2660726 — application received — installation of an external platform lift, extension of the external deck at first floor level by 12 sq.m., extension of
5 weeks from receipt (17 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 465 m away
Observations close 1 Oct 202616 days left
D26B/0472/WEB — application received — Planning permission for attic conversion from hip roof to gable and dormer to r
5 weeks from receipt (27 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 0 m away
Appeal window closes 2 Oct 202617 days left
D26A/0658 — DECLARE APPLICATION INVALID — A Proposed additional new three-bedroom two storey house, with the existing hous
4 weeks from the council's decision (4 Sept 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer) · 487 m away
Observations close 7 Oct 202622 days left
D26A/0658 — application received — A Proposed additional new three-bedroom two storey house, with the existing hous
5 weeks from receipt (2 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 487 m away
Observations close 9 Oct 202624 days left
D26A/0668 — application received — We intend to apply for Planning Permission of the developmnet at this site. The
5 weeks from receipt (4 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 487 m away
R2 — Existing residentialcounty development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028
Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (5.57 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
installation of an external platform lift, extension of the external deck at first floor level by 12 sq.m., extension of the store area at ground level by 12 sq.m. and associated works to provide universal access at Bray Sailing Club,
retention of alterations to external windows and doors and clubhouse staircase, conversion of women's changing rooms to offices in the clubhouse building, infill extension of external deck, relocation of external staircase to deck to northern elevation of clubhouse, service access stair to roof space over changing room building, single storey steel shed at the southern end of the site, open canopy over entrance door in courtyard, two open perspex shelters to courtyard and two containers to courtyard; one containing additional ladies changing room and toilets and one containing a universal access WC and associated works, (Bray Sailing Club which is within the curtilage and/or adjacent to the protected structures Kelly's Bath House, RPS no.B97 and Martello Terrace, RPS no.B84)
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
No publishable utility-capacity record within the radius. 13 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
No site on the LDA register of relevant public lands within 500 m.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 15 Sept 2026, 21:19 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.