steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Radon grid squares2
Monuments50Cist; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 9 on the draft 2027 map; 9 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 22 Oct 2026, 02:28
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 60% approved, and 1 in 2 are asked for more information.

New house in a garden or site10 decided · more info asked 50%
60% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 10 nearby, 2,007 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 22 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 22 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
    National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
    Question 3

    How long, and what if someone objects?

    Figure 3

    What appeals changed

    0 of 1 appealed refusals became permissions. 0 of 2 appealed approvals were reversed.

    Refusals appealed1 decided
    0 became permissions
    Approvals appealed2 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around L2019 with 12 numbered planning items
    ⌖ the houseEmpty land zoned for homesApprovedNo decision yet
    1. 11.5 ha zoned for homesEmpty land zoned for homes · 1.8 km
    2. 20.8 ha zoned for homesEmpty land zoned for homes · 1.8 km
    3. 30.8 ha zoned for homesEmpty land zoned for homes · 1.9 km
    4. 40.2 ha zoned for homesEmpty land zoned for homes · 1.9 km
    5. 50.2 ha zoned for homesEmpty land zoned for homes · 1.9 km
    6. 60.3 ha zoned for homesEmpty land zoned for homes · 2.0 km
    7. 7Bridlewood, Forenaughts Naas 2660440Approved with conditions · 291 m
    8. 8Primrose Lodge, Newtown Eadestown 2660727Approved with conditions · 649 m
    9. 9Tipper East, Naas 2660059Approved with conditions · 1.4 km
    10. 10Sundew, Fishery Lane 2660040Approved with conditions · 1.5 km
    11. 11Furness Farm, Forenaghts Great 2660778No decision yet · 1.7 km
    12. 12Tipper South, Naas 2561327Approved with conditions · 1.8 km
    Figure 4

    The next 30 days

    Nothing closes within 2.0 km in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 9 within 2.0 km

      Empty land zoned for homes 9

      • 11.5 ha zoned for homes · no homes built on it yet · 1.8 km
      • 20.8 ha zoned for homes · no homes built on it yet · 1.8 km
      • 30.8 ha zoned for homes · no homes built on it yet · 1.9 km
      • 40.2 ha zoned for homes · no homes built on it yet · 1.9 km
      • 50.2 ha zoned for homes · no homes built on it yet · 1.9 km
      • 60.3 ha zoned for homes · no homes built on it yet · 2.0 km
      • 0.4 ha zoned for homes · no homes built on it yet · 2.0 km
      • 0.4 ha zoned for homes · no homes built on it yet · 2.0 km
      • 2.4 ha zoned for homes · no homes built on it yet · 2.0 km

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 22 Oct 2026, 02:28
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
      Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
      National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
      Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
      Figure 5

      Applications within 500 m, by year

      Between 1 and 1 a year; busiest 2023. 83% of decisions were approvals.

      2021: 3, 2023: 1, 2024: 1, 2026: 105102021: 2 approved2021: 1 refused3’21*2023: 1 approved1’232024: 1 approved1’242026: 1 approved1’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 2.0 km 11 in the last 12 months

      See every application on the map

      • 11Furness Farm , Forenaghts Great , Kill Co. Kildare No decision yet
        for a Proposed Single Storey Dwelling House, Garage, Site Entrance, Tertiary Treatment System & Infiltration…
        26607789 Jul 20261.7 km
      • Furness Farm , Forenaghts Great , Kill Co. Kildare Withdrawn or not valid
        Planning Permission for a Proposed Single Storey Dwelling House, Garage, Site Entrance, Tertiary Treatment…
        26607423 Jul 20261.7 km
      • 8Primrose Lodge , Newtown Eadestown , Naas Approved with conditions
        for the proposed extension and renovation of the existing dwelling, including alterations to all elevations,…
        266072720 Aug 2026649 m
      • 7Bridlewood , Forenaughts Naas , Co.Kildare Approved with conditions
        Retention for the existing single storey extension to the north of the existing two storey main dwelling…
        266044016 Jun 20261 homes291 m
      • Bridlewood , Forenaughts , Naas Withdrawn or not valid
        the existing single storey extension to the north of the existing two storey main dwelling (reg. ref.…
        266043622 Apr 20261 homes291 m
      • Primrose Lodge , Newtown , Naas Approved with conditions
        for the proposed extension & renovation of the existing dwelling including changes to all elevations,…
        26601455 May 2026649 m
      • Primrose Lodge , Newtown , Naas Withdrawn or not valid
        proposed extension & renovation of the existing dwelling including changes to all elevations, replacing the…
        26601026 Feb 2026649 m
      • 9Tipper East , Naas , Co. Kildare Approved with conditions
        A) Construction of a new 3 bedroom single storey dwelling and single storey domestic garage, B) New…
        26600598 Jun 20261 homes1.4 km
      • 10Sundew , Fishery Lane , Naas Approved with conditions
        1) Demolition of existing chimney stacks, 2) Demolition of existing single storey section to the rear (south)…
        266004017 Aug 20261.5 km
      • Sundew , Fishery Lane , Naas Withdrawn or not valid
        consists of 1)Demolition of existing chimney stacks, 2) Demolition of existing single storey section to the…
        256150223 Dec 20251.5 km
      • 12Tipper South , Naas , Co. Kildare Approved with conditions
        the construction of a single storey ‘family flat’ attached to the side of the existing single storey detached…
        256132729 Jan 20261.8 km
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 22 Oct 2026, 02:28
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
      Building work nearby 4 in the last 12 months
      1 not signed off3 no sign-off needed
      • Tipper East, Naas, Kildare · 13 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 2660059 · 1.5 km
      • Westown, Johnstown, Kildare, W91 KAX6 · 20 Mar 2026 · start notice not signed off · 24/61304 · 1.7 km
      • Newtown, Eadestown, Kildare · 1 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 2560494 · 1.8 km
      • Newtown, Eadestown, Kildare · 1 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 2560494 · 1.8 km
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 22 Oct 2026, 02:10
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
      0
      How busy is this area About as busy as most of Kildare County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here1
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 22 Oct 2026, 02:28
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
      National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
      Question 5

      What's the area like?

      Figure 6

      This street block against the council

      92% owner-occupied (council 71%).

      Homes built before 1971
      21% · council 16%
      Homes built since 2001
      31% · council 40%
      Owner-occupied
      92% · council 71%
      Rented
      1% · council 24%
      Children under 15
      19% · council 22%
      Aged 65 and over
      17% · council 12%
      Households with 2+ cars
      73% · council 51%
      Work mainly from home
      16% · council 12%
      This small area (473 people)Kildare

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087081001

      Radon
      1 in 10
      homes here likely high (EPA). Test it
      Homes sold nearby
      9
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      None nearby.

        Stops 0

          Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 23 Oct 2026, 01:47
          SourceLicenceFetchedLink
          Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
          Department of Education school listCC BY 4.027 Sept 2026, 23:32open
          Council consultation portalsPublic23 Oct 2026, 01:47open
          Council meetings (ModernGov)Public22 Oct 2026, 02:38open
          Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
          cso_saps_2022CC BY 4.0—open
          National Transport AuthorityCC BY 4.0——
          Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
          dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
          EPA strategic noise mapsCC BY 4.0——
          Fingal County CouncilCC BY 4.0——
          Question 6

          What to ask, and who

          1. High radon area (1 in 10 homes): has it been tested?
            Ask for: Radon test results.
            Seller
          2. Any work done without planning permission?
            Ask for: An opinion of compliance for the whole house.
            Seller · solicitor
          Reference

          Where this is, the terms, the sources

          Townland
          Forenaghts Little
          Electoral division
          Rathmore
          Electoral area
          Naas
          Council
          Kildare County Council
          Everything we found, as a list 8 lines
          • Not protected; no vacant land tax; high radon area.
          • 9 sites nearby could change: 9 empty zoned plots.
          • No scheduled public transport within 800 m.
          • Here (2022 census): 92% owner-occupied (council 71%); 9% of homes empty (council 5%); most built 1991–2000; 67% drive to work (council 61%); population up 3% since 2016.
          • The council decides in a median 61 days (about 9 weeks); 43% are asked for more information.
          • 11 applications nearby in the last 12 months; 100% approved (council 80%).
          • 1 homes started within 1 km in 3 years (council middle 1).
          • 9 sales nearby in 3 years; median €740,000.
          What the terms mean 5 terms
          • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
          • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
          • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
          • Approved (Grant of permission): The council said yes, usually with conditions.
          • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
          Sources and licences 25
          SourcePublisherLicenceFetched
          EPA strategic noise maps—CC BY 4.0—
          Fingal County Council—CC BY 4.0—
          Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
          National Transport Authority—CC BY 4.0—
          services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
          data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.022 Oct 2026
          data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
          gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
          services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
          dlrcoco.citizenspace.comLocal authorities (consultation portals)Public23 Oct 2026
          www2.courts.ie—© the publisher22 Oct 2026
          cso.ie—CC BY 4.0—
          dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
          services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
          transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
          lda.ieLand Development AgencyCC BY 4.011 Sept 2026
          meetings.fingal.ieLocal authorities (council meetings)Public22 Oct 2026
          services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.022 Oct 2026
          services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
          services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
          propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence23 Oct 2026
          services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
          gov.ieDepartment of EducationCC BY 4.027 Sept 2026
          gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
          services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
          Measured
          counted from a public register
          Calculated
          a rate or median we worked out from those counts
          Our classification
          we sorted it by reading each description
          Estimate
          inferred from another source (census, map data)
          Rule summary
          the law, simplified: check before relying on it
          How we work this out
          Generated 23 Oct 2026, 01:50 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.