PlanningRegister.ie
Planning report · Kildare County Council · 500 m around the house · the last 12 months · 3 Nov 2026, 18:48

Oak Park View, Naas

53.20690, -6.65799

Homes here mostly date from after 2016. Home extensions nearby almost always get approved (94%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built after 2016, with building records online.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2016–2021.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of NaasBuilt: most homes in this small area date from 2016–2021 (census estimate)most built2021: 5 files on Naas2022: 6 files on Naas2023: 3 files on Naas2024: 7 files on Naas2025: 8 files on Naas2026: 2 files on Naas31 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G4
Zoning · Open space
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningG4 · Open space
What it says

Open Space and Amenity: To protect and provide for open space, amenity and recreation provision.

Open space and recreational amenity, to be preserved as such.

naas local area plan 2021 2027 · 1 Dec 2021 – 24 Jan 2028

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1Ballycane House
Radon grid squares1
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 42 on the draft 2027 map; 42 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–97% by type. A new house in a garden is harder: 100% approved, and 1 in 3 is asked for more information.

Single-storey rear30 decided · more info asked 20%
97% · council 97%
Attic or dormer30 decided · more info asked 20%
93% · council 89%
New house in a garden or site10 decided · more info asked 40%
100% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 70 nearby, 2,348 council-wide

Figure 3

Naas, file by file since 2021

17 of 17 decided extensions on the road were approved. New houses in side gardens or on sites: 3 of 3.

31 planning files on Naas since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 16 · 2021 · single-storey rear · approved · 211019No. 21 · 2021 · attic conversion / dormer · approved · 211396No. 12 · 2021 · attic conversion / dormer · approved · 211734No. 3 · 2021 · single-storey rear · approved · 21709No. 11 · 2022 · attic conversion / dormer · approved · 221015No number · 2022 · porch / front · approved · 2222No. 3 · 2022 · single-storey rear · approved · 2264No. 37 · 2022 · single-storey rear · approved · 22726No. 39 · 2023 · single-storey rear · approved · 2360120No. 27 · 2024 · single-storey rear · approved · 24288No. 20 · 2024 · two-storey side · approved · 2431No. 20 · 2024 · attic conversion / dormer · approved · 2460009No number · 2024 · other extension · approved · 2460539No. 8 · 2025 · attic conversion / dormer · approved · 2560716No number · 2025 · other extension · approved · 2560941No. 10 · 2025 · attic conversion / dormer · approved · 2561285No number · 2026 · porch / front · approved · 2660275Porches, roofs, otherNo number · 2021 · other work · approved · 211270No. 23 · 2022 · other work · approved · 22487No. 13 · 2023 · other work · approved · 2360225No number · 2024 · other work · approved · 2460374No. 23 · 2024 · other work · approved · 2461107No number · 2025 · other work · approved · 2560855No number · 2025 · other work · approved · 2560896No number · 2025 · other work · approved · 2560989No. 14 · 2025 · other work · approved · 2561145No number · 2025 · other work · approved · 2561484No number · 2026 · other work · approved · 2660776New house in a side gardenNo. 1 · 2022 · new house · approved · 227361No number · 2023 · new house · approved · 23275No number · 2024 · new house · approved · 2461374
ApprovedRefusedWithdrawn or invalid

31 files with "Naas" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Dormer or attic11—

On Oak Park: 4 extensions in 10 years, 92% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 3 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days. 1 in 4 is asked for more information, which adds about 90 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 4): 140 days; Appeal window: 4 weeks; Building starts: 129 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 48–54 (n=84)50 daysIf more info asked (1 in 4)With further information: median 140 days (n=28)140 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 129 days after permission (n=44)129 days after permissionSigned off488 days after the start, for the few who file. 46% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated112 decided home extensions, 46 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    3 of 7 appealed refusals became permissions. 5 of 12 appealed approvals were reversed.

    Refusals appealed7 decided
    3 became permissions
    Approvals appealed12 decided
    5 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Oak Park View, Naas with 10 numbered planning items
    ⌖ the houseEmpty land zoned for homesApproved
    1. 10.6 ha zoned for homesEmpty land zoned for homes · 21 m
    2. 20.9 ha zoned for homesEmpty land zoned for homes · 62 m
    3. 30.3 ha zoned for homesEmpty land zoned for homes · 64 m
    4. 41.0 ha zoned for homesEmpty land zoned for homes · 114 m
    5. 50.5 ha zoned for homesEmpty land zoned for homes · 131 m
    6. 60.8 ha zoned for homesEmpty land zoned for homes · 138 m
    7. 7Craddockstown Court, Naas 2660776Approved with conditions · 35 m
    8. 810 Oak Park View, Naas 2561285Approved with conditions · 166 m
    9. 9Ballymore Road, Craddockstown 2660275Approved with conditions · 328 m
    10. 10The Poppylane Housing Development, Craddockstown North 2561484Approved with conditions · 467 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 26 permissions since 2016, 8 show a start notice and 3 have a completion certificate.

    26 applications lodged within 500 m. Council: 26 approved, 0 refused. After appeals: 26 approved. Of those: 3 signed off, 2 built with the owner's opt-out, 3 started, 17 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT26: lodged → approved26: approved → approved17: approved → no start notice found2: approved → built, owner opted out3: approved → started, not signed off3: approved → signed off1: approved → ran out26 lodged26 lodged26 approved26 approved26 approved26 approved17 no start notice found17 no start notice found2 built, owner opted out2 built, owner opted out3 started, not signed off3 started, not signed off3 signed off3 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured26 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 10 within 500 m

      Empty land zoned for homes 10

      • 10.6 ha zoned for homes · no homes built on it yet · 21 m
      • 20.9 ha zoned for homes · no homes built on it yet · 62 m
      • 30.3 ha zoned for homes · no homes built on it yet · 64 m
      • 41.0 ha zoned for homes · no homes built on it yet · 114 m
      • 50.5 ha zoned for homes · no homes built on it yet · 131 m
      • 60.8 ha zoned for homes · no homes built on it yet · 138 m
      • 0.2 ha zoned for homes · no homes built on it yet · 146 m
      • 1.9 ha zoned for homes · no homes built on it yet · 158 m
      • 1.3 ha zoned for homes · no homes built on it yet · 166 m
      • 0.3 ha zoned for homes · no homes built on it yet · 167 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 3 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
      Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
      National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
      Figure 8

      Applications within 500 m, by year

      Between 3 and 8 a year; busiest 2025. 100% of decisions were approvals.

      2021: 5, 2022: 3, 2023: 3, 2024: 5, 2025: 8, 2026: 205102021: 5 approved5’21*2022: 3 approved3’222023: 3 approved3’232024: 5 approved5’242025: 8 approved8’252026: 2 approved2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 6 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 3 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
      Building work nearby 2 in the last 12 months
      1 signed off as finished1 no sign-off needed
      • 10 Oak Park View, Naas, Kildare, W91 KH3V · 24 Apr 2026 · short notice no sign-off needed · 25/61285 · 176 m
      • Kingsquarter, Craddockstown Court, Naas, Kildare, W91 T447 · 16 Jan 2026 · 2 homes · 7-day notice signed off · 25/60896 · 55 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 3 Nov 2026, 03:31
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 3 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
      National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Oak Park · 14 applications in 10 years · 92% approved · most common: attic conversion / dormer

      Crèches and schools inspected

      NameLatest inspectionDistance
      Oak Park Maap Childcare · Crèche23 Apr 2026 · report · Tusla Early Years Inspectorate238 m
      Ballycane Preschool · Crèche15 Apr 2024 · report · Tusla Early Years Inspectorate754 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
      SourceLicenceFetchedLink
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Kildare County Council.
      Homes approved
      Here28
      Council middle0
      Homes started
      Here126
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
      National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      0% of homes built before 1971 (council 16%). 89% owner-occupied (council 71%).

      Homes built before 1971
      0% · council 16%
      Homes built since 2001
      98% · council 40%
      Owner-occupied
      89% · council 71%
      Rented
      10% · council 24%
      Children under 15
      28% · council 22%
      Aged 65 and over
      1% · council 12%
      Households with 2+ cars
      52% · council 51%
      Work mainly from home
      21% · council 12%
      This small area (304 people)Kildare

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087071054/02

      Bus
      463 m
      Naas Hospital · 880, 885, 895 · busiest stop within 500 m: 1 an hour at peak
      Radon
      1 in 10
      homes here likely high (EPA). Test it
      Nearest school
      540 m
      Naas Community National School, 364 pupils
      Homes sold nearby
      26
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Naas Community National School · primary · 364 pupils · 540 m
      • Craddockstown School · primary · 40 pupils · 540 m
      • An Linbh Iosa · primary · 401 pupils · 680 m
      • Scoil Chorbain · primary · 460 pupils · 962 m

      Stops 7

      • Naas Hospital · 880, 885, 895 · 1/hour at peak · 463 m
      • Naas Hospital · 139, 885, 895 · 1/hour at peak · 475 m
      • Naas Hospital · 880 · 0/hour at peak · 480 m
      • Hazelmere · 895 · 0/hour at peak · 534 m
      • Esmondale · 130, 130A, 880, GD02 · 1/hour at peak · 587 m
      • Esmondale · 130, 880, GD02 · 2/hour at peak · 614 m
      • Hazelmere · 895 · 0/hour at peak · 677 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Naas Community National School · 540 m+6.1% pupils (364) · temporary classrooms 2025, approved with conditions
      • Craddockstown School · 540 m+66.7% pupils (40) · temporary classrooms 2025, approved with conditions
      • An Linbh Iosa · 680 m-6.7% pupils (401)
      • Scoil Chorbain · 962 m-7.6% pupils (460)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 3 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.03 Nov 2026, 05:02open
      Council consultation portalsPublic3 Nov 2026, 01:12open
      Council meetings (ModernGov)Public3 Nov 2026, 02:30open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Zoned G4 (open space), not for homes: could you extend?
        Ask for: A solicitor's or planner's view.
        Solicitor · planner
      2. High radon area (1 in 10 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Cradockstown North
      Electoral division
      Naas Urban
      Electoral area
      Naas
      Council
      Kildare County Council
      Everything we found, as a list 8 lines
      • Zoned G4 (open space); not protected; no vacant land tax; high radon area.
      • 10 sites nearby could change: 10 empty zoned plots.
      • Naas Hospital (bus 880, 885) 462 m away: 1 an hour at morning peak; 3 from all stops within 500 m.
      • Here (2022 census): 89% owner-occupied (council 71%); 6% of homes empty (council 5%); most built 2016 or later; 62% drive to work (council 61%); population up 22% since 2016.
      • 1 home extension within 250 m since 2025. On Oak Park: 4 in 10 years, 92% approved.
      • Around here the council decides in a median 54 days (about 8 weeks); 1 in 3 is asked for more information.
      • Homes started within 1 km: 32 in the last year, 4 three years before.
      • 6 applications nearby in the last 12 months.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.03 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public3 Nov 2026
      www2.courts.ie—© the publisher2 Nov 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public3 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.03 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence3 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 3 Nov 2026, 18:48 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.