PlanningRegister.ie
Planning report · Kildare County Council · 2000 m around the house · the last 12 months · 26 Oct 2026, 06:06

L6030

53.22996, -6.52492

Homes here mostly date from the 1970s. 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
Yes
Protected or listed · inside the zone around a recorded monument (KD020-007010-)
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Monument zoneOn this site Graveyard, Kilteel Upper; Cross-inscribed stone (present location), Kilteel Upper
Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Licensed industrial sites2Saint-Gobain Building Distribution (ROI) Ltd
Natural heritage areas1Kilteel Wood
Heritage inventory buildings2water pump; Catholic Church of Saint Laurence O'Toole
Radon grid squares5
Monuments21Barrow - ring-barrow; Castle - tower house
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, SMR zones of notification, Residential Zoned Land Tax maps, Constraint layers (bundle), EPA licensed sites, Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 71% approved, and 71% are asked for more information.

New house in a garden or site7 decided · more info asked 71%
71% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 7 nearby, 1,067 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 3

    How long, and what if someone objects?

    Appeals nearby 1 in the last 12 months
    • 501890 Pending · Timbervale , Kilteel , Co. Kildare · 394 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher25 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 4

    What's changing around you?

    Street map around L6030 with 6 numbered planning items
    ⌖ the houseOpen for commentsRefusedNo decision yetApproved
    1. 1Blackdown, Kilteel 2661088No decision yet · 646 m
    2. 2Kilteel upper, Kilteel 2661078No decision yet · 763 m
    3. 3Timbervale, Kilteel 2660151Refused · 394 m
    4. 4Furryhill and, Punchestown Upper 2660915No decision yet · 734 m
    5. 5Furryhill, Rathmore 2660079Approved with conditions · 790 m
    6. 6Cromwellstown, Kilteel 2660655Approved with conditions · 1.6 km
    Figure 3

    The next 30 days

    2 deadlines within 2.0 km; the first closes 3 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-03 2661078: application received — Full planning for the following development construction of a single storey extension the side with a dormer extension t; 2026-11-04 2661088: application received — construction of a 2 storey extension to rear (total floor area of extension = 18.5sqm) of existing 1.5 storey detached dtoday31 Oct5 Nov10 Nov15 Nov20 Nov25 Nov2661078: application received — Full planning for the following development construction of a single storey extension the side with a dormer extension t · 763 m away · 2026-11-032661088: application received — construction of a 2 storey extension to rear (total floor area of extension = 18.5sqm) of existing 1.5 storey detached d · 646 m away · 2026-11-04
    Comments close
    • Comments close 3 Nov 20268 days left
      22661078 · application received — Full planning for the following development construction of a single storey extension the side…
      €20 to the council · 763 m away
    • Comments close 4 Nov 20269 days left
      12661088 · application received — construction of a 2 storey extension to rear (total floor area of extension = 18.5sqm) of…
      €20 to the council · 646 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Open for comments €20 to comment

    • 2Kilteel upper , Kilteel , Co. Kildare comments close 3 Nov 2026
      Full planning for the following development construction of a single storey extension the side with a dormer…
      266107829 Sept 2026763 m
    • 1Blackdown , Kilteel , Co. Kildare comments close 4 Nov 2026
      construction of a 2 storey extension to rear (total floor area of extension = 18.5sqm) of existing 1.5 storey…
      266108830 Sept 2026646 m
    Every application within 2.0 km 11 in the last 12 months

    See every application on the map

    • Blackdown , Kilteel , Kildare Withdrawn or not valid
      Construction of a 2 storey extension to rear (total floor area of extension = 18.5sqm) of existing 1.5 storey…
      266106024 Sept 2026646 m
    • 4Furryhill and , Punchestown Upper , County Kildare No decision yet
      for the construction of approximately 960m of new restored stream channels and riparian buffer; 2 no. new…
      266091512 Aug 2026734 m
    • Townlands of Furryhill , Kilteel , County Kildare Withdrawn or not valid
      consists of the restoration of an eroding and modified portion of the Hartwell River in the townland of…
      26608976 Aug 2026734 m
    • Blackdown , Oldmilltown , Coolahocka Withdrawn or not valid
      RED III will consist of an application for a 10-year planning permission for the construction of, and a…
      266080014 Jul 20261.1 km
    • 6Cromwellstown , Kilteel , Co. Kildare Approved with conditions
      to build a detached domestic garage and for all associated site works
      266065510 Aug 20261.6 km
    • Foxcovert Lane , Kilteel , Naas Withdrawn or not valid
      a circa 82sq.m shed for domestic use ancillary to the existing dwelling and all associated site works
      266051213 May 2026682 m
    • 3Timbervale , Kilteel , Co. Kildare Refused
      To part demolish the existing single storey dwelling, • To extend, renovate & re-roof the existing single…
      266015117 Jul 2026394 m
    • Timbervale , Kilteel , Co. Kildare Withdrawn or not valid
      to part demolish the existing single storey dwelling, to extend, renovate & re-roof the existing single…
      266014217 Feb 20261 homes394 m
    • 5Furryhill , Rathmore , Co.Kildare Approved with conditions
      consist of: - Removal of the existing single storey utility room to the side. - Construction of new single…
      26600792 Jul 2026790 m
    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    0
    How busy is this area About as busy as most of Kildare County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here4
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 5

    What's the area like?

    Figure 4

    This street block against the council

    90% owner-occupied (council 71%).

    Homes built before 1971
    19% · council 16%
    Homes built since 2001
    31% · council 40%
    Owner-occupied
    90% · council 71%
    Rented
    6% · council 24%
    Children under 15
    20% · council 22%
    Aged 65 and over
    17% · council 12%
    Households with 2+ cars
    77% · council 51%
    Work mainly from home
    15% · council 12%
    This small area (376 people)Kildare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087060002

    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Homes sold nearby
    6
    in 3 years, 1 new (Property Price Register)
    Schools, stops and the council

    Schools

    None nearby.

      Stops 0

        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 26 Oct 2026, 01:54
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
        Department of Education school listCC BY 4.027 Sept 2026, 23:32open
        Council consultation portalsPublic26 Oct 2026, 00:55open
        Council meetings (ModernGov)Public26 Oct 2026, 01:54open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Next to a recorded monument: does digging need notice?
          Ask for: Details of past works from the seller.
          Seller · council
        2. High radon area (1 in 10 homes): has it been tested?
          Ask for: Radon test results.
          Seller
        3. Application 646 m away open for comments until 4 Nov 2026: comment?
          Ask for: The plans on the council's website (€20 to comment).
          Council
        4. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Oldtown
        Electoral division
        Kilteel
        Electoral area
        Naas
        Council
        Kildare County Council
        Everything we found, as a list 8 lines
        • Monument zone; no vacant land tax; high radon area.
        • Nothing nearby looks set to change.
        • 2 applications open for comments nearby; nearest closes 4 Nov 2026.
        • No scheduled public transport within 800 m.
        • Here (2022 census): 90% owner-occupied (council 71%); 2% of homes empty (council 5%); most built 1971–1980; 66% drive to work (council 61%); population up 12% since 2016.
        • The council decides in a median 61 days (about 9 weeks); 44% are asked for more information.
        • 11 applications nearby in the last 12 months.
        • 4 homes started within 1 km in 3 years (council middle 1).
        What the terms mean 5 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
        • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 30
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.026 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
        gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public26 Oct 2026
        www2.courts.ie—© the publisher25 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
        esbnetworks.ie—© the publisher · flag only11 Sept 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public26 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.026 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence26 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Sept 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 26 Oct 2026, 06:06 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.