Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (90%). 341 homes approved 372 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 10
Radon (EPA) · homes with high radon
A
Flood zone (development plan) · Zone A: highest risk
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities of existing residential areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

bray municipal district local area plan 2018 · 10 Jun 2018 – 23 Oct 2028

Monument zone2 within 100 m Cross-slab, Bray; Castle - tower house, Little Bray
Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Bray Chemicals Ltd. (254 m); Nypro Limited (482 m); Bray (698 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites2Bray Chemicals Ltd.; Nypro Limited
Heritage inventory buildings25Bray Courthouse; Ledwidge Brothers
Radon grid squares3
Monuments10Ritual site - holy well; R149151
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 6 on the draft 2027 map; 6 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Sites and Monuments Record, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), EPA licensed sites, OPW flood maps (NIFM), National Inventory of Architectural Heritage · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 75–100% by type. A new house in a garden is harder: 69% approved, and 1 in 3 is asked for more information.

Single-storey rear36 decided · more info asked 22%
97% · council 95%
Two-storey rear16 decided · more info asked 12%
75% · council 90%
Attic or dormer41 decided · more info asked 27%
85% · council 92%
First-floor19 decided · more info asked 26%
100% · council 92%
Porch or front13 decided · more info asked 23%
92% · council 93%
New house in a garden or site16 decided · more info asked 38%
69% · council 82%
Approved nearbyWicklow overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 141 nearby, 2,002 council-wide

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 approved
KindAppliedApprovedRefused
First-floor11—
Other11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 49 days. 1 in 4 is asked for more information, which adds about 49 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; If more info asked (1 in 4): 97 days; Appeal window: 4 weeks; Building starts: 143 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 46–53 (n=135)49 daysIf more info asked (1 in 4)With further information: median 97 days (n=43)97 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 143 days after permission (n=54)143 days after permissionSigned off54% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated178 decided home extensions, 54 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    7 of 19 appealed refusals became permissions. 3 of 25 appealed approvals were reversed.

    Refusals appealed19 decided
    7 became permissions
    Approvals appealed25 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 501974 Pending · Site of c. 0.3 ha at Riverside Works , Bray , Co. Wicklow · 264 m
    • 500684 Granted with conditions · Dunville, Upper Dargle Road, Bray, Co. Wicklow · 350 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher27 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 4

    What's changing around you?

    Street map around Saint Patrick's Square with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedEmpty land zoned for homesApproved
    1. 12 Hawthorn Road, Bray 2660934No decision yet · 327 m
    2. 2Abhaile, 19 Herbert Road 26211No decision yet · 415 m
    3. 3Bray Motors, Corke abbey avenue D26A/0725/WEBNo decision yet · 443 m
    4. 4No. 2 Westbourne Terrace, Quinsborough Road 2660748Refused · 405 m
    5. 51 Quinsborough Road, Bray 2660757Approved with conditions · 405 m
    6. 6Everest Centre site 2460793Approved, no sign building has started · 73 m
    7. 7Former Bray Golf Course Lands 2560207Approved, no sign building has started · 372 m
    8. 81.5 ha zoned for homesEmpty land zoned for homes · 44 m
    9. 90.3 ha zoned for homesEmpty land zoned for homes · 263 m
    10. 100.5 ha zoned for homesEmpty land zoned for homes · 286 m
    11. 110.1 ha zoned for homesEmpty land zoned for homes · 497 m
    12. 12Unit 1 (Rear of 1 Fairview Terrace), Bray 2660670Approved with conditions · 46 m
    13. 1310 Upper Dargle Road, Bray 25333Approved with conditions · 194 m
    14. 1411 Upper Dargle Road, Bray 2660229Approved with conditions · 199 m
    15. 15Lidl, Industrial Yarns Complex D26A/0006/WEBApproved · 223 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 129 permissions since 2016, 21 show a start notice and 3 have a completion certificate.

    155 applications lodged within 500 m. Council: 130 approved, 21 refused. After appeals: 129 approved. Of those: 3 signed off, 7 built with the owner's opt-out, 11 started, 103 with no start notice found, 5 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT130: lodged → approved21: lodged → refused3: lodged → withdrawn or invalid1: lodged → undecided128: approved → approved20: refused → refused3: withdrawn or invalid → withdrawn1: undecided → undecided2 approved by the council, refused after an appeal1 refused by the council, approved after an appeal103: approved → no start notice found7: approved → built, owner opted out11: approved → started, not signed off3: approved → signed off5: approved → ran out155 lodged155 lodged130 approved130 approved21 refused21 refused3 withdrawn or invalid3 withdrawn or invalid1 undecided1 undecided129 approved129 approved22 refused22 refused3 withdrawn3 withdrawn1 undecided1 undecided103 no start notice found103 no start notice found7 built, owner opted out7 built, owner opted out11 started, not signed off11 started, not signed off3 signed off3 signed off5 ran out5 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured155 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    6 deadlines within 500 m; the first closes 29 Oct 2026.

    6 deadlines in the next 30 days: 2026-10-29 2660748: REFUSED — (1) Removal of existing rear garden storage building along the east boundary; (2) Converting the existing first and seco; 2026-11-02 D26A/0725/WEB: application received — The development will consist of retention permission for an attic conversion wi; 2026-11-10 2660757: CONDITIONAL — the change of use from retail to a residential use at first floor and part ground floor, the residential unit will compr; 2026-11-19 26211: application received — alterations to front paved area and widening of existing entrance to provide additional off street parking; 2026-11-23 2660934: application received — the conversion of the existing attic space, complete with new dormer structure & windows to the rear, removal of the exi; 2026-11-25 ACP 500165: Grant permissiontoday2 Nov7 Nov12 Nov17 Nov22 Nov27 Nov2660748: REFUSED — (1) Removal of existing rear garden storage building along the east boundary; (2) Converting the existing first and seco · 405 m away · 2026-10-29D26A/0725/WEB: application received — The development will consist of retention permission for an attic conversion wi · 443 m away · 2026-11-022660757: CONDITIONAL — the change of use from retail to a residential use at first floor and part ground floor, the residential unit will compr · 405 m away · 2026-11-1026211: application received — alterations to front paved area and widening of existing entrance to provide additional off street parking · 415 m away · 2026-11-192660934: application received — the conversion of the existing attic space, complete with new dormer structure & windows to the rear, removal of the exi · 327 m away · 2026-11-23ACP 500165: Grant permission · 53 m away · 2026-11-25
    Comments closeTime to appeal endsHigh Court window ends
    • Time to appeal ends 29 Oct 20261 day left
      42660748 · REFUSED — (1) Removal of existing rear garden storage building along the east boundary; (2) Converting the existing…
      €220 to An Coimisiún Pleanála (€110 observer) · 405 m away
    • Comments close 2 Nov 20265 days left
      3D26A/0725/WEB · application received — The development will consist of retention permission for an attic conversion wi
      €20 to the council · 443 m away
    • Time to appeal ends 10 Nov 202613 days left
      52660757 · CONDITIONAL — the change of use from retail to a residential use at first floor and part ground floor, the residential…
      €220 to An Coimisiún Pleanála (€110 observer) · 405 m away
    • Comments close 19 Nov 202622 days left
      226211 · application received — alterations to front paved area and widening of existing entrance to provide additional off…
      €20 to the council · 415 m away
    • Comments close 23 Nov 202626 days left
      12660934 · application received — the conversion of the existing attic space, complete with new dormer structure & windows to the…
      €20 to the council · 327 m away
    • Time to ask the High Court for a review ends 25 Nov 202628 days left
      Grant permission
      53 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    341 homes 372 m away were approved Sept 2025 with no start notice yet; the permission runs to Sept 2031. BusConnects Core Bus Corridors is planned 134 m away.

    Former Bray Golf Course… · 341 homes: 341 homes approved Sep 2025, not started; Everest Centre site · 29 homes: 29 homes approved Mar 2025, not started; BusConnects Core Bus…: core bus corridor (DLR County Development Plan 2022-2028); Luas Green Line extension…: proposed (DLR County Development Plan 2022-2028)202420252026202720282029203020312032Former Bray Golf Course… · 341 homes372 m · 2560207341 homes approved Sep 2025, not started341 homes approved Sep 2025, not startedEverest Centre site · 29 homes73 m · 246079329 homes approved Mar 2025, not started29 homes approved Mar 2025, not startedBusConnects Core Bus…134 m · plannedcore bus corridor (DLR County Development Plan 2022-2028)Luas Green Line extension…148 m · plannedproposed (DLR County Development Plan 2022-2028)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 6 within 500 m

    Approved, not started 2

    Empty land zoned for homes 4

    • 81.5 ha zoned for homes · no homes built on it yet · 44 m
    • 90.3 ha zoned for homes · no homes built on it yet · 263 m
    • 100.5 ha zoned for homes · no homes built on it yet · 286 m
    • 110.1 ha zoned for homes · no homes built on it yet · 497 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 22 and 29 a year; busiest 2025. 86% of decisions were approvals.

    2021: 34, 2022: 22, 2023: 25, 2024: 26, 2025: 29, 2026: 190102030402021: 29 approved2021: 4 refused2021: 1 withdrawn or invalid34’21*2022: 18 approved2022: 4 refused22’222023: 22 approved2023: 3 refused25’232024: 19 approved2024: 6 refused2024: 1 withdrawn or invalid26’242025: 25 approved2025: 3 refused2025: 1 withdrawn or invalid29’252026: 17 approved2026: 1 refused2026: 1 undecided19’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 39 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    Building work nearby 10 in the last 12 months
    5 not signed off5 no sign-off needed
    • 4 Quinsborough Road, Bray, Wicklow, A98 XH63 · 12 Oct 2026 · 1 homes · 7-day notice not signed off · 2660195 · 442 m
    • Castle Street, Bray, Wicklow, A98K290 · 13 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2655 · 265 m
    • Main Street Central, Bray, Wicklow, A98 H9X5 · 4 Aug 2026 · 7-day notice not signed off · 454 m
    • 1A Raverty Villas, Bray, Wicklow, A98 R970 · 6 Jul 2026 · 1 homes · short notice no sign-off needed · 25/60951 · 356 m
    • Mill Lane, Bray, Wicklow · 11 Feb 2026 · 1 homes · 7-day notice not signed off · PL REF. 23238 & APPEAL REF. 2560433 · 307 m
    • 52 James Connolly Square, Bray, Wicklow, A98 DT93 · 3 Feb 2026 · 1 homes · short notice no sign-off needed · 25/60454 · 480 m
    • 66F-66J Upper Dargle Road & Green Park Road, Bray, Wicklow, n/a · 21 Dec 2025 · 4 homes · 7-day notice not signed off · 363 m
    • 4 Saint Peters Road, Bray, Wicklow, A98 TN12 · 15 Dec 2025 · 1 homes · short notice no sign-off needed · 25/60093 · 361 m
    • Herbert Road, Bray, Wicklow, A98 V8X7 · 1 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 25/60298 · 371 m
    • 27 Dublin Road, Bray, Wicklow, A98 NP49 · 20 Nov 2025 · 3 homes · 7-day notice not signed off · 276 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 28 Oct 2026, 02:21
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    Homes coming 370 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    c. 9.37 hectare site at the former Bray Golf Club Lands off——70 m
    Bray Golf Club Lands——148 m
    Old Connaught Avenue——655 m
    Former Bray Golf Club Lands159—678 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Hollyoaks Montessori Pre- school · Crèche6 Oct 2025 · report · Tusla Early Years Inspectorate259 m
    LMNO Childcare Ltd · Crèche11 Apr 2025 · report · Tusla Early Years Inspectorate518 m
    Little Bunnies Montessori · Crèche20 Nov 2025 · report · Tusla Early Years Inspectorate520 m
    Little Rascals Creche · Crèche26 Aug 2025 · report · Tusla Early Years Inspectorate650 m
    Little Bunnies Montessori · Crèche8 Oct 2025 · report · Tusla Early Years Inspectorate700 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Wicklow County Council.
    Homes approved
    Here1,115
    Council middle0
    Homes started
    Here215
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    50% of homes built before 1971 (council 26%). 34% owner-occupied (council 71%).

    Homes built before 1971
    50% · council 26%
    Homes built since 2001
    35% · council 32%
    Owner-occupied
    34% · council 71%
    Rented
    62% · council 24%
    Children under 15
    15% · council 21%
    Aged 65 and over
    11% · council 15%
    Households with 2+ cars
    14% · council 48%
    Work mainly from home
    12% · council 14%
    This small area (272 people)Wicklow

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 257080007

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    56 m
    Castle Street · 45A, 45B, 84n · busiest stop within 500 m: 16 an hour at peak
    Planned
    134 m
    BusConnects Core Bus Corridors, City to Bray
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    197 m
    North Wicklow Educate Together Secondary School, 324 pupils
    Homes sold nearby
    70
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • North Wicklow Educate Together Secondary School · postprimary · 324 pupils · 197 m
    • St. Peter's Primary School · primary · 156 pupils · 261 m
    • Ravenswell Primary School · primary · 468 pupils · 361 m
    • Coláiste Raithín · postprimary · 326 pupils · 509 m
    • Scoil Padraig Naofa · primary · 680 pupils · 829 m
    • Gaelscoil Ui Cheadaigh · primary · 166 pupils · 877 m
    • Cronan Naofa NS · primary · 388 pupils · 946 m
    • Marino School N.S. · primary · 47 pupils · 984 m

    Stops 39

    • Castle Street · 45A, 45B, 84n, E1, L14, L15 · 12/hour at peak · 56 m
    • Upper Dargle Road · L15 · 1/hour at peak · 67 m
    • Sunnybank Court · L15 · 1/hour at peak · 75 m
    • St Cronan's Road · 45A, 45B, E1, L14, L15 · 15/hour at peak · 91 m
    • Dwyer Park · 45A, 45B, 84n, E1, L14, L15 · 12/hour at peak · 146 m
    • Roseville Court · 45A, 45B, E1, L14 · 14/hour at peak · 187 m
    • St Peter's Church · E1, L14 · 8/hour at peak · 304 m
    • Cornerstone Church · 45A, 45B, E1, L14, L15 · 16/hour at peak · 349 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • North Wicklow Educate Together Secondary School · 197 m-0.3% pupils (324)
    • St. Peter's Primary School · 261 m+0.6% pupils (156)
    • Ravenswell Primary School · 361 m+1.3% pupils (468)
    • Coláiste Raithín · 509 m-4.7% pupils (326)
    • Scoil Padraig Naofa · 829 m-4.9% pupils (680) · temporary classrooms 2026, approved with conditions
    • Gaelscoil Ui Cheadaigh · 877 m-11.7% pupils (166) · temporary classrooms 2026, approved with conditions

    Public land

    • Wicklow County Council · 0.46 ha · 346 m
    • Wicklow County Council · 0.12 ha · 351 m
    • An Post · 0.15 ha · 414 m
    • Wicklow County Council · 0.4 ha · 423 m
    • Bray Town Council · 0.38 ha · 464 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Council consultation portalsPublic28 Oct 2026, 00:59open
    Council meetings (ModernGov)Public28 Oct 2026, 02:10open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Inside Flood Zone A on the council's development plan map: can you insure it?
      Ask for: A home insurance quote before you bid, and any flood risk assessment in the site's planning file.
      Insurer
    2. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    3. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    4. 29 homes approved 73 m away (Everest Centre site), not started: what is planned?
      Ask for: The planning file for 2460793.
      Council
    5. Application 327 m away open for comments until 23 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Little Bray
    Electoral division
    Bray No. 1
    Electoral area
    Bray East
    Council
    Wicklow County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m; high radon area.
    • Inside Flood Zone A on the Wicklow County Development Plan 2022-2028 flood map.
    • 6 sites nearby could change: 2 approved schemes, 4 empty zoned plots.
    • 3 applications open for comments nearby; nearest closes 23 Nov 2026.
    • 370 homes approved nearby, not started; largest 341 at Former Bray Golf Course Lands.
    • Florence Road (bus 45A, 45B) 485 m away: 16 an hour at morning peak; 126 from all stops within 500 m. Planned: BusConnects Core Bus Corridors 134 m away, core bus corridor (DLR County Development Plan 2022-2028).
    • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 62% rent (council 24%); 9% of homes empty (council 7%); most built 2001–2010; 35% drive to work (council 58%); population up 2% since 2016.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 33
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.028 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public28 Oct 2026
    www2.courts.ie—© the publisher27 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    services.arcgis.com—CC BY 4.0—
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public28 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.028 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence28 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 28 Oct 2026, 10:29 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.