PlanningRegister.ie
Planning report · Galway County Council · 2000 m around the house · the last 12 months · 21 Oct 2026, 23:27

Dunkellin Street, Loughrea

53.19904, -8.57201

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (92%). 43 homes approved 917 m away haven't started.

See on the mapWatch this area

Not held yet for Galway County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of LoughreaBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2017: 9 files on Loughrea2018: 15 files on Loughrea2019: 7 files on Loughrea2020: 10 files on Loughrea2021: 6 files on Loughrea2022: 6 files on Loughrea2023: 10 files on Loughrea2024: 9 files on Loughrea2025: 16 files on Loughrea2026: 5 files on Loughrea93 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
M2
Zoning · Major town centre
Yes
Protected or listed · inside the zone around a recorded monument (GA105-234----)
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

Town Centre: To provide for the development and improvement of appropriate town centre uses including retail, commercial, office and civic/community uses and to provide for “Living over the Shop” scheme Residential accommodation, or other ancillary residential ac

The main town centre — retail, offices, civic uses, apartments.

loughrea local area plan 2024 2030 · 26 Aug 2024 – 25 Aug 2030

Protected building4 within 100 m M Keane; 2 Bay 3 storey House Large 18th Century House
Heritage inventory3 within 100 m M. Keane; mill race
Monument zoneOn this site Architectural fragment, Loughrea; House - 18th/19th century, Loughrea

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings39Saint Joseph's Convent; The Abbey
Monuments104Castle - unclassified; Bawn
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 174 on the draft 2027 map; 174 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 82–100% by type. A new house in a garden is harder: 69% approved, and 1 in 4 is asked for more information.

Single-storey rear10 decided · more info asked 20%
100% · council 95%
Two-storey rear11 decided · more info asked 18%
82% · council 93%
New house in a garden or site26 decided · more info asked 23%
69% · council 81%
Approved nearbyGalway overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 47 nearby, 5,673 council-wide

Figure 3

Loughrea, file by file since 2017

28 of 29 decided extensions on the road were approved. New houses in side gardens or on sites: 4 of 6.

93 planning files on Loughrea since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2017 · first-floor · approved · 171122No number · 2017 · single-storey side · approved · 171494No number · 2017 · single-storey side · approved · 17508No number · 2017 · single-storey rear · approved · 1785No number · 2017 · single-storey rear · approved · 17988No number · 2018 · rear · approved · 181448No number · 2018 · other extension · approved · 181545No number · 2018 · rear · approved · 18423No. 2 · 2018 · single-storey rear · approved · 18738No number · 2018 · other extension · approved · 18774No number · 2019 · garage conversion · approved · 19712No number · 2020 · two-storey rear · approved · 20967No number · 2021 · other extension · approved · 21645No number · 2022 · rear · approved · 2260376No number · 2022 · single-storey rear · approved · 2261057No number · 2023 · rear · approved · 2360797No number · 2024 · two-storey rear · refused · 2460328No number · 2024 · first-floor · approved · 2460720No number · 2024 · two-storey rear · approved · 2460756No. 9 · 2024 · other extension · approved · 2460868No number · 2024 · two-storey rear · approved · 2461243No number · 2024 · porch / front · approved · 2461400No number · 2025 · first-floor · approved · 2560347No number · 2025 · rear · approved · 2560783No number · 2025 · two-storey rear · approved · 2560982No number · 2025 · two-storey rear · approved · 2560983No number · 2025 · side · approved · 2561693No number · 2025 · two-storey rear · approved · 2561869No number · 2026 · single-storey rear · approved · 2660335Porches, roofs, otherNo number · 2017 · other work · approved · 17197No number · 2017 · other work · approved · 17230No number · 2017 · other work · refused · 17641No number · 2017 · other work · approved · 17796No number · 2018 · other work · approved · 181602No number · 2018 · other work · approved · 181635No number · 2018 · other work · approved · 181809No number · 2018 · other work · refused · 18230No number · 2018 · other work · approved · 18281No number · 2018 · other work · approved · 18475No number · 2018 · other work · approved · 18478No number · 2018 · other work · refused · 18518No number · 2018 · other work · approved · 18775No number · 2019 · other work · refused · 191479No number · 2019 · other work · approved · 191864No number · 2019 · other work · approved · 191919No number · 2019 · other work · refused · 19553No number · 2019 · other work · approved · 19668No number · 2019 · other work · approved · 19727No number · 2020 · other work · approved · 201021No number · 2020 · other work · approved · 201409No number · 2020 · other work · refused · 201531No number · 2020 · other work · refused · 201745No number · 2020 · other work · approved · 201851No number · 2020 · other work · approved · 20311No number · 2020 · other work · approved · 20363No number · 2020 · other work · approved · 2037No number · 2021 · other work · refused · 211374No number · 2021 · other work · approved · 211978No number · 2021 · other work · refused · 212148No number · 2021 · other work · approved · 21857No number · 2022 · other work · approved · 2260124No number · 2022 · other work · approved · 2260531No number · 2022 · other work · approved · 2261007No number · 2022 · other work · approved · 2261050No number · 2023 · other work · approved · 2360265No number · 2023 · other work · approved · 2360346No number · 2023 · other work · approved · 2360423No number · 2023 · other work · approved · 2360465No number · 2023 · other work · approved · 2360688No number · 2023 · other work · approved · 2360841No number · 2023 · other work · approved · 2361310No number · 2023 · other work · approved · 2361311No. 9 · 2024 · other work · approved · 24221No number · 2024 · other work · approved · 2460551No number · 2024 · other work · approved · 2461605No number · 2025 · other work · refused · 2560612No number · 2025 · other work · approved · 2560720No number · 2025 · other work · approved · 2560781No number · 2025 · other work · approved · 2561139No number · 2025 · other work · approved · 2561366No number · 2025 · other work · approved · 2561529No number · 2025 · other work · approved · 2561599No number · 2025 · other work · approved · 2561846No number · 2026 · other work · approved · 2661113No number · 2026 · other work · refused · 2661132No number · 2026 · other work · refused · 2661214No number · 2026 · other work · approved · 2661328New house in a side gardenNo number · 2018 · new house · approved · 18904No number · 2020 · new house · approved · 20174No number · 2021 · new house · refused · 212515No number · 2023 · new house · refused · 2361565No number · 2025 · new house · approved · 2560115No number · 2025 · new house · approved · 2560244
ApprovedRefusedWithdrawn or invalid

93 files with "Loughrea" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Two-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days. 1 in 7 is asked for more information, which adds about 124 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 54 days; If more info asked (1 in 7): 174 days; Appeal window: 4 weeks; Building starts: 180 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 52–55 (n=68)54 daysIf more info asked (1 in 7)With further information: median 174 days (n=11)174 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 180 days after permission (n=28)180 days after permissionSigned off46% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated79 decided home extensions, 28 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    5 of 13 appealed refusals became permissions. 1 of 15 appealed approvals were reversed.

    Refusals appealed13 decided
    5 became permissions
    Approvals appealed15 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 6 in the last 12 months
    • 500239 Granted · Caheronaun & Caherwalter , Loughrea , County Galway · 1.3 km
    • 324484 Pending · Baunoge , Loughrea , Co. Galway · 1.1 km
    • 500747 Refused · Gorteenapheebera , Fortlands Meadows , Loughrea · 1.5 km
    • 500716 Refused · Cosmona , Athenry Road , Loughrea · 720 m
    • 500442 Granted · Cosmona , Loughrea Shopping Centre , Athenry Road · 696 m
    • 500451 Refused · Cosmona , Loughrea Shopping Centre , Athenry Road · 696 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher21 Oct 2026, 01:40open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 4

    What's changing around you?

    Street map around Dunkellin Street, Loughrea with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedEmpty land zoned for homesApprovedNo decision yet
    1. 1Loughrea, Pigott's Street 2661690No decision yet · 391 m
    2. 2Loughrea, Bride Street 2661564No decision yet · 562 m
    3. 3Caherwalter, Dublin Road & Droim na Cille 2661692No decision yet · 1.1 km
    4. 4Caheronaun, Loughrea 2660187Approved with conditions · 821 m
    5. 5Cosmona, The Loughrea Service Station Athenry Road 2661421Approved with conditions · 854 m
    6. 6Caheronaun 2560297Approved, no sign building has started · 1.4 km
    7. 70.3 ha zoned for homesEmpty land zoned for homes · 83 m
    8. 81.5 ha zoned for homesEmpty land zoned for homes · 95 m
    9. 90.8 ha zoned for homesEmpty land zoned for homes · 206 m
    10. 106.0 ha zoned for homesEmpty land zoned for homes · 209 m
    11. 110.1 ha zoned for homesEmpty land zoned for homes · 212 m
    12. 120.5 ha zoned for homesEmpty land zoned for homes · 268 m
    13. 13Loughrea, Dunkellin Street 2561599Approved with conditions · 55 m
    14. 14Loughrea, Fairgreen Td. 2661113Approved with conditions · 67 m
    15. 15Loughrea, O'Kelly House Castle St 2661539No decision yet · 70 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 74 permissions since 2016, 24 show a start notice and 4 have a completion certificate.

    86 applications lodged within 500 m. Council: 74 approved, 12 refused. After appeals: 74 approved. Of those: 4 signed off, 7 built with the owner's opt-out, 13 started, 27 with no start notice found, 23 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT74: lodged → approved12: lodged → refused73: approved → approved11: refused → refused1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal27: approved → no start notice found7: approved → built, owner opted out13: approved → started, not signed off4: approved → signed off23: approved → ran out86 lodged86 lodged74 approved74 approved12 refused12 refused74 approved74 approved11 refused11 refused1 withdrawn1 withdrawn27 no start notice found27 no start notice found7 built, owner opted out7 built, owner opted out13 started, not signed off13 started, not signed off4 signed off4 signed off23 ran out23 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured86 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    5 deadlines within 2.0 km; the first closes 21 Oct 2026.

    5 deadlines in the next 30 days: 2026-10-21 2661564: application received — for restoration of an existing terraced dwelling, construction of a 2-storey extension to the rear of the existing dwell; 2026-11-06 2660187: CONDITIONAL — is sought for a residential development to comprise of (a) 43 new residential units comprising of 20 no. 4 bed semi-deta; 2026-11-09 2661421: CONDITIONAL — of advertising signage, flagpoles & all associated structures; 2026-11-13 2661692: application received — for the construction of a 20 unit residential development comprising 14 No. 3 bed semi-detached/terraced two storey dwel; 2026-11-13 2661690: application received — for the demolition of 3 No. existing domestic garages/stores and the construction of a new 1 No. two-storey serviced dwetoday26 Oct31 Oct5 Nov10 Nov15 Nov20 Nov2661564: application received — for restoration of an existing terraced dwelling, construction of a 2-storey extension to the rear of the existing dwell · 562 m away · 2026-10-212660187: CONDITIONAL — is sought for a residential development to comprise of (a) 43 new residential units comprising of 20 no. 4 bed semi-deta · 821 m away · 2026-11-062661421: CONDITIONAL — of advertising signage, flagpoles & all associated structures · 854 m away · 2026-11-092661692: application received — for the construction of a 20 unit residential development comprising 14 No. 3 bed semi-detached/terraced two storey dwel · 1.1 km away · 2026-11-132661690: application received — for the demolition of 3 No. existing domestic garages/stores and the construction of a new 1 No. two-storey serviced dwe · 391 m away · 2026-11-13
    Comments closeTime to appeal ends
    • Comments close 21 Oct 2026closes today
      22661564 · application received — for restoration of an existing terraced dwelling, construction of a 2-storey extension to the…
      €20 to the council · 562 m away
    • Time to appeal ends 6 Nov 202616 days left
      42660187 · CONDITIONAL — is sought for a residential development to comprise of (a) 43 new residential units comprising of 20 no.…
      €220 to An Coimisiún Pleanála (€110 observer) · 821 m away
    • Time to appeal ends 9 Nov 202619 days left
      52661421 · CONDITIONAL — of advertising signage, flagpoles & all associated structures
      €220 to An Coimisiún Pleanála (€110 observer) · 854 m away
    • Comments close 13 Nov 202623 days left
      32661692 · application received — for the construction of a 20 unit residential development comprising 14 No. 3 bed…
      €20 to the council · 1.1 km away
    • Comments close 13 Nov 202623 days left
      12661690 · application received — for the demolition of 3 No. existing domestic garages/stores and the construction of a new 1 No.…
      €20 to the council · 391 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    43 homes 917 m away were approved Oct 2026 with no start notice yet; the permission runs to Oct 2031.

    Caheronaun · 43 homes: 43 homes approved Oct 2026, not started; Caheronaun · 16 homes: 16 homes approved Jun 2025, not started202420252026202720282029203020312032Caheronaun · 43 homes917 m · 266018743 homes approved Oct 2026, not started43 homes approved Oct 2026, not startedCaheronaun · 16 homes1.4 km · 256029716 homes approved Jun 2025, not started16 homes approved Jun 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 12 within 2.0 km

    Approved, not started 2

    • Caheronaun · 43 homes approved Oct 2026, not started · 917 m
    • Caheronaun · 16 homes approved Jun 2025, not started · 1.4 km

    Empty land zoned for homes 10

    • 70.3 ha zoned for homes · no homes built on it yet · 83 m
    • 81.5 ha zoned for homes · no homes built on it yet · 95 m
    • 90.8 ha zoned for homes · no homes built on it yet · 206 m
    • 106.0 ha zoned for homes · no homes built on it yet · 209 m
    • 110.1 ha zoned for homes · no homes built on it yet · 212 m
    • 120.5 ha zoned for homes · no homes built on it yet · 268 m
    • 0.5 ha zoned for homes · no homes built on it yet · 281 m
    • 1.2 ha zoned for homes · no homes built on it yet · 285 m
    • 3.7 ha zoned for homes · no homes built on it yet · 302 m
    • 0.7 ha zoned for homes · no homes built on it yet · 344 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 9

    Applications within 500 m, by year

    Between 6 and 13 a year; busiest 2018. 86% of decisions were approvals.

    2017: 7, 2018: 13, 2019: 9, 2020: 10, 2021: 10, 2022: 8, 2023: 6, 2024: 7, 2025: 12, 2026: 4051015202017: 6 approved2017: 1 refused7’17*2018: 11 approved2018: 2 refused13’182019: 7 approved2019: 2 refused9’192020: 8 approved2020: 2 refused10’202021: 7 approved2021: 3 refused10’212022: 8 approved8’222023: 6 approved6’232024: 6 approved2024: 1 refused7’242025: 12 approved12’252026: 3 approved2026: 1 refused4’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 41 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Building work nearby 11 in the last 12 months
    1 signed off as finished6 not signed off4 no sign-off needed
    • Caheronaun, Loughrea, Galway · 7 Oct 2026 · 1 homes · short notice no sign-off needed · PL-500239-GY-25 & 25/61163 · 902 m
    • Athenry Rd Loughrea, Baile Locha Riach, Galway · 4 Sept 2026 · start notice not signed off · LA06-24 · 1.1 km
    • An Cheapach Liath, Loughrea,, Galway · 20 Jul 2026 · 1 homes · start notice not signed off · 26/60173 · 895 m
    • Cross Street, Loughrea, Galway · 15 Jul 2026 · 7-day notice not signed off · 25/60781 · 639 m
    • Caherlavine, Cottage Hill Commercial Park, Galway · 3 Jul 2026 · 1 homes · start notice not signed off · 24/61063 · 1.9 km
    • Cosmona, Loughrea, Galway · 2 Jul 2026 · short notice no sign-off needed · 2660231 · 1.0 km
    • Bohercom, Loughrea, Galway · 27 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2461741 · 685 m
    • Cross Street, Loughrea, Galway · 31 Mar 2026 · 7-day notice signed off · 25/60781 · 639 m
    • Athenry Road, Loughrea, Galway · 16 Mar 2026 · 1 homes · start notice not signed off · 25/61366 · 681 m
    • Cosmona Loughrea, Loughrea, Galway · 31 Dec 2025 · 56 homes · start notice not signed off · LA08-24 · 540 m
    • Ardán Liam Maoilíosa, Loughrea, Galway, h62A590 · 26 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 2461400 · 284 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 21 Oct 2026, 01:58
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Homes coming 59 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Loughrea Community Preschool · Crèche7 Feb 2024 · report · Tusla Early Years Inspectorate228 m
    Kilcooley Preschool · Crèche17 Jun 2026 · report · Tusla Early Years Inspectorateapprox. 360 m
    Kilnadeema Montessori & Afterschool · Crèche19 Nov 2025 · report · Tusla Early Years Inspectorateapprox. 360 m
    Little All Stars · Crèche15 Mar 2024 · report · Tusla Early Years Inspectorateapprox. 360 m
    St. Therese Montessori Preschool · Crèche4 Sept 2024 · report · Tusla Early Years Inspectorateapprox. 360 m
    Mulberry Childcare Limited · Crèche28 Apr 2025 · report · Tusla Early Years Inspectorateapprox. 360 m
    New Adventures Pre- school · Crèche13 Jun 2025 · report · Tusla Early Years Inspectorateapprox. 360 m
    Riverview Montessori · Crèche11 Oct 2024 · report · Tusla Early Years Inspectorate469 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Galway County Council.
    Homes approved
    Here76
    Council middle0
    Homes started
    Here129
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    45% of homes built before 1971 (council 23%). 32% owner-occupied (council 75%).

    Homes built before 1971
    45% · council 23%
    Homes built since 2001
    23% · council 39%
    Owner-occupied
    32% · council 75%
    Rented
    49% · council 18%
    Children under 15
    12% · council 21%
    Aged 65 and over
    25% · council 17%
    Households with 2+ cars
    18% · council 52%
    Work mainly from home
    8% · council 11%
    This small area (233 people)Galway

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 067170016

    Bus
    232 m
    Barrack Street · 934 · busiest stop within 500 m: 2 an hour at peak
    Nearest school
    539 m
    S N Ide Naofa, 328 pupils
    Schools, stops and the council

    Schools

    • S N Ide Naofa · primary · 328 pupils · 539 m
    • St Raphaels College · postprimary · 749 pupils · 640 m
    • St Brendans NS · primary · 216 pupils · 864 m
    • St Brigids College · postprimary · 751 pupils · 924 m
    • Gaelscoil Riabhach · primary · 170 pupils · 1.1 km

    Stops 12

    • Barrack Street · 934 · 0/hour at peak · 232 m
    • Loughrea · 439, 548, 763, 844, 920 · 1/hour at peak · 244 m
    • Ashlawn · 920 · 1/hour at peak · 251 m
    • Ashlawn · 920 · 0/hour at peak · 254 m
    • Loughrea · 548, 763, 844, 920, 934 · 2/hour at peak · 337 m
    • Cosmona · 548 · 0/hour at peak · 771 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Ide Naofa · 539 m+7.9% pupils (328)
    • St Raphaels College · 640 m+1.1% pupils (749)
    • St Brendans NS · 864 m-4.4% pupils (216)
    • St Brigids College · 924 m-0.4% pupils (751)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 21 Oct 2026, 02:35
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Council consultation portalsPublic21 Oct 2026, 01:42open
    Council meetings (ModernGov)Public21 Oct 2026, 02:35open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    2. Application 391 m away open for comments until 13 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Loughrea
    Electoral division
    Loughrea Urban
    Electoral area
    Loughrea
    Council
    Galway County Council
    Everything we found, as a list 8 lines
    • Zoned M2 (major town centre); monument zone; no vacant land tax.
    • 12 sites nearby could change: 2 approved schemes, 10 empty zoned plots.
    • 3 applications open for comments nearby; nearest closes 13 Nov 2026.
    • 59 homes approved nearby, not started; largest 43 at Caheronaun.
    • Loughrea (bus 548, 763) 337 m away: 2 an hour at morning peak; 5 from all stops within 500 m.
    • Here (2022 census): 49% rent (council 18%); 19% of homes empty (council 16%); most built 2001–2010; 49% drive to work (council 66%); population up 14% since 2016.
    • 1 home extension within 250 m since 2025.
    • Around here the council decides in a median 54 days (about 8 weeks); 1 in 8 is asked for more information.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.021 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public21 Oct 2026
    www2.courts.ie—© the publisher21 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public21 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.021 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence21 Oct 2026
    services1.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 21 Oct 2026, 23:27 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.