26160 — application received — section 42 - extension of appropriate period -21/906 - a new free-standing double garage together with associated site w
5 weeks from receipt (11 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 656 m away
Observations close 22 Sept 20268 days left
2660727 — application received — 17sq.m coffee/acai bar sited within the existing gym facility at ground floor
5 weeks from receipt (18 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 601 m away
Appeal window closes 22 Sept 20268 days left
2660630 — CONDITIONAL — a porch and a two storey extension to the front of existing dwelling
4 weeks from the council's decision (25 Aug 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer) · 485 m away
R2 — Existing residentialcounty development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028
Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
EPA-licensed facility
2
Bray Chemicals Ltd.; Nypro Limited
NIAH-recorded building
43
Bray Courthouse; Bray Bridge; Mount Herbert
Radon risk area
4
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
Record of Protected Structures
20
Saint James's Church; Saint James's Church; The Aske
This site is on an RZLT map — the draft map 2027 and the final map 2026 (3.38 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
section 42 - extension of appropriate period -21/906 - a new free-standing double garage together with associated site works and the removal of the existing, free-standing single car garage
addendums to previously approved (Planning Ref. 2655) the addendums will be as follows; changing the previously approved flat roof to a mono-pitched roof to the single storey extension (22.2sqm) to the rear of existing mid-terrace house and all associated site works at 2 Belton Terrace, Bray, Co. Wicklow
addendums to previously approved (Planning Ref. 2655) the addendums will be as follows; changing the previously approved flat roof to a mono-pitched roof to the single storey extension (22.2sqm) to the rear of existing mid-terrace house and all associated site works
demolition of existing commercial workshop measuring 66.5 sq. m. and construction of replacement workshop on the existing footprint with a slight increase in area to 70 sq. m. as a result of thinner external walls being constructed along with replacement signage and ancillary works at Unit 1 (to rear of 1 Fairview Terrace), Bray, Co. Wicklow
addendums to previously approved (Planning Ref. 26/55) single storey extension (22.2sqm) to the rear of existing mid-terrace house and all associated site works
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 49 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 14 Sept 2026, 04:16 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.