660912No decision yet · 376 m
    4. 434 Blacklion, Greystones 2660129Refused · 196 m
    5. 50.6 ha zoned for homesEmpty land zoned for homes · 256 m
    6. 60.5 ha zoned for homesEmpty land zoned for homes · 314 m
    7. 70.6 ha zoned for homesEmpty land zoned for homes · 369 m
    8. 80.3 ha zoned for homesEmpty land zoned for homes · 375 m
    9. 90.2 ha zoned for homesEmpty land zoned for homes · 392 m
    10. 101.5 ha zoned for homesEmpty land zoned for homes · 437 m
    11. 11Baywind, 156 Redford Park 2660048Approved with conditions · 107 m
    12. 12Robeen, Blacklion 2660627Approved with conditions · 260 m
    13. 13Gorselands, Monterey Road 2660305Approved with conditions · 315 m
    14. 14Lands to the rear of “Slieve Cillín”, Blacklion 2560970Approved with conditions · 331 m
    15. 15103 Redford Park, Greystones 2660482Approved with conditions · 349 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 76 permissions since 2016, 27 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    91 applications lodged within 500 m. Council: 76 approved, 15 refused. After appeals: 76 approved. Of those: 0 signed off, 20 built with the owner's opt-out, 7 started, 46 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT76: lodged → approved15: lodged → refused76: approved → approved15: refused → refused46: approved → no start notice found20: approved → built, owner opted out7: approved → started, not signed off3: approved → ran out91 lodged91 lodged76 approved76 approved15 refused15 refused76 approved76 approved15 refused15 refused46 no start notice found46 no start notice found20 built, owner opted out20 built, owner opted out7 started, not signed off7 started, not signed off3 ran out3 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured91 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    3 deadlines within 500 m; the first closes 12 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-12 2660903: application received — 1. new two storey 4 bedroom dwelling comprising 182 sq.m. located to the side of existing dwelling, 2. block up existing; 2026-11-16 2660912: application received — conversion of existing single-storey 3 bedroom 133.7m² bungalow to a two-storey dormer bungalow, works will consist of r; 2026-11-23 2660935: application received — the conversion of the attic space and the provision of two new windows at attic height, one on the front elevation and otoday3 Nov8 Nov13 Nov18 Nov23 Nov28 Nov2660903: application received — 1. new two storey 4 bedroom dwelling comprising 182 sq.m. located to the side of existing dwelling, 2. block up existing · 352 m away · 2026-11-122660912: application received — conversion of existing single-storey 3 bedroom 133.7m² bungalow to a two-storey dormer bungalow, works will consist of r · 376 m away · 2026-11-162660935: application received — the conversion of the attic space and the provision of two new windows at attic height, one on the front elevation and o · 336 m away · 2026-11-23
    Comments close
    • Comments close 12 Nov 202614 days left
      22660903 · application received — 1. new two storey 4 bedroom dwelling comprising 182 sq.m. located to the side of existing…
      €20 to the council · 352 m away
    • Comments close 16 Nov 202618 days left
      32660912 · application received — conversion of existing single-storey 3 bedroom 133.7m² bungalow to a two-storey dormer bungalow,…
      €20 to the council · 376 m away
    • Comments close 23 Nov 202625 days left
      12660935 · application received — the conversion of the attic space and the provision of two new windows at attic height, one on…
      €20 to the council · 336 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    DART+ Coastal South is planned 543 m away.

    DART+ Coastal South, DART+…: proposed (stage 1: Bray-Greystones 2 to 3 trains per hour)20242025202620272028DART+ Coastal South, DART+…543 m · plannedproposed (stage 1: Bray-Greystones 2 to 3 trains per hour)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 9 within 500 m

    Empty land zoned for homes 9

    • 50.6 ha zoned for homes · no homes built on it yet · 256 m
    • 60.5 ha zoned for homes · no homes built on it yet · 314 m
    • 70.6 ha zoned for homes · no homes built on it yet · 369 m
    • 80.3 ha zoned for homes · no homes built on it yet · 375 m
    • 90.2 ha zoned for homes · no homes built on it yet · 392 m
    • 101.5 ha zoned for homes · no homes built on it yet · 437 m
    • 0.2 ha zoned for homes · no homes built on it yet · 444 m
    • 0.6 ha zoned for homes · no homes built on it yet · 457 m
    • 0.5 ha zoned for homes · no homes built on it yet · 470 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 11 and 22 a year; busiest 2025. 84% of decisions were approvals.

    2021: 15, 2022: 11, 2023: 17, 2024: 12, 2025: 22, 2026: 1401020302021: 14 approved2021: 1 refused15’21*2022: 8 approved2022: 3 refused11’222023: 13 approved2023: 4 refused17’232024: 11 approved2024: 1 refused12’242025: 18 approved2025: 4 refused22’252026: 12 approved2026: 2 refused14’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 29 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Building work nearby 10 in the last 12 months
    1 not signed off9 no sign-off needed
    • New Road, Greystones, Wicklow · 14 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60781 · 479 m
    • Bellevue Demesne, Greystones, Wicklow · 18 Sept 2026 · 3 homes · start notice not signed off · 25/60970 · 350 m
    • New Road, Greystones, Wicklow · 21 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 25275 · 445 m
    • 10 Waverly Avenue, Greystones, Wicklow, A63 DX93 · 6 Aug 2026 · 1 homes · short notice no sign-off needed · 2560706 · 416 m
    • Chapel Road, Greystones, Wicklow · 22 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60912 · 454 m
    • Rathdown Road, Greystones, Wicklow, A63 KD39 · 2 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2660091 · 453 m
    • New Road, Greystones, Wicklow · 27 Apr 2026 · short notice no sign-off needed · 2560260 · 348 m
    • Gorselands, Monterey Road, Greystones, Wicklow, A6 WV65 · 27 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2560260 · 348 m
    • Chapel Road, Greystones, Wicklow · 30 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 24340 · 388 m
    • 244 Redford Park, Greystones, Wicklow, A63 T324 · 1 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 2460817 · 492 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 29 Oct 2026, 02:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Redford Park · 41 applications in 10 years · 74% approved · most common: attic conversion / dormer

    Crèches and schools inspected

    NameLatest inspectionDistance
    The Nest School · Crèche29 Apr 2026 · report · Tusla Early Years Inspectorate287 m
    Naionra na gCloch Liath · Crèche13 Oct 2025 · report · Tusla Early Years Inspectorate426 m
    Little Stars on the Lane · Crèche20 May 2026 · report · Tusla Early Years Inspectorate511 m
    The Convent Montessori · Crèche12 Dec 2025 · report · Tusla Early Years Inspectorate796 m
    Smiley Sunflowers Pre-school · Crèche28 Nov 2024 · report · Tusla Early Years Inspectorate860 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Wicklow County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here56
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    5% of homes built before 1971 (council 26%). 82% owner-occupied (council 71%).

    Homes built before 1971
    5% · council 26%
    Homes built since 2001
    5% · council 32%
    Owner-occupied
    82% · council 71%
    Rented
    17% · council 24%
    Children under 15
    20% · council 21%
    Aged 65 and over
    23% · council 15%
    Households with 2+ cars
    43% · council 48%
    Work mainly from home
    29% · council 14%
    This small area (203 people)Wicklow

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 257039012

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    49 m
    Redford Park · 84n, L1, L2 · busiest stop within 500 m: 9 an hour at peak
    Planned
    543 m
    DART+ Coastal South, DART+ Coastal South: Bray (Daly) - Greystones
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    277 m
    Greystones Educate Together National School, 440 pupils
    Homes sold nearby
    37
    in 3 years, 1 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Greystones Educate Together National School · primary · 440 pupils · 277 m
    • Temple Carrig Secondary School · postprimary · 931 pupils · 290 m
    • Gaelscoil na gCloch Liath · primary · 227 pupils · 426 m
    • Scoil Naomh Caoimhghin · primary · 459 pupils · 542 m
    • St Patrick's National School · primary · 385 pupils · 860 m

    Stops 19

    • Redford Park · 84n, L1, L2, L3, X1, X2 · 6/hour at peak · 49 m
    • Redford Park · L1, L2, L3, X1, X2 · 9/hour at peak · 64 m
    • Chapel Road · 84n, L1, L2, L3, X1, X2 · 6/hour at peak · 268 m
    • Waverly · L3 · 2/hour at peak · 283 m
    • Chapel Road · L1, L2, L3, X1, X2 · 9/hour at peak · 306 m
    • Redford · 84n, L1, L2 · 4/hour at peak · 384 m
    • Redford · L1, L2 · 4/hour at peak · 388 m
    • St Kevin's NS · L3 · 2/hour at peak · 521 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Greystones Educate Together National School · 277 m-0.2% pupils (440)
    • Temple Carrig Secondary School · 290 m-1.6% pupils (931)
    • Gaelscoil na gCloch Liath · 426 m-11.3% pupils (227)
    • Scoil Naomh Caoimhghin · 542 m+0.2% pupils (459)
    • St Patrick's National School · 860 m-5.4% pupils (385)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Council consultation portalsPublic29 Oct 2026, 01:01open
    Council meetings (ModernGov)Public29 Oct 2026, 02:14open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Driveway (21490) ran out unbuilt in 2026: built anyway?
      Ask for: If built: proof it started in time, and an opinion of compliance.
      Seller · solicitor
    2. Application 336 m away open for comments until 23 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Rathdown Lower
    Electoral division
    Greystones
    Electoral area
    Greystones
    Council
    Wicklow County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 21490, approved 2021, ran out unbuilt.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Flood Zone A 46 m away on the Wicklow County Development Plan 2022-2028 flood map.
    • 9 sites nearby could change: 9 empty zoned plots.
    • 3 applications open for comments nearby; nearest closes 23 Nov 2026.
    • Redford Park (bus L1, L2) 64 m away: 9 an hour at morning peak; 39 from all stops within 500 m. Planned: DART+ Coastal South 543 m away, proposed (stage 1: Bray-Greystones 2 to 3 trains per hour).
    • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 82% owner-occupied (council 71%); 2% of homes empty (council 7%); most built 1981–1990; 54% drive to work (council 58%).
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.029 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public29 Oct 2026
    www2.courts.ie—© the publisher28 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    services.arcgis.com—CC BY 4.0—
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public29 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.029 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence29 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 29 Oct 2026, 20:31 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.