PlanningRegister.ie
Planning report · Kildare County Council · 500 m around the house · the last 12 months · 26 Oct 2026, 18:11

Ballymany Manor

53.16632, -6.81308

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (99%). 98 homes approved 167 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BallymanyBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 3 files on Ballymany2022: 3 files on Ballymany2023: 3 files on Ballymany2024: 2 files on Ballymany2025: 4 files on Ballymany15 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential / Infill: To protect and enhance the amenity of established residential communities and promote sustainable intensification.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

kildare county development plan 2023 2029 newbridge settlement plan · 23 Feb 2026 – 23 Mar 2029

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Mapaex Health And Personalcare Ireland Private Limited (621 m); Curragh Tintawn Carpets Limited (650 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares1
Monuments3Mound; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 93% approved, and 1 in 2 are asked for more information.

Single-storey rear22 decided · more info asked 32%
100% · council 97%
Two-storey rear11 decided · more info asked 18%
100% · council 93%
First-floor14 decided · more info asked 21%
100% · council 93%
New house in a garden or site14 decided · more info asked 57%
93% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 61 nearby, 1,935 council-wide

Figure 3

Ballymany, file by file since 2021

2 of 2 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

15 planning files on Ballymany since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 7 · 2022 · two-storey rear · approved · 221435No number · 2025 · other extension · approved · 2561430Porches, roofs, otherNo number · 2021 · other work · refused · 21310912No number · 2021 · other work · approved · 21311040No number · 2022 · other work · approved · 221258No number · 2022 · other work · approved · 22312704No number · 2023 · other work · refused · 2360374No number · 2023 · other work · approved · 2360396No number · 2024 · other work · approved · 2460906No number · 2024 · other work · approved · 2461319No number · 2025 · other work · approved · 2560025No. 677 · 2025 · other work · refused · 2560409No. 2 · 2025 · other work · refused · 2560416New house in a side gardenNo. 683 · 2021 · new house · approved · 211709683No. 682 · 2023 · new house · approved · 2360380682
ApprovedRefusedWithdrawn or invalid

15 files with "Ballymany" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Single-storey rear11—

On Ballymany Manor: 9 extensions in 10 years, 87% of all applications approved; most common two-storey rear.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 3 is asked for more information, which adds about 83 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 3): 132 days; Appeal window: 4 weeks; Building starts: 110 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 mo21 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–55 (n=65)52 daysIf more info asked (1 in 3)With further information: median 132 days (n=26)132 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 110 days after permission (n=22)110 days after permissionSigned off73% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated91 decided home extensions, 22 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    2 of 3 appealed refusals became permissions. 1 of 3 appealed approvals were reversed.

    Refusals appealed3 decided
    2 became permissions
    Approvals appealed3 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500607 Refused · Rear of 677 Ballymany Cottages, Ballymany, Newbridge, County Kildare. · 475 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher25 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 4

    What's changing around you?

    Street map around Ballymany Manor with 11 numbered planning items
    ⌖ the houseApproved, not startedApprovedNo decision yet
    1. 1Ballymany 21311040Approved, not started, approval runs out within a year · 167 m
    2. 26 Ballymany Manor, Newbridge 2561231Approved with conditions · 190 m
    3. 348 Rathcurragh, Green Road 2660001Approved with conditions · 266 m
    4. 427 Treacy Meadows, Newbridge 2660425Approved with conditions · 282 m
    5. 522 Treacy Meadows, Newbridge 2660363Approved with conditions · 283 m
    6. 6The Keadeen Hotel, Ballymany 2561430Approved with conditions · 288 m
    7. 7681 Ballymany Cottages, Ballymany 2660547No decision yet · 412 m
    8. 864 Curragh Farm, Newbridge 2660639Approved with conditions · 444 m
    9. 9677 Ballymany Cottages, Ballymany 2660855No decision yet · 474 m
    10. 10Greenmount Lodge, Green Road 2660229Approved with conditions · 493 m
    11. 11677 Ballymany Cottages, Newbridge 2561275Approved with conditions · 493 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 40 permissions since 2016, 7 show a start notice and 1 has a completion certificate. Most owners opt out of sign-off.

    44 applications lodged within 500 m. Council: 39 approved, 5 refused. After appeals: 40 approved. Of those: 1 signed off, 4 built with the owner's opt-out, 2 started, 30 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT39: lodged → approved5: lodged → refused39: approved → approved4: refused → refused1 refused by the council, approved after an appeal30: approved → no start notice found4: approved → built, owner opted out2: approved → started, not signed off1: approved → signed off3: approved → ran out44 lodged44 lodged39 approved39 approved5 refused5 refused40 approved40 approved4 refused4 refused30 no start notice found30 no start notice found4 built, owner opted out4 built, owner opted out2 started, not signed off2 started, not signed off1 signed off1 signed off3 ran out3 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured44 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      98 homes 167 m away were approved Nov 2021 with no start notice yet; the permission runs to Nov 2026.

      Ballymany · 98 homes: 98 homes approved, not started; runs out Nov 202620212022202320242025202620272028Ballymany · 98 homes167 m · 2131104098 homes approved, not started; runs out Nov 202698 homes approved, not started; runs out Nov 2026today

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 1 within 500 m

      Approved, not started, approval running out 1

      • Ballymany · 98 homes approved, not started; runs out Nov 2026 · 167 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 9

      Applications within 500 m, by year

      Between 4 and 9 a year; busiest 2022. 89% of decisions were approvals.

      2021: 11, 2022: 9, 2023: 6, 2024: 4, 2025: 9, 2026: 5051015202021: 9 approved2021: 2 refused11’21*2022: 9 approved9’222023: 5 approved2023: 1 refused6’232024: 4 approved4’242025: 7 approved2025: 2 refused9’252026: 5 approved5’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 15 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      Building work nearby 1 in the last 12 months
      1 not signed off
      • Creche Building, Pairc na Manach,, Ballymany, Newbridge,, Kildare · 20 Feb 2026 · 7-day notice not signed off · ABP-311040-21 · 170 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      Homes coming 98 not started
      • 1Ballymany · 98 homes · runs out soon · runs out 22 Nov 2026 · 167 m
      • Beechmount · 19 homes · building started · 407 m
      • Green Road · 10 homes · ran out · runs out 8 Jun 2023 · 318 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Ballymany Manor · 17 applications in 10 years · 87% approved · most common: two-storey rear

      Crèches and schools inspected

      NameLatest inspectionDistance
      Child’s Play Creche · Crèche29 Jul 2025 · report · Tusla Early Years Inspectorate692 m
      KARE Pre-School · Crèche19 Jun 2025 · report · Tusla Early Years Inspectorate795 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
      SourceLicenceFetchedLink
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register21 Oct 2026, 23:37open
      How busy is this area Busier than most of Kildare County Council.
      Homes approved
      Here31
      Council middle0
      Homes started
      Here566
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      0% of homes built before 1971 (council 16%). 75% owner-occupied (council 71%).

      Homes built before 1971
      0% · council 16%
      Homes built since 2001
      7% · council 40%
      Owner-occupied
      75% · council 71%
      Rented
      23% · council 24%
      Children under 15
      25% · council 22%
      Aged 65 and over
      5% · council 12%
      Households with 2+ cars
      56% · council 51%
      Work mainly from home
      13% · council 12%
      This small area (265 people)Kildare

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087069004

      Road noise
      55–59 dB
      day–night average (EPA 2022)
      Bus
      413 m
      Green Road · 126, 126A, 126B · busiest stop within 500 m: 1 an hour at peak
      Radon
      1 in 10
      homes here likely high (EPA). Test it
      Nearest school
      792 m
      Scoil Mhuire, 389 pupils
      Homes sold nearby
      92
      in 3 years, 63 new (Property Price Register)
      Schools, stops and the council

      Schools

      • Scoil Mhuire · primary · 389 pupils · 792 m
      • Scoil Mhuire Junior · primary · 333 pupils · 817 m
      • St Annes Special School · primary · 74 pupils · 862 m
      • Newbridge Educate Together NS · primary · 406 pupils · 866 m
      • Gaelscoil Chill Dara · primary · 288 pupils · 896 m

      Stops 9

      • Green Road · 126, 126A, 126B, 126E, 126U, 892 · 1/hour at peak · 413 m
      • Green Road · 126, 126A, 126D, 126T, 892 · 1/hour at peak · 427 m
      • Ballymany · UM06, UM14 · 534 m
      • Ballymany · UM14 · 1/hour at peak · 536 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Scoil Mhuire · 792 m+0.5% pupils (389)
      • Scoil Mhuire Junior · 817 m-5.1% pupils (333)
      • St Annes Special School · 862 m+1.4% pupils (74)
      • Newbridge Educate Together NS · 866 m-1.5% pupils (406)
      • Gaelscoil Chill Dara · 896 m-5.3% pupils (288)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 26 Oct 2026, 01:54
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      Council consultation portalsPublic26 Oct 2026, 00:55open
      Council meetings (ModernGov)Public26 Oct 2026, 01:54open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. High radon area (1 in 10 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      2. 98 homes approved 167 m away (Ballymany), not started: what is planned?
        Ask for: The planning file for 21311040.
        Council
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Ballymany
      Electoral division
      Morristownbiller
      Electoral area
      Newbridge
      Council
      Kildare County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
      • 1 site nearby could change: 1 approved scheme.
      • 98 homes approved nearby, not started; largest 98 at Ballymany.
      • Green Road (bus 126, 126A) 413 m away: 1 an hour at morning peak; 3 from all stops within 500 m.
      • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 75% owner-occupied (council 71%); 3% of homes empty (council 5%); most built 1991–2000; 64% drive to work (council 61%); population up 9% since 2016.
      • 1 home extension within 250 m since 2025. On Ballymany Manor: 9 in 10 years, 87% approved.
      • Around here the council decides in a median 63 days (about 9 weeks); 46% are asked for more information.
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.026 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public26 Oct 2026
      www2.courts.ie—© the publisher25 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public26 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.026 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence26 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 26 Oct 2026, 18:11 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.