Planning report · Kildare County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 07:45

Droighead Nua Urban ED, The Municipal District of Kildare — Newbridge, County Kildare, Leinster, Éire / Ireland

53.18207, -6.80429

Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (96%). A building site 297 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of NewbridgeBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2021: 17 files on Newbridge2022: 15 files on Newbridge2023: 15 files on Newbridge2024: 16 files on Newbridge2025: 15 files on Newbridge2026: 6 files on Newbridge84 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
Yes
Protected or listed · inside the zone around a recorded monument (KD023-010----)
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential / Infill: To protect and enhance the amenity of established residential communities and promote sustainable intensification.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

kildare county development plan 2023 2029 newbridge settlement plan · 23 Feb 2026 – 23 Mar 2029

Monument zoneOn this site Enclosure, Piercetown
Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Curragh Tintawn Carpets Limited (751 m); Schlötter (Ireland) Designated Activity Company (880 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings39water pump; house
Radon grid squares1
Monuments2Enclosure; R147969
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Sites and Monuments Record, SMR zones of notification, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 83–100% by type. A new house in a garden is harder: 92% approved, and 1 in 2 are asked for more information.

Single-storey rear26 decided · more info asked 27%
96% · council 97%
Two-storey rear12 decided · more info asked 33%
100% · council 93%
Single-storey side15 decided · more info asked 13%
100% · council 99%
Attic or dormer18 decided · more info asked 28%
83% · council 89%
First-floor12 decided · more info asked 25%
100% · council 93%
New house in a garden or site25 decided · more info asked 64%
92% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 108 nearby, 2,843 council-wide

Figure 3

Newbridge, file by file since 2021

21 of 22 decided extensions on the road were approved. New houses in side gardens or on sites: 5 of 6.

84 planning files on Newbridge since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · attic conversion / dormer · refused · 211091No. 1568 · 2021 · two-storey rear · approved · 211671No number · 2021 · attic conversion / dormer · approved · 211763No. 47 · 2021 · single-storey side · approved · 21556No. 811A · 2021 · single-storey side · approved · 21987No. 6 · 2021 · two-storey rear · approved · 21994No number · 2022 · garden room · approved · 221279No number · 2022 · other extension · approved · 22174No. 879 · 2022 · attic conversion / dormer · approved · 22199No. 1576 · 2022 · single-storey side · approved · 22649No number · 2022 · single-storey rear · approved · 22811No. 12 · 2023 · single-storey rear · approved · 23214No number · 2023 · attic conversion / dormer · approved · 23695No. 804 · 2024 · single-storey rear · approved · 2460553No. 1751A · 2024 · garage conversion · approved · 2460581No. 10 · 2024 · single-storey rear · approved · 2460674No. 65 · 2024 · single-storey rear · approved · 2460807No number · 2024 · first-floor · approved · 2461001No. 1669 · 2025 · attic conversion / dormer · approved · 2560895No number · 2025 · rear · approved · 2561407No. 6 · 2025 · attic conversion / dormer · approved · 2561457No. 1595 · 2026 · single-storey rear · approved · 2660504Porches, roofs, otherNo number · 2021 · other work · approved · 211098No number · 2021 · other work · approved · 211185No. 1 · 2021 · other work · refused · 211478No. 3 · 2021 · other work · approved · 21324No number · 2021 · other work · approved · 21415No number · 2021 · other work · approved · 2156No number · 2021 · other work · approved · 21795No. 2C · 2021 · other work · approved · 2181No number · 2022 · other work · refused · 221021No number · 2022 · other work · refused · 221029No number · 2022 · other work · refused · 221131No number · 2022 · other work · refused · 221142No number · 2022 · other work · approved · 221302No number · 2022 · other work · approved · 22234No. 75 · 2022 · other work · approved · 22351No number · 2022 · other work · refused · 22774No number · 2022 · other work · approved · 22802No. 07 · 2022 · other work · approved · 22895No. 10 · 2023 · other work · approved · 231059No number · 2023 · other work · approved · 23198No number · 2023 · other work · approved · 23232No number · 2023 · other work · refused · 23501No number · 2023 · other work · refused · 2360174No. 1582 · 2023 · other work · refused · 2360257No number · 2023 · other work · approved · 2360274No. 1691 · 2023 · other work · approved · 2360408No number · 2023 · other work · refused · 2360447No number · 2023 · other work · approved · 2360473No number · 2023 · other work · approved · 2360531No number · 2023 · other work · approved · 23649No number · 2023 · other work · refused · 23694No number · 2024 · other work · refused · 24380No number · 2024 · other work · approved · 2460151No. 1582 · 2024 · other work · approved · 2460187No number · 2024 · other work · approved · 2460264No number · 2024 · other work · approved · 2460342No. 2B · 2024 · other work · approved · 2460348No number · 2024 · other work · approved · 2460641No number · 2024 · other work · approved · 2460880No. 11 · 2024 · other work · approved · 2460909No. 4 · 2024 · other work · approved · 2461168No number · 2025 · other work · approved · 2560078No number · 2025 · other work · approved · 2560153No. 19 · 2025 · other work · approved · 2560187No number · 2025 · other work · approved · 2560260No number · 2025 · other work · approved · 2560640No. 18 · 2025 · other work · approved · 2560749No number · 2025 · other work · refused · 2560798No. 1732 · 2025 · other work · approved · 2560894No number · 2025 · other work · refused · 2561092No. 1694 · 2025 · other work · refused · 2561166No. 1694 · 2025 · other work · approved · 2561489No number · 2026 · other work · approved · 2660082No. 12 · 2026 · other work · approved · 2660538No number · 2026 · other work · refused · 2660836No number · 2026 · other work · approved · 2660858New house in a side gardenNo. 894 · 2021 · new house · approved · 211056894No number · 2021 · new house · refused · 21106No number · 2021 · new house · approved · 211783No number · 2024 · new house · approved · 2460136No. 16 · 2025 · new house · approved · 255116No number · 2026 · new house · approved · 2660121
ApprovedRefusedWithdrawn or invalid

84 files with "Newbridge" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Dormer or attic11—

On Pierce Park: 8 extensions in 10 years, 89% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days. 1 in 4 is asked for more information, which adds about 72 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 4): 123 days; Appeal window: 4 weeks; Building starts: 102 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 49–54 (n=87)50 daysIf more info asked (1 in 4)With further information: median 123 days (n=30)123 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 102 days after permission (n=39)102 days after permissionSigned off381 days after the start, for the few who file. 67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated117 decided home extensions, 39 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    6 of 16 appealed refusals became permissions. 1 of 6 appealed approvals were reversed.

    Refusals appealed16 decided
    6 became permissions
    Approvals appealed6 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Droighead Nua Urban ED, The Municipal District of Kildare — Newbridge, County Kildare, Leinster, Éire / Ireland with 11 numbered planning items
    ⌖ the houseOpen for commentsBuilding site that stoppedApproved, not startedApprovedNo decision yetRefused
    1. 1Sharks Entertainment Center, Henry Street 2661157No decision yet · 383 m
    2. 21582 Páirc Mhuire, Moorfield 2661079No decision yet · 483 m
    3. 3Piercetown, Newbridge 181491Building site that stopped · 297 m
    4. 4Market Square 221302Approved, no sign building has started · 380 m
    5. 56 College Park, Station Road 2561457Approved with conditions · 105 m
    6. 621 A Great Southern, Newbridge 2660716No decision yet · 222 m
    7. 7Bank of Ireland, Main Street 2660836Refused · 413 m
    8. 8Apartment 1 12 George’s Street, Newbridge 2660538Approved with conditions · 423 m
    9. 914 Eyre Street, Newbridge 2561344No decision yet · 446 m
    10. 10Jame's Lane, Newbridge 2660121Approved with conditions · 471 m
    11. 11O’Rourke’s Bar, Main Street 2561407Approved with conditions · 480 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 52 permissions since 2016, 16 show a start notice and 3 have a completion certificate.

    60 applications lodged within 500 m. Council: 50 approved, 10 refused. After appeals: 52 approved. Of those: 3 signed off, 8 built with the owner's opt-out, 5 started, 32 with no start notice found, 4 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT50: lodged → approved10: lodged → refused50: approved → approved8: refused → refused2 refused by the council, approved after an appeal32: approved → no start notice found8: approved → built, owner opted out5: approved → started, not signed off3: approved → signed off4: approved → ran out60 lodged60 lodged50 approved50 approved10 refused10 refused52 approved52 approved8 refused8 refused32 no start notice found32 no start notice found8 built, owner opted out8 built, owner opted out5 started, not signed off5 started, not signed off3 signed off3 signed off4 ran out4 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured60 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 3 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-03 2661079: application received — RETENTION PERMISSION FOR THE CHANGE OF USE OF AN EXISTING DETACHED GARDEN ROOM, PREVIOUSLY PERMITTED UNDER PLANNING REGI; 2026-11-23 2661157: application received — (a) Change of use of part of entertainment center / snooker hall from internet café and seating area use to electronic gtoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec2661079: application received — RETENTION PERMISSION FOR THE CHANGE OF USE OF AN EXISTING DETACHED GARDEN ROOM, PREVIOUSLY PERMITTED UNDER PLANNING REGI · 483 m away · 2026-11-032661157: application received — (a) Change of use of part of entertainment center / snooker hall from internet café and seating area use to electronic g · 383 m away · 2026-11-23
    Comments close
    • Comments close 3 Nov 20262 days left
      22661079 · application received — RETENTION PERMISSION FOR THE CHANGE OF USE OF AN EXISTING DETACHED GARDEN ROOM, PREVIOUSLY…
      €20 to the council · 483 m away
    • Comments close 23 Nov 202622 days left
      12661157 · application received — (a) Change of use of part of entertainment center / snooker hall from internet café and seating…
      €20 to the council · 383 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    10 homes 380 m away were approved May 2023 with no start notice yet; the permission runs to May 2028. 1 building site nearby stopped before sign-off.

    Piercetown, Newbridge · 12 homes: 12 homes, started Dec 2022, never signed off; Market Square · 10 homes: 10 homes approved May 2023, not started20222023202420252026202720282029Piercetown, Newbridge · 12 homes297 m · 18149112 homes, started Dec 2022, never signed off12 homes, started Dec 2022, never signed offMarket Square · 10 homes380 m · 22130210 homes approved May 2023, not started10 homes approved May 2023, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 2 within 500 m

    Building site that stopped 1

    • 3Piercetown, Newbridge · 12 homes, started Dec 2022, never signed off · 297 m

    Approved, not started 1

    • Market Square · 10 homes approved May 2023, not started · 380 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 11 and 11 a year; busiest 2022. 83% of decisions were approvals.

    2021: 13, 2022: 11, 2023: 11, 2024: 11, 2025: 11, 2026: 3051015202021: 11 approved2021: 2 refused13’21*2022: 9 approved2022: 2 refused11’222023: 7 approved2023: 4 refused11’232024: 11 approved11’242025: 10 approved2025: 1 refused11’252026: 2 approved2026: 1 refused3’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 13 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 1 in the last 12 months
    1 no sign-off needed
    • 1732 Páirc Mhuire, Newbridge, Kildare, W12 DY93 · 16 Dec 2025 · 1 homes · short notice no sign-off needed · 2560894 · 386 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 10 not started
    • 4Market Square · 10 homes · not started · runs out 14 May 2028 · 380 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Pierce Park · 29 applications in 10 years · 89% approved · most common: attic conversion / dormer

    Crèches and schools inspected

    NameLatest inspectionDistance
    Tots Creche & Daycare Nursery Limited · Crèche7 Apr 2026 · report · Tusla Early Years Inspectorate261 m
    Newbridge Family Resource Center · Crèche27 Jan 2025 · report · Tusla Early Years Inspectorate391 m
    Play and Learn Childcare and Education · Crèche4 Feb 2025 · report · Tusla Early Years Inspectorate416 m
    Play and Learn Childcare and Education · Crèche6 Feb 2025 · report · Tusla Early Years Inspectorate416 m
    Tots Creche & Daycare Nursery Ltd · Crèche3 Jul 2024 · report · Tusla Early Years Inspectorate596 m
    Amanda's Play School · Crèche9 Jan 2024 · report · Tusla Early Years Inspectorate639 m
    Tír na Nóg · Crèche16 Apr 2026 · report · Tusla Early Years Inspectorate995 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Kildare County Council.
    Homes approved
    Here56
    Council middle0
    Homes started
    Here177
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    70% of homes built before 1971 (council 16%). 65% owner-occupied (council 71%).

    Homes built before 1971
    70% · council 16%
    Homes built since 2001
    10% · council 40%
    Owner-occupied
    65% · council 71%
    Rented
    18% · council 24%
    Children under 15
    15% · council 22%
    Aged 65 and over
    21% · council 12%
    Households with 2+ cars
    26% · council 51%
    Work mainly from home
    5% · council 12%
    This small area (407 people)Kildare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087034009

    Bus
    102 m
    Piercetown · 892 · busiest stop within 500 m: 6 an hour at peak
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Nearest school
    236 m
    St Conleth's Community College, 752 pupils
    Homes sold nearby
    450
    in 3 years, 67 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Conleth's Community College · postprimary · 752 pupils · 236 m
    • St Patricks NS · primary · 187 pupils · 806 m
    • St Conleths And Marys NS · primary · 345 pupils · 817 m
    • Scoil Chonnla Phadraig · primary · 306 pupils · 833 m
    • Patrician Secondary School · postprimary · 932 pupils · 834 m
    • St Marks Special School · primary · 109 pupils · 845 m
    • S N Connlaodh Naofa N · primary · 285 pupils · 900 m
    • Holy Family Secondary School · postprimary · 789 pupils · 964 m

    Stops 25

    • Piercetown · 892 · 0/hour at peak · 102 m
    • Piercetown · 892 · 1/hour at peak · 110 m
    • Newbridge Stn · 821, 883, 892 · 1/hour at peak · 285 m
    • Newbridge Stn · 821, 883, 892 · 0/hour at peak · 314 m
    • Newbridge · 883 · 370 m
    • Newbridge · Dublin - Cork, Dublin - Galway, Dublin - Limerick, Dublin - Portlaoise, Dublin - Waterford, Dublin - Westport · 6/hour at peak · 454 m
    • Edward Street · 892 · 0/hour at peak · 458 m
    • Newbridge · 120B, 120F, 125, 126, 126A, 126B · 4/hour at peak · 460 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Conleth's Community College · 236 m-0.1% pupils (752)
    • St Patricks NS · 806 m-8.3% pupils (187)
    • St Conleths And Marys NS · 817 m0% pupils (345)
    • Scoil Chonnla Phadraig · 833 m+0.7% pupils (306)
    • Patrician Secondary School · 834 m+1.6% pupils (932)
    • St Marks Special School · 845 m+16% pupils (109)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    2. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    3. Application 383 m away open for comments until 23 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Piercetown
    Electoral division
    Droichead Nua (Newbridge) Urban
    Electoral area
    Newbridge
    Council
    Kildare County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); monument zone; no vacant land tax; high radon area.
    • 2 sites nearby could change: 1 stalled build, 1 approved scheme.
    • 2 applications open for comments nearby; nearest closes 23 Nov 2026.
    • 10 homes approved nearby, not started; largest 10 at Market Square.
    • Newbridge (train Dublin - Cork, Dublin - Galway) 454 m away: 6 an hour at morning peak; 17 from all stops within 500 m.
    • Here (2022 census): 65% owner-occupied (council 71%); 8% of homes empty (council 5%); most built 1919–1945; 46% drive to work (council 61%); population up 1% since 2016.
    • 1 home extension within 250 m since 2025. On Pierce Park: 8 in 10 years, 89% approved.
    • Around here the council decides in a median 62 days (about 9 weeks); 42% are asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 07:45 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.