R445
What closes soonest 0 open windows
No observation, appeal or consultation window is open within 1000 m today.
Where this is
- Local authority
- Kildare County Council
Zoning evaluated against the point
No zoning objective covers this site in the current plan (or the plan is not loaded for this county).
Source: zoning · fetched 12 Sept 2026, 02:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| zoning | CC-BY-4.0 | 12 Sept 2026, 02:04 | open |
Designations and constraints within 1000 m
No OPW CFRAM/NIFM flood extent within 1000 m.
| Designation | Count | Examples |
|---|---|---|
| Radon risk area | 1 | About 1 in 10 homes in this area is likely to have high radon levels |
Residential Zoned Land Tax
This site is not on the current draft or final RZLT map.
Source: rzlt · fetched 12 Sept 2026, 00:23
| Source | Licence | Fetched | Link |
|---|---|---|---|
| rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 | open |
Planning applications 23 in 5 years within 1.0 km
Recent decisions and applications
- Littleconnell Greatconnell and Clownings (IDA Newbridge Business & Technology Park (Littleconnell)) , Newbridge , Co. Kildare Conditionalfor a 10-year permission for the expansion of the brewery facility (permitted under Reg. Ref: 22/1291 and ABP Ref.: 316491 (referred to below as Brewery 1) and described as follows: Brewery 2 Building: (c.9,333m2) Single and two-storey building including brewhouse, storage and handling areas, lab, control room, workshop, plant rooms/areas (internal and external roof-mounted), storage rooms/areas, process areas, utilities and services areas, circulation, office and welfare facilities, and all associated ancillary areas. Building height to a maximum of c.18.4m comprised of ground floor area (c.8,483m2), 1st floor (c.850m2). External Yard adjacent to the Brewery 2 Building: 36 No. new storage vessels/silos/tanks, with associated access platforms, to a maximum height of c.23.3m. Provision of external pipe bridges to a maximum height of c.7.7m. Extension to Brewery 1 - Raw Materials Handling (RMH) Facility to serve Brewery 2: Comprising a 4-storey c.22.3m high extension to Brewery 1. The extension is c. 1,242m2 and includes a raw materials deliveries area (open area with canopy - c.248m2 in extent), 12 no storage vessels plus 3 no. grain silos with truck set down area, pipe bridge connection between the RMH and Brewery 2 (brewhouse) partially covered for pedestrian movement between Brewery 1 and 2. Relocation of approved backlit “Diageo” lettering sign (size 0.9m high 4.275m wide) on existing northern façade to proposed RMH Extension. Tanker filling station expansion (open areas under canopies): 2 no. additional covered tanker bays to be added to permitted Tanker Filling Station (under 22/1291) (c.270m2) with a further 2 no. covered tanker bays to be located adjacently (c.270m2). Roaster Building: 4-storey building (c.3,010m2), to a height of c.19.4m, above part-basement to accommodate plant and equipment associated with the roasting process and including ancillary facilities such as roast handling, barley intake, control room, workshop and associated staff rooms, internal and external plant and 12 No external silos with associated access stairs and platforms. Biogas Filling Station and ancillary external plant compound: c. 1,265m2 of yard area including containerised control room (11m2) to a height of c.3m. Fire Fighting Systems (external compound): comprising back-up generator, fire water tanks, pump equipment. Extension to Permitted Water Utilities Plant: including single storey building containing water treatment and recovery plant (c.359m2) to a height of
- IDA Newbridge Business and Technology Park (Littleconnell) , Littleconnell , Newbridge Conditionalfor removal of existing post and wire fence to the north east and north west of the permitted entrance to the new brewery (c. 50 linear metres each side) and its replacement with a new boundary treatment. The replacement boundary treatment will comprise a c. 2.5m high wall and railings boundary treatment comprising a c. 1m high wall with piers of c. 2.5m height at c. 3m gaps. The wall and piers will be finished with self-coloured render and will be topped with reconstituted stone capping. Proposed between the piers are painted mild steel railings with bow framing. And all associated works. The application relates to a site which comprises an activity requiring an industrial emissions licence
- Newbridge College , Newbridge , Co. Kildare ConditionalThe development will take place on the existing sports playing fields, adjacent to the River Liffey, to the east and opposite side to the existing Newbridge College buildings/campus and will consist of the following: construction of 1no. new synthetic/all-weather floodlit hockey pitch and all associated siteworks (to replace an existing grit surfaced hockey pitch) including new 3m high perimeter fencing to sides of pitch with 3m high perimeter fencing plus 3m high ball stop netting (total 6m overall) to both ends of the hockey pitch plus the provision of 6no. new 18.3m high lighting columns with floodlights around the new pitch plus the provision of dug outs/player shelters, a viewing area with 1.2m high & 0.6m high spectator rail and storage containers to serve the new pitch, • the construction of 1no. new synthetic/all-weather floodlit rugby pitch and all associated siteworks (in place of part of an existing grit surfaced hockey pitch) including new 3m high perimeter fencing to sides of pitch with 3m high perimeter fencing plus 3m high ball stop netting (total 6m overall) to eastern perimeter of pitch, 3m high perimeter fencing plus 12m high ball stop netting (total 15m overall) to western perimeter of pitch adjacent to River Liffey plus the provision of 6no. new 18.3m high lighting columns with floodlights around the new pitch to serve the new rugby pitch and also floodlights on the same lighting columns to light the existing grass pitch adjacent to the new all-weather rugby pitch plus the provision of dug outs/player shelters, a spectator viewing area with tiered steps with 1.2m high & 0.6m high spectator rail at pitch edge and storage containers to serve the new pitch, • the construction of a new path from the end of the existing private bridge over the River Liffey to the pitches to include 8no. new 5m high lighting columns with lighting and all associated siteworks to facilitate access to the new all-weather pitches, • together with all associated development siteworks related to the entire development. Newbridge College is listed on the Record of Protected Structures in the Kildare County Development Plan 2023-2029
- Greenogue , Greatconnell , Newbridge Conditionalfor a one storey extension to the side of the existing one storey detached house, demolish existing garage and all associated site works
- Greenogue , Greatconnell , Newbridge N/afor a one storey extension to the side of the existing one storey detached house, demolish existing garage and all associated site works
- Greatconnell , Newbridge , Co. Kildare Conditionalfor development at a site of c. 3.8 hectares at Greatconnell, Newbridge, Co. Kildare, and includes lands within the ownership of Kildare County Council along the Newbridge South Orbital Relief Road (c. 0.26 ha). The site is principally bounded by: Pfizer campus to the northwest; Keurig Dr Pepper manufacturing facility to the northeast; Newbridge South Orbital Relief Road to the southeast; and greenfield lands in the ownership of the applicant to the southwest. The proposed development primarily comprises the demolition of an existing car park and associated site clearance works and the construction of a distribution warehouse with ancillary office accommodation with a cumulative gross floor area (GFA) of c. 10,801 sqm. The development will consist of: 1 No. warehouse building (c. 10,801 sq m GFA, c. 160 m length, c. 65 m width, and c. 17 m height) inclusive of 1,242 sq m of office space which will include reception areas, conference/meeting rooms, breakout areas, canteens, and overnight truck driver accommodation; Truck yard comprising some 12 No. docking bays, HGV parking bays (13 No. between docks, 6 No. to the rear of the yard, 12 No. trailer-only parking bays to the east of the yard), associated circulation space, wash area, outdoor breakout area with smoking shelter, bin store, and sprinkler tank compound area; 2 No. site access points/roads off Newbridge South Orbital Relief Road to facilitate HGV and LGV access; Some 86 No. car parking spaces, including some 6 No. customer collection spaces, and some 17 No. EV car parking spaces; 44 No. bicycle spaces; Attenuation pond; Electricity substation and switch room along eastern access road (c. 32 sq m); Relocation of existing bus stop c. 100 m west along Newbridge South Orbital Relief Road to facilitate HGV and LGV access; and All ancillary works including drainage, SuDS, signage, cycle lanes, solar PV panels, fire tender access road, fencing, landscaping, lighting, plant and equipment, and all other associated works above and below ground
- Pfizer Ireland PharmaceuticalsOld Great Connell Road , Littleconnell , Newbridge Conditionalfor the installation of a new single storey air handling unit (serving the Specialised Health Care area of the site) to be located on top of Building 3C at the north east corner of the building (facing onto the R445 Newbridge to Naas Road) together with all associated siteworks
- 1 Greatconnell , Newbridge , Co. Kildare Conditionalfor (a) the conversion of the existing detached garage to living accommodation with new single storey link to main dwelling (b) the conversion of the existing attic space to habitable accommodation with the removal of the existing chimney stack to the rear to accommodate new rear dormer and 1no. rooflight to the front of the existing roof. (c) Widening of the existing vehicular access to the front. (d) The development is to include for internal alterations, all associated site works, landscaping and drainage
- within the townlands of Droichead Nua (Newbridge) , and Old Connell Naas Road , Newbridge Conditionaldevelopment on this 3.3 ha site (phase 2 of a 2 phase residential development for some 126 no. dwellings on a wide site area of c.4ha) - A) The construction of 86 no. residential dwellings comprising: 45 no. houses (24 no. 3 bedroom dwellings [2 storey] and 21 no. 4 bedroom houses [3 storey]) and 41 no. apartments/duplex apartments in 2 no. 3 storey buildings (comprising 9 no. 1-bedroom, 6 no. 2-bedroom and 6 no. 3-bedroom units) as well as 1 no. 2 bedroom apartment and 1 no. 3 bedroom duplex apartment in a separate end of terrace (3 storey) arrangement in 10 locations throughout the site (with all apartments/duplex units to include balcony or terrace/private amenity space); B) Vehicular/pedestrian and cyclist access from the Naas Road along with upgrades to the existing vehicular, pedestrian, cyclist and public transport infrastructure along the Naas Road including; the installation of new segregated cycle lanes either side of the Naas Road; a relocated bus stop location at the northern section of the Naas Road and upgraded bus stop at the southern section; a toucan pedestrian crossing across the Naas Road, revised carriageway, and enhanced pedestrian pathways; C) The provision of 120 no. surface resident car parking spaces as well as bicycle storage for apartments; internal road and shared surface networks including pedestrian and cycle paths; D) Provision of c. 0.57 ha of public open space including proposed central square, as well as linear parkways as well as outdoor play areas, and landscaped planting; E) Provision of foul and surface water drainage as well as bin stores; public lighting and all associated landscaping and boundary treatment works, site development and infrastructural works, ESB substations, and all ancillary works necessary to facilitate the development (the proposed development will provide all roads, services [foul & attenuation] and landscaping for the Phase 1 and Phase 2 sites)
- within the townlands of Droichead Nua (Newbridge) , and Old Connell Naas Road , Newbridge Conditionalfor phase 1 of a 2 phase residential development for some 126 no dwellings on a wider site are of c4ha. The phase 1 will consist of A) The construction of 40 no. residential dwellings and a creche comprising: 32 no. houses (26 no. 3 bedroom dwellings [2 storey] and 6 no. 4 bedroom houses [3 storey]) and 8 no. apartments/duplex apartments comprising 1 no. 2 bedroom apartment and 1 no. 3 bedroom duplex apartment in a separate end of terrace (3 storey) arrangement in 4 locations throughout the site (with apartments/duplex units to include balcony or terrace/private amenity space); B) Vehicular/pedestrian and cyclist access from the Naas Road along with upgrades to the existing vehicular, pedestrian, cyclist and public transport infrastructure along the Naas Road including; the installation of new segregated cycle lanes either side of the Naas Road; a relocated bus stop location at the northern section of the Naas Road and upgraded bus stop at the southern section; a toucan pedestrian crossing across the Naas Road, revised carriageway, and enhanced pedestrian pathways; C) The provision of 62 no. surface resident car parking spaces (including visitor and creche) as well as bicycle storage for apartments; internal road and shared surface networks including pedestrian and cycle paths; D) A 2 storey creche of c. 222 sq. m (with associated play area and parking); E) Provision of c. 0.57 ha of public open space including proposed central square, as well as linear parkways as well as outdoor play areas, and landscaped planting; F) Provision of foul and surface water drainage as well as bin stores; public lighting and all associated landscaping and boundary treatment works, site development and infrastructural works, ESB substations, and all ancillary works necessary to facilitate the development (the proposed development will provide all roads, services [foul & attenuation] and landscaping for the Phase 1 and Phase 2 sites) on this 2.84 ha site
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
Source: npad · fetched 13 Sept 2026, 20:39
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 13 Sept 2026, 20:39 | open |
Appeals 0 in 5 years within 1.0 km
No appeal to An Coimisiún Pleanála within 1.0 km in 5 years.
Source: acp · fetched 12 Sept 2026, 00:05
| Source | Licence | Fetched | Link |
|---|---|---|---|
| acp | CC-BY-4.0 | 12 Sept 2026, 00:05 | open |
Commencement notices 0 in 3 years within 1.0 km
No commencement notice lodged with the Building Control Management System nearby.
One notice can cover many buildings — count notices, never building rows, or a single multi-unit scheme reads as a trend (T11).
Source: bcms · fetched 13 Sept 2026, 23:40
| Source | Licence | Fetched | Link |
|---|---|---|---|
| bcms | CC-BY-4.0 | 13 Sept 2026, 23:40 | open |
Sales 2 in 36 months within 1.0 km
€420,000 – €575,000, 15 Mar 2024 to 31 Jul 2025.
| Address | Sold | Price | Asking | Type | Beds | m² | €/m² | BER | Dist. |
|---|---|---|---|---|---|---|---|---|---|
| 30 OLD CONNELL WEIR, NEWBRIDGE, KILDARE | 31 Jul 2025 | €575,000 | €500,000 | Bungalow | 4 | — | — | C3 | 905 m |
| 1 GREAT CONNELL ROAD, DROICHEAD NUA, CO KILDARE | 15 Mar 2024 | €420,000 | — | — | — | — | — | — | 983 m |
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Sources: cara_listings, daft_gateway, ppr · fetched 11 Sept 2026, 20:14
| Source | Licence | Fetched | Link |
|---|---|---|---|
| cara_listings | Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped. | 11 Sept 2026, 20:14 | open |
| daft_gateway | Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data. | 13 Sept 2026, 22:10 | open |
| ppr | PSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.' | 13 Sept 2026, 20:32 | open |
Consultations 0 matched by place
No open council consultation covers this place.
Source: consult · fetched 12 Sept 2026, 02:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| consult | public | 12 Sept 2026, 02:04 | open |
Council items 0 in 24 months
No committee item is geolinked to this place. Council minutes are linked at county or electoral-area level, so this is usually empty for a single house.
Source: moderngov · fetched 13 Sept 2026, 21:50
| Source | Licence | Fetched | Link |
|---|---|---|---|
| moderngov | public | 13 Sept 2026, 21:50 | open |
Capacity and public land
No publishable utility-capacity record within the radius.
No site on the LDA register of relevant public lands within 1.0 km.
Source: lda_lands · fetched 11 Sept 2026, 16:43
| Source | Licence | Fetched | Link |
|---|---|---|---|
| lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 | open |
Schools and public transport within 1.0 km
Schools
None within 1.0 km.
Stops 0 · routes —
Sources used in this report
| Section | Source | Licence | Fetched |
|---|---|---|---|
| Location | places | CC-BY-4.0 | 11 Sept 2026, 21:28 |
| Parcel | parcels | CC-BY-4.0 | 11 Sept 2026, 19:06 |
| Zoning | zoning | CC-BY-4.0 | 12 Sept 2026, 02:04 |
| Constraints | constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 11 Sept 2026, 19:11 |
| Constraints | constraints.radon | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Rzlt | rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 |
| Planning | npad | CC-BY-4.0 | 13 Sept 2026, 20:39 |
| Appeals | acp | CC-BY-4.0 | 12 Sept 2026, 00:05 |
| Commencements | bcms | CC-BY-4.0 | 13 Sept 2026, 23:40 |
| Sales | cara_listings | Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped. | 11 Sept 2026, 20:14 |
| Sales | daft_gateway | Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data. | 13 Sept 2026, 22:10 |
| Sales | ppr | PSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.' | 13 Sept 2026, 20:32 |
| Consultations | consult | public | 12 Sept 2026, 02:04 |
| Council items | moderngov | public | 13 Sept 2026, 21:50 |
| Public land | lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 |
| Projects | social_housing | CC-BY-SA-4.0 | 11 Sept 2026, 20:13 |
| Amenities | gtfs | CC-BY-4.0 | 11 Sept 2026, 19:16 |
| Amenities | schools | CC-BY-4.0 | 11 Sept 2026, 16:41 |
| Deadlines | acp | CC-BY-4.0 | 12 Sept 2026, 00:05 |
| Deadlines | consult | public | 12 Sept 2026, 02:04 |
| Deadlines | moderngov | public | 13 Sept 2026, 21:50 |
| Deadlines | npad | CC-BY-4.0 | 13 Sept 2026, 20:39 |
| Deadlines | rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 |
Generated 14 Sept 2026, 18:47 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.