Planning report · Kildare County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 23:26

Blessington Road

53.21664, -6.65477

Homes here mostly date from the 1980s. 3 planning files on this house, the latest from 2025. Home extensions nearby almost always get approved (95%). 58 homes approved 334 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992). 3 planning files on this house, the latest from 2026.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990. 3 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of NaasBuilt: most homes in this small area date from 1981–1990 (census estimate)most built2026: 2561143 · new house, approved2023: 23746 · porch, approved2023: 23639 · porch, withdrawn or invalid2021: 18 files on Naas2022: 16 files on Naas2023: 18 files on Naas2024: 14 files on Naas2025: 17 files on Naas2026: 9 files on Naas92 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    2561143 · new house · approved 2026 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2023
    23746 · porch · approved 2023 · started, no sign-off needed
    approvedstartedsigned off?
  3. 2023
    23639 · porch · withdrawn
    approved?started?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential / Infill: To protect and enhance the amenity of established residential communities and promote sustainable intensification.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

naas local area plan 2021 2027 · 1 Dec 2021 – 24 Jan 2028

Protected building1 within 100 m Sunday's well
Monument zone1 within 100 m Ritual site - holy well, Naas East
Radon1 in 10 homes have high radon (EPA)

Not on this site: heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: LPD (Ireland) Limited/Weathercreate Coatings Limited (615 m)

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings9house; Hill House
Radon grid squares1
Monuments4Castle - tower house; Ritual site - holy well
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 49 on the draft 2027 map; 49 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Sites and Monuments Record, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–100% by type. A new house in a garden is harder: 89% approved, and 1 in 3 is asked for more information.

Single-storey rear42 decided · more info asked 17%
95% · council 97%
Two-storey rear13 decided · more info asked 15%
92% · council 93%
Single-storey side17 decided · more info asked 24%
100% · council 99%
Attic or dormer43 decided · more info asked 21%
93% · council 89%
New house in a garden or site19 decided · more info asked 32%
89% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 134 nearby, 2,731 council-wide

Figure 3

Naas, file by file since 2021

30 of 31 decided extensions on the road were approved. New houses in side gardens or on sites: 4 of 4.

92 planning files on Naas since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 41 · 2021 · single-storey rear · approved · 211035No. 247 · 2021 · rear · approved · 211128No. 21 · 2021 · attic conversion / dormer · approved · 211396No. 105 · 2021 · single-storey side · approved · 211823No. 38 · 2021 · single-storey rear · approved · 21446No. 15 · 2021 · single-storey rear · approved · 21590No. 70 · 2021 · single-storey rear · approved · 21702No. 22 · 2021 · single-storey rear · approved · 21778No. 44 · 2022 · porch / front · approved · 221100No. 5 · 2022 · two-storey side · approved · 22391No. 9 · 2022 · attic conversion / dormer · approved · 22420No number · 2022 · single-storey rear · approved · 22520No. 8 · 2023 · two-storey side · approved · 23306No. 9 · 2023 · single-storey rear · approved · 23589No number · 2023 · two-storey rear · approved · 2360071No number · 2023 · single-storey rear · approved · 23962No. 150 · 2024 · porch / front · approved · 24170No. 60 · 2024 · single-storey rear · approved · 24396No. 30 · 2024 · single-storey side · approved · 2453No. 12 · 2024 · single-storey rear · approved · 2461179No number · 2024 · single-storey rear · approved · 2461273No number · 2024 · other extension · refused · 2461395No. 21 · 2024 · side · approved · 2496No number · 2025 · attic conversion / dormer · approved · 25170No. 42 · 2025 · attic conversion / dormer · approved · 2560574No number · 2025 · attic conversion / dormer · approved · 2560972No. 38 · 2025 · single-storey rear · approved · 2560976No. 3 · 2025 · other extension · approved · 2561315No. 52 · 2025 · single-storey rear · approved · 2561367No number · 2026 · other extension · approved · 2660469No. 78 · 2026 · single-storey rear · approved · 2660901Porches, roofs, otherNo. 6 · 2021 · other work · approved · 211194No. 9 · 2021 · other work · approved · 211333No number · 2021 · other work · approved · 21141No. 9 · 2021 · other work · approved · 211638No. 5 · 2021 · other work · approved · 211653No number · 2021 · other work · approved · 211753No number · 2021 · other work · approved · 21397No. 6 · 2021 · other work · approved · 21765No number · 2021 · other work · approved · 21870No. 9 · 2022 · other work · approved · 221183No. 1 · 2022 · other work · approved · 221321No number · 2022 · other work · refused · 221490No number · 2022 · other work · approved · 22164No. 58 · 2022 · other work · approved · 22314No number · 2022 · other work · refused · 22371No number · 2022 · other work · approved · 22578No number · 2022 · other work · refused · 22652No. 31 · 2022 · other work · approved · 22780No number · 2022 · other work · approved · 22948No number · 2022 · other work · approved · 22969No number · 2022 · other work · approved · 2299No. 78 · 2023 · other work · approved · 23185No. 8 · 2023 · other work · approved · 23228No number · 2023 · other work · approved · 23229No. 16 · 2023 · other work · approved · 23249No number · 2023 · other work · approved · 2360171No number · 2023 · other work · approved · 2360193No number · 2023 · other work · approved · 2360293No. 13 · 2023 · other work · approved · 2360352No number · 2023 · other work · approved · 23675No number · 2023 · other work · approved · 23749No number · 2023 · other work · approved · 23750No number · 2023 · other work · approved · 23839No. 1 · 2024 · other work · approved · 24346No number · 2024 · other work · approved · 2447No. 44 · 2024 · other work · approved · 2460343No. 11 · 2024 · other work · approved · 2460992No number · 2024 · other work · refused · 2461044No number · 2024 · other work · refused · 2461161No. 60 · 2024 · other work · approved · 2461221No. 48 · 2025 · other work · refused · 25176No. 1 · 2025 · other work · approved · 2549No. 16 · 2025 · other work · approved · 2560718No number · 2025 · other work · approved · 2560763No number · 2025 · other work · refused · 2560789No. 46 · 2025 · other work · approved · 2560845No number · 2025 · other work · approved · 2560863No. 17 · 2025 · other work · approved · 2560960No number · 2025 · other work · approved · 2561143No. 2A · 2025 · other work · approved · 2561286No number · 2026 · other work · approved · 2660016No number · 2026 · other work · approved · 2660168No number · 2026 · other work · approved · 2660250No. 8 · 2026 · other work · approved · 2660258No. 21 · 2026 · other work · approved · 2660452No number · 2026 · other work · refused · 2660544No. 8 · 2026 · other work · approved · 2660652New house in a side gardenNo number · 2021 · new house · approved · 21268No. 9 · 2023 · new house · approved · 23600589No number · 2023 · new house · approved · 23746No. 362 · 2025 · new house · approved · 2560063362
ApprovedRefusedWithdrawn or invalid

92 files with "Naas" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days. 1 in 4 is asked for more information, which adds about 89 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 4): 139 days; Appeal window: 4 weeks; Building starts: 140 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 48–54 (n=127)50 daysIf more info asked (1 in 4)With further information: median 139 days (n=39)139 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 140 days after permission (n=54)140 days after permissionSigned off470 days after the start, for the few who file. 61% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated166 decided home extensions, 56 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    3 of 9 appealed refusals became permissions. 5 of 14 appealed approvals were reversed.

    Refusals appealed9 decided
    3 became permissions
    Approvals appealed14 decided
    5 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 501929 Pending · 8, Thornbrook, Naas East, Naas, Co. Kildare. · 223 m
    • 501894 Pending · Dublin Rd / Gleann Na Greine , Naas , Co. Kildare · 472 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 23:12
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 4

    What's changing around you?

    Street map around Blessington Road with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedLarge schemeRefusedEmpty land zoned for homesApprovedNo decision yet
    1. 1No. 64 Mountain View, Naas 2661143No decision yet · 382 m
    2. 2no. 79 Mountain View, Naas 2661140No decision yet · 481 m
    3. 3An Post Depot 2461273Approved, no sign building has started · 334 m
    4. 4Site at lands west of Naas Racecourse south of Dublin Road, north of Tipper Road and generally bounded by existing residential developments to the north south and west at Kings Court Kingsfurze Avenue The Woodlands and The Gallops 2660469Approved with conditions · 380 m
    5. 5Millbrook, Naas 2660544Refused · 200 m
    6. 60.8 ha zoned for homesEmpty land zoned for homes · 39 m
    7. 71.7 ha zoned for homesEmpty land zoned for homes · 67 m
    8. 80.7 ha zoned for homesEmpty land zoned for homes · 75 m
    9. 90.6 ha zoned for homesEmpty land zoned for homes · 110 m
    10. 100.7 ha zoned for homesEmpty land zoned for homes · 114 m
    11. 110.7 ha zoned for homesEmpty land zoned for homes · 119 m
    12. 128 Thornbrook, Naas East 2660258Approved with conditions · 223 m
    13. 13Millbrook, Naas 2660613No decision yet · 238 m
    14. 14Millbrook, Naas 2660168Approved with conditions · 289 m
    15. 15lands south of Tipper Road, Naas 25170Approved with conditions · 331 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 46 permissions since 2016, 18 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    54 applications lodged within 500 m. Council: 48 approved, 6 refused. After appeals: 46 approved. Of those: 0 signed off, 13 built with the owner's opt-out, 5 started, 24 with no start notice found, 4 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT48: lodged → approved6: lodged → refused44: approved → approved4: refused → refused2 approved by the council, refused after an appeal2 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal24: approved → no start notice found13: approved → built, owner opted out5: approved → started, not signed off4: approved → ran out54 lodged54 lodged48 approved48 approved6 refused6 refused46 approved46 approved6 refused6 refused2 withdrawn2 withdrawn24 no start notice found24 no start notice found13 built, owner opted out13 built, owner opted out5 started, not signed off5 started, not signed off4 ran out4 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured54 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 19 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-19 2661140: application received — Planning Permission is sought to remove condition no. 3 of Pl Ref 05/500002 which relates to the joint occupation of the; 2026-11-19 2661143: application received — construction of a single-storey extension to the side and rear, construction of a new single-storey porch to the front, today5 Nov10 Nov15 Nov20 Nov25 Nov30 Nov2661140: application received — Planning Permission is sought to remove condition no. 3 of Pl Ref 05/500002 which relates to the joint occupation of the · 481 m away · 2026-11-192661143: application received — construction of a single-storey extension to the side and rear, construction of a new single-storey porch to the front, · 382 m away · 2026-11-19
    Comments close
    • Comments close 19 Nov 202619 days left
      22661140 · application received — Planning Permission is sought to remove condition no. 3 of Pl Ref 05/500002 which relates to the…
      €20 to the council · 481 m away
    • Comments close 19 Nov 202619 days left
      12661143 · application received — construction of a single-storey extension to the side and rear, construction of a new…
      €20 to the council · 382 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    58 homes 334 m away were approved May 2025 with no start notice yet; the permission runs to May 2030.

    An Post Depot · 58 homes: 58 homes approved May 2025, not started20242025202620272028202920302031An Post Depot · 58 homes334 m · 246127358 homes approved May 2025, not started58 homes approved May 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 500 m

    Approved, not started 1

    • An Post Depot · 58 homes approved May 2025, not started · 334 m

    Empty land zoned for homes 10

    • 60.8 ha zoned for homes · no homes built on it yet · 39 m
    • 71.7 ha zoned for homes · no homes built on it yet · 67 m
    • 80.7 ha zoned for homes · no homes built on it yet · 75 m
    • 90.6 ha zoned for homes · no homes built on it yet · 110 m
    • 100.7 ha zoned for homes · no homes built on it yet · 114 m
    • 110.7 ha zoned for homes · no homes built on it yet · 119 m
    • 4.1 ha zoned for homes · no homes built on it yet · 139 m
    • 1.2 ha zoned for homes · no homes built on it yet · 155 m
    • 0.9 ha zoned for homes · no homes built on it yet · 174 m
    • 1.2 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 9 and 11 a year; busiest 2023. 89% of decisions were approvals.

    2021: 9, 2022: 10, 2023: 11, 2024: 9, 2025: 9, 2026: 6051015202021: 9 approved9’21*2022: 8 approved2022: 2 refused10’222023: 11 approved11’232024: 7 approved2024: 2 refused9’242025: 8 approved2025: 1 refused9’252026: 5 approved2026: 1 refused6’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 2no. 79 Mountain View , Naas , Co Kildare comments close 19 Nov 2026
      Planning Permission is sought to remove condition no. 3 of Pl Ref 05/500002 which relates to the joint…
      266114015 Oct 20261 homes481 m
    • 1No. 64 Mountain View , Naas , Co. Kildare comments close 19 Nov 2026
      construction of a single-storey extension to the side and rear, construction of a new single-storey porch to…
      266114315 Oct 2026382 m
    Every application within 500 m 13 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 4 in the last 12 months
    1 not signed off3 no sign-off needed
    • 8 Millbrook, Naas, Kildare · 31 Aug 2026 · 9 homes · start notice not signed off · 24/61161 & ABP-322381-25 · 322 m
    • Blessington Road, Naas, Kildare, W91 FY7A · 13 May 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60972 · 389 m
    • Sundays Well, Naas, Kildare · 27 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 2561143 · 18 m
    • 15 Elmwood, Naas, Kildare, W91 NW2T · 20 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 21/590 · 118 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 58 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Sunday's Well · 6 applications in 10 years · most common: attic conversion / dormer

    Crèches and schools inspected

    NameLatest inspectionDistance
    Ballycane Preschool · Crèche15 Apr 2024 · report · Tusla Early Years Inspectorate353 m
    Sticky Fingers Childcare Centre · Crèche12 Jan 2026 · report · Tusla Early Years Inspectorate587 m
    Maap Childcare Ltd. T/A Tots Crèche and Daycare Nursery Ltd. · Crèche3 Dec 2024 · report · Tusla Early Years Inspectorateapprox. 846 m
    Better Together Preschool · Crèche18 Jun 2024 · report · Tusla Early Years Inspectorateapprox. 846 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Kildare County Council.
    Homes approved
    Here578
    Council middle0
    Homes started
    Here214
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    1% of homes built before 1971 (council 16%). 73% owner-occupied (council 71%).

    Homes built before 1971
    1% · council 16%
    Homes built since 2001
    6% · council 40%
    Owner-occupied
    73% · council 71%
    Rented
    24% · council 24%
    Children under 15
    18% · council 22%
    Aged 65 and over
    12% · council 12%
    Households with 2+ cars
    56% · council 51%
    Work mainly from home
    10% · council 12%
    This small area (242 people)Kildare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087071027

    Bus
    543 m
    Poplar Sq · 125, 126, 126A
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Nearest school
    460 m
    An Linbh Iosa, 401 pupils
    Homes sold nearby
    22
    in 3 years, 2 new (Property Price Register)
    Schools, stops and the council

    Schools

    • An Linbh Iosa · primary · 401 pupils · 460 m
    • Meánscoil Iognáid Ris · postprimary · 1013 pupils · 486 m
    • Scoil Chorbain · primary · 460 pupils · 585 m
    • Coláiste Naomh Mhuire · postprimary · 1076 pupils · 723 m
    • Mercy Convent Primary School · primary · 607 pupils · 800 m
    • Gaelcholáiste Chill Dara · postprimary · 401 pupils · 981 m

    Stops 12

    • Poplar Sq · 125, 126, 126A, 126B, 126D, 126E · 6/hour at peak · 543 m
    • Hazelmere · 895 · 0/hour at peak · 545 m
    • St Corban's Place · 125, 126, 126A, 126D, 126N, 126T · 3/hour at peak · 590 m
    • Naas · 125, 126, 126A, 126D, 126N, 126T · 7/hour at peak · 612 m
    • St Corban's Place · 125, 126, 126A, 126B, 126D, 126E · 4/hour at peak · 612 m
    • Poplar Sq · 139, 885, 895 · 1/hour at peak · 618 m
    • Poplar Sq · 139, 885, 895 · 1/hour at peak · 622 m
    • Naas · 125, 126, 126A, 126B, 126D, 126E · 8/hour at peak · 624 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • An Linbh Iosa · 460 m-6.7% pupils (401)
    • Meánscoil Iognáid Ris · 486 m-0.3% pupils (1,013) · a pitch or play area 2026, approved with conditions
    • Scoil Chorbain · 585 m-7.6% pupils (460)
    • Coláiste Naomh Mhuire · 723 m-0.7% pupils (1,076)
    • Mercy Convent Primary School · 800 m+1.5% pupils (607)
    • Gaelcholáiste Chill Dara · 981 m-0.2% pupils (401)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. New house (2561143) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    2. Porch (23746) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    3. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    4. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    5. Application 382 m away open for comments until 19 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Naas East
    Electoral division
    Naas Urban
    Electoral area
    Naas
    Council
    Kildare County Council
    Everything we found, as a list 8 lines
    • 3 applications on this site; latest 2561143, approved 2026, started, no sign-off needed.
    • Zoned R2 (existing residential); not protected; on the vacant land tax map; high radon area.
    • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
    • 2 applications open for comments nearby; nearest closes 19 Nov 2026.
    • 58 homes approved nearby, not started; largest 58 at An Post Depot.
    • No morning-peak service within 500 m; nearest is Poplar Sq, 543 m away (6 an hour).
    • Here (2022 census): 73% owner-occupied (council 71%); 3% of homes empty (council 5%); most built 1981–1990; 61% drive to work (council 61%); population up 22% since 2016.
    • Around here the council decides in a median 54 days (about 8 weeks); 1 in 3 is asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 23:26 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.