2660726 — application received — installation of an external platform lift, extension of the external deck at first floor level by 12 sq.m., extension of
5 weeks from receipt (17 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 475 m away
R2 — Existing residentialcounty development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028
Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (5.57 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
installation of an external platform lift, extension of the external deck at first floor level by 12 sq.m., extension of the store area at ground level by 12 sq.m. and associated works to provide universal access at Bray Sailing Club,
retention of alterations to external windows and doors and clubhouse staircase, conversion of women's changing rooms to offices in the clubhouse building, infill extension of external deck, relocation of external staircase to deck to northern elevation of clubhouse, service access stair to roof space over changing room building, single storey steel shed at the southern end of the site, open canopy over entrance door in courtyard, two open perspex shelters to courtyard and two containers to courtyard; one containing additional ladies changing room and toilets and one containing a universal access WC and associated works, (Bray Sailing Club which is within the curtilage and/or adjacent to the protected structures Kelly's Bath House, RPS no.B97 and Martello Terrace, RPS no.B84)
installation of an external platform lift, extension of the external deck at first floor level by 12 sq.m., extension of the store area at ground level by 12 sq.m. and associated works to provide universal access at Bray Sailing Club, Harbour Road, Bray, Co. Wicklow, A98P528 which is within the curtilage and/or adjacent to the protected structures Kelly’s Bath House, RPS no. B97 and Martello Terrace, RPS no. B84
installation of an external platform lift, extension of the external deck at first floor level by 12 sq.m., extension of the store area at ground level by 12 sq.m. and associated works to provide universal access
amendments to the Strategic Housing Development permitted under ABP-311181-21. The retention permission for amendments sought to Block C comprise of: A. Relocation of the vehicular entrance to the under-croft car park for Block C. B. Reconfiguration and changes of uses at the ground floor layout of Block C resulting in: - an increase in gross floor area of the permitted childcare facility from 627 sqm to 672 sqm; - the relocation of the permitted café unit and an increase in gross floor area from 195 sqm to 228 sqm;
- the relocation of the permitted convenience retail unit and an increase in gross floor area from 249 sqm to 420 sqm; and - the relocation and reconfiguration of ancillary uses. These changes have resulted in a net increase in gross floor area of 249 sqm (45 sqm increase to the childcare facility use, 33 sqm increase to the café use, 171 sqm increase to the convenience retail use) but with no change to the building footprint. C. Minor alterations to the ground floor external elevations to reflect relocation of vehicular entrance, reconfiguration of internal uses impacting on the positions of windows and door openings and addition of 2 no. external on-street car parking spaces
2560681received 2 Sept 2025decided 9 Oct 2025140 m away
mixed-use development comprising 341 no. residential units, commercial spaces (total gross floor area c. 10,778 sq.m), retail/retail services spaces (total gross floor area c. 8,155 sq.m), car and bicycle parking for residents and visitors, open spaces and associated supporting development infrastructure. The residential component will consist of: (i) 94 no. terraced houses (2-3 storeys in height) comprising 62 no. 3-bedrooms and 32 no. 4-bedrooms; all houses are provided with private open space, internal storage space, and refuse storage. (ii) 106 no. duplex own-door units (2-3 storeys in height) comprising 53 no. 2-bedrooms located at ground level and 53 no. 3-bedrooms at the upper floor level; all duplex own-door units are provided with private open space, internal storage space, and refuse storage. (iii) 109 no. apartments in Block E (3-15 storeys in height) consisting of 9 no. 1-bedroom, 83 no. 2-bedrooms, 9 no. 3-bedrooms and 8 no. 4-bedrooms and residential amenity spaces (c. 602 sq.m); all apartments are provided with balconies or terraces, internal storage space, and refuse storage within 1 no. internal refuse storage area on the undercroft floor level; (iv) 32 no. apartments in Block H (3-4 storeys in height) consisting of 18 no. 1-bedroom, 12 no. 2-bedrooms and 2 no. 3-bedrooms; all apartments are provided with balconies or terraces, internal storage space, and refuse storage within 2 no. internal refuse storage areas on the ground floor level; The commercial and retail/retail services component will consist of: (i) Block E comprising 1 no. public house (c. 804 sq.m), 2 no. retail units (combined c. 908 sq.m); (ii) Block G (1-2 storeys in height) comprising 3 no. retail units (total gross floor area c. 2,550 sq.m); (iii) Block H comprising 1 no. medical centre (c. 706 sq.m), 1 no. childcare facility (c. 762 sq.m), and 1 no. retail unit (c. 94 sq.m); and (iv) Block I (3-7 storeys in height) comprising 1 no. hotel of 150 no. rooms (c. 10,016 sq.m) with associated wellbeing centre and pool (c. 1,169 sq.m), wedding/function venue (c. 633 sq.m), rooftop restaurant (c. 883 sq.m), and 1 no. retail unit (c. 408 sq.m). In addition, the proposed development will also comprise the provision of supporting and ancillary infrastructure, including 532 car parking spaces, 1,003 bicycle parking spaces, open spaces, and all associated ancillary site works
2560207received 24 Mar 2025decided 30 Sept 2025189 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 11 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
No site on the LDA register of relevant public lands within 500 m.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 12 Sept 2026, 23:00 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.