PlanningRegister.ie
Planning report · Wicklow County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 19:19

Hollybrook Park, Kilruddery Demesne West

53.18105, -6.11010

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (95%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Hollybrook ParkBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 3 files on Hollybrook Park2022: 3 files on Hollybrook Park2023: 2 files on Hollybrook Park2024: 2 files on Hollybrook Park2025: 1 file on Hollybrook Park2026: 2 files on Hollybrook Park13 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities of existing residential areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

bray municipal district local area plan 2018 · 10 Jun 2018 – 23 Oct 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Alert Packaging Limited (550 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares2
Monuments2R149062; Road - road/trackway
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–93% by type. A new house in a garden is harder: 53% approved, and 1 in 5 is asked for more information.

Single-storey rear13 decided · more info asked 23%
92% · council 95%
Attic or dormer29 decided · more info asked 14%
93% · council 92%
New house in a garden or site15 decided · more info asked 20%
53% · council 82%
Approved nearbyWicklow overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 57 nearby, 1,672 council-wide

Figure 3

Hollybrook Park, file by file since 2021

12 of 12 decided extensions on the road were approved.

13 planning files on Hollybrook Park since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 95 · 2021 · attic conversion / dormer · approved · 21448No. 96 · 2021 · other extension · approved · 21695No. 129 · 2021 · attic conversion / dormer · approved · 21955No. 29 · 2022 · attic conversion / dormer · approved · 221360No. 40 · 2022 · attic conversion / dormer · approved · 22489No. 47 · 2022 · two-storey rear · approved · 22620No. 35 · 2023 · attic conversion / dormer · approved · 23118No. 26 · 2024 · attic conversion / dormer · approved · 24409No. 81 · 2024 · single-storey rear · approved · 2460010No. 49 · 2025 · two-storey side · approved · 2560461No. 123 · 2026 · single-storey rear · approved · 2660120No number · 2026 · attic conversion / dormer · approved · 2660140Porches, roofs, otherNo. 38 · 2023 · other work · approved · 23315New house in a side garden
ApprovedRefusedWithdrawn or invalid

13 files with "Hollybrook Park" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 approved
KindAppliedApprovedRefused
Dormer or attic11—
Single-storey rear11—

On Hollybrook Park: 14 extensions in 10 years, 100% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 49 days. 1 in 7 is asked for more information, which adds about 68 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; If more info asked (1 in 7): 114 days; Appeal window: 4 weeks; Building starts: 126 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 45–52 (n=68)49 daysIf more info asked (1 in 7)With further information: median 114 days (n=12)114 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 126 days after permission (n=32)126 days after permissionSigned off42% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated80 decided home extensions, 33 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    5 of 12 appealed refusals became permissions. 0 of 7 appealed approvals were reversed.

    Refusals appealed12 decided
    5 became permissions
    Approvals appealed7 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Hollybrook Park, Kilruddery Demesne West with 6 numbered planning items
    ⌖ the houseWindow closingBuilding startedApproved
    1. 1Southern Cross Road, Bray 2660088Approved with conditions · 369 m
    2. 2123 Hollybrook Park, Bray 26/60120Building started · 52 m
    3. 3Annough House133 Hollybrook Park, Southern Cross 2660140Approved with conditions · 76 m
    4. 4Takeda Ireland Ltd Bray Business Park, Kilruddery Bray 2660599Approved with conditions · 173 m
    5. 529 Swanbrook, Bray 2660703Approved with conditions · 455 m
    6. 6Suite One (Unit 1) Oriflame Building, IDA Business Park Southern Cross Road 2660080Approved with conditions · 493 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 28 permissions since 2016, 16 show a start notice and 3 have a completion certificate.

    28 applications lodged within 500 m. Council: 27 approved, 1 refused. After appeals: 28 approved. Of those: 3 signed off, 5 built with the owner's opt-out, 8 started, 12 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT27: lodged → approved1: lodged → refused27: approved → approved1 refused by the council, approved after an appeal12: approved → no start notice found5: approved → built, owner opted out8: approved → started, not signed off3: approved → signed off28 lodged28 lodged27 approved27 approved1 refused1 refused28 approved28 approved12 no start notice found12 no start notice found5 built, owner opted out5 built, owner opted out8 started, not signed off8 started, not signed off3 signed off3 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured28 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 5 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-05 2660088: CONDITIONAL — • provision of new vehicular entrance off Southern Cross Road with associated internal access road. • construction of 2 today6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec2660088: CONDITIONAL — • provision of new vehicular entrance off Southern Cross Road with associated internal access road. • construction of 2 · 369 m away · 2026-11-05
    Time to appeal ends
    • Time to appeal ends 5 Nov 20264 days left
      12660088 · CONDITIONAL — • provision of new vehicular entrance off Southern Cross Road with associated internal access road. •…
      €220 to An Coimisiún Pleanála (€110 observer) · 369 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 2 and 9 a year; busiest 2022. 96% of decisions were approvals.

    2021: 3, 2022: 9, 2023: 5, 2024: 3, 2025: 2, 2026: 605102021: 3 approved3’21*2022: 9 approved9’222023: 5 approved5’232024: 2 approved2024: 1 refused3’242025: 2 approved2’252026: 6 approved6’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 6 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 2 in the last 12 months
    2 no sign-off needed
    • 2123 Hollybrook Park, Bray, Wicklow, A98 YV81 · 13 Jul 2026 · 1 homes · short notice no sign-off needed · 26/60120 · 52 m
    • Takeda Ireland Ltd, Bray Business Park, Kilruddery, Wicklow, A98 CD36 · 3 Feb 2026 · short notice no sign-off needed · 25/60727 · 198 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Hollybrook Park · 15 applications in 10 years · 100% approved · most common: attic conversion / dormer

    Crèches and schools inspected

    NameLatest inspectionDistance
    Naíonra Ghleann na Darach · Crèche26 Mar 2026 · report · Tusla Early Years Inspectorate443 m
    Safari Childcare · Crèche31 Mar 2026 · report · Tusla Early Years Inspectorate503 m
    Belmont Montessori · Crèche20 Apr 2026 · report · Tusla Early Years Inspectorate549 m
    Scallywags Childcare · Crèche23 Sept 2025 · report · Tusla Early Years Inspectorate719 m
    Nexus ASD Pre- School · Crèche8 Oct 2024 · report · Tusla Early Years Inspectorate841 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Wicklow County Council.
    Homes approved
    Here178
    Council middle0
    Homes started
    Here18
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    0% of homes built before 1971 (council 26%). 89% owner-occupied (council 71%).

    Homes built before 1971
    0% · council 26%
    Homes built since 2001
    4% · council 32%
    Owner-occupied
    89% · council 71%
    Rented
    11% · council 24%
    Children under 15
    23% · council 21%
    Aged 65 and over
    6% · council 15%
    Households with 2+ cars
    58% · council 48%
    Work mainly from home
    16% · council 14%
    This small area (359 people)Wicklow

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 257051046

    Bus
    375 m
    Hollybrook Park · L14, X1, X2 · busiest stop within 500 m: 5 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Homes sold nearby
    15
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    None nearby.

      Stops 20

      • Hollybrook Park · L14, X1, X2 · 5/hour at peak · 375 m
      • Belmont · L14, X1, X2 · 2/hour at peak · 414 m
      • Bray Business Park · L14, X1, X2 · 2/hour at peak · 535 m
      • Southern Cross · L14, X1, X2 · 5/hour at peak · 602 m
      • Bray Business Park · L14, X1, X2 · 5/hour at peak · 632 m
      • Riddlesford · L14, X1, X2 · 2/hour at peak · 637 m

      Public land

      • The Industrial Development Authority · 19.19 ha · 77 m
      • Wicklow County Council · 1.24 ha · 348 m
      • Wicklow County Council · 0.98 ha · 423 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 02:24
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Building work started 52 m away: for how long?
        Ask for: The planning conditions for 26/60120.
        Agent · council
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Kilruddery Demesne West
      Electoral division
      Kilmacanoge
      Electoral area
      Bray West
      Council
      Wicklow County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • Nothing nearby looks set to change.
      • Hollybrook Park (bus L14, X1) 375 m away: 5 an hour at morning peak; 7 from all stops within 500 m.
      • Here (2022 census): 89% owner-occupied (council 71%); 3% of homes empty (council 7%); most built 1991–2000; 60% drive to work (council 58%); population up 3% since 2016.
      • 2 home extensions within 250 m since 2026. On Hollybrook Park: 14 in 10 years, 100% approved.
      • Around here the council decides in a median 51 days (about 7 weeks); 1 in 4 is asked for more information.
      • Homes started within 1 km: 11 in the last year, 120 three years before.
      • 6 applications nearby in the last 12 months; 100% approved (council 86%).
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 29
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 19:19 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.