Planning report · Dun Laoghaire-Rathdown County Council · 1000 m around the house · the last 12 months · 1 Nov 2026, 12:47

Suttonfield, Goldenball, Kiltiernan Domain

53.23673, -6.19786

Homes here mostly date from before 1919. Most home extensions nearby get approved (85%). A building site 616 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of SuttonfieldBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2025: 3 files on Suttonfield3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 5 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 1.0 km · floodinfo.ie
Within 1.0 kmCountFor example
Conservation areas1Moss Cottages, Enniskerry Road, Kiltiernan
Heritage inventory buildings20Saint Tiernan's Church (Kiltiernan); Firmount
Radon grid squares8
Protected buildings17Church of Ireland; Shaldon Grange
Monuments14Designed landscape - tree-ring; Megalithic tomb - portal tomb
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, OPW flood maps (NIFM), National Inventory of Architectural Heritage, Records of Protected Structures, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 71–92% by type. A new house in a garden is harder: 40% approved, and 1 in 5 is asked for more information.

Single-storey rear13 decided · more info asked 31%
92% · council 96%
Attic or dormer14 decided · more info asked 14%
71% · council 94%
New house in a garden or site10 decided · more info asked 20%
40% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 37 nearby, 2,642 council-wide

Figure 3

Suttonfield, file by file since 2025

1 of 3 decided extensions on the road were approved.

3 planning files on Suttonfield since 2025, by kind and decision.20252026Extensions, atticsNo. 8 · 2025 · attic conversion / dormer · refused · D25B/0145/WEBNo. 8 · 2025 · attic conversion / dormer · refused · D25B/0381/WEBNo. 58 · 2025 · attic conversion / dormer · approved · D25B/0580/WEBPorches, roofs, otherNew house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Suttonfield" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2025–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 3 is asked for more information, which adds about 100 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 3): 158 days; Appeal window: 4 weeks; If appealed: +176 days; Building starts: 116 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–55 (n=33)52 daysIf more info asked (1 in 3)With further information: median 158 days (n=15)158 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 176 days (n=15, all appeals within 1.5 km)+176 daysBuilding startsStart notice: median 116 days after permission (n=17)116 days after permissionSigned off53% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated48 decided home extensions, 17 start notices, 15 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    2 of 9 appealed refusals became permissions. 0 of 6 appealed approvals were reversed.

    Refusals appealed9 decided
    2 became permissions
    Approvals appealed6 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months

    1 of 1 changed the council's decision

    • 324349 Granted with conditions · A site measuring c. 3.27 Ha in the townland of Glenamuck North in… · 852 m
    • 501720 Pending · Stepaside Golf Centre, Jamestown Farm, Kilternan, Dublin 18, D18YT26 · 942 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Suttonfield, Goldenball, Kiltiernan Domain with 15 numbered planning items
    ⌖ the houseWindow closingBuilding site that stoppedApprovedNo decision yetOther
    1. 122, The Drive D26B/0467/WEBApproved · 300 m
    2. 2Glenamuck Road, Kilternan ABP-3061601-9Building site that stopped · 616 m
    3. 32 No. sites, measuring c. 14.2 Ha. LRD26A/0552/WEBApproved · 192 m
    4. 4Circle K, Kilternan Service Station D25A/0890/WEBApproved · 333 m
    5. 5National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area PC/IC/01/26No decision yet · 348 m
    6. 6rear of 186, Golden Ball Cottages D26A/0367/WEBApproved · 400 m
    7. 732, Bishops Gate D26B/0343/WEBApproved · 514 m
    8. 86, Rockville Avenue D26B/0181/WEBApproved · 546 m
    9. 968, Bishops Gate REF6526Section 5: exempt · 579 m
    10. 1010 Chapel Hill, Glebe Road D26B/0262/WEBApproved · 610 m
    11. 114, Moss Cottages D25A/0845/WEBApproved · 643 m
    12. 123, Moss Cottages D26A/0330/WEBApproved · 652 m
    13. 13Mount Eden, Ballycorus Road D26B/0250/WEBApproved · 654 m
    14. 14Glenamuck Manor, Glenamuck Road South LRD26A/0352/WEBApproved · 689 m
    15. 15Church Cottage / Sexton's Lodge (A Protected Structure), Enniskerry Road D26A/0024/WEBApproved · 693 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 31 permissions since 2016, 12 show a start notice and 4 have a completion certificate.

    53 applications lodged within 500 m. Council: 32 approved, 10 refused. After appeals: 31 approved. Of those: 4 signed off, 5 built with the owner's opt-out, 3 started, 19 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT32: lodged → approved10: lodged → refused10: lodged → withdrawn or invalid1: lodged → undecided31: approved → approved9: refused → refused10: withdrawn or invalid → withdrawn1: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, withdrawn or invalid after an appeal19: approved → no start notice found5: approved → built, owner opted out3: approved → started, not signed off4: approved → signed off53 lodged53 lodged32 approved32 approved10 refused10 refused10 withdrawn or invalid10 withdrawn or invalid1 undecided1 undecided31 approved31 approved9 refused9 refused12 withdrawn12 withdrawn1 undecided1 undecided19 no start notice found19 no start notice found5 built, owner opted out5 built, owner opted out3 started, not signed off3 started, not signed off4 signed off4 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured53 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 1.0 km; the first closes 6 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-06 D26B/0467/WEB: GRANT PERMISSION — alterations to the existing attic space to facilitate the installation of an at; 2026-11-13 ACP 324349: Grant Permissions with Conditionstoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecD26B/0467/WEB: GRANT PERMISSION — alterations to the existing attic space to facilitate the installation of an at · 300 m away · 2026-11-06ACP 324349: Grant Permissions with Conditions · 852 m away · 2026-11-13
    Time to appeal endsHigh Court window ends
    • Time to appeal ends 6 Nov 20265 days left
      1D26B/0467/WEB · GRANT PERMISSION — alterations to the existing attic space to facilitate the installation of an at
      €220 to An Coimisiún Pleanála (€110 observer) · 300 m away
    • Time to ask the High Court for a review ends 13 Nov 202612 days left
      Grant Permissions with Conditions
      852 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    1 building site nearby stopped before sign-off.

    Glenamuck Road, Kilternan · 27 homes: 27 homes, started Nov 2022, never signed off2022202320242025202620272028Glenamuck Road, Kilternan · 27 homes616 m · ABP-3061601-927 homes, started Nov 2022, never signed off27 homes, started Nov 2022, never signed offtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 1.0 km

    Building site that stopped 1

    • 2Glenamuck Road, Kilternan · 27 homes, started Nov 2022, never signed off · 616 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 4 and 15 a year; busiest 2024. 76% of decisions were approvals.

    2021: 7, 2022: 4, 2023: 9, 2024: 15, 2025: 13, 2026: 5051015202021: 7 approved7’21*2022: 2 approved2022: 2 refused4’222023: 7 approved2023: 2 refused9’232024: 6 approved2024: 3 refused2024: 6 withdrawn or invalid15’242025: 7 approved2025: 3 refused2025: 3 withdrawn or invalid13’252026: 3 approved2026: 1 withdrawn or invalid2026: 1 undecided5’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 1.0 km 23 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 10 in the last 12 months
    7 not signed off3 no sign-off needed
    • Ballycorus Road, Kilternan, Dublin, D18HY74 · 9 Nov 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0250/WEB · 668 m
    • Enniskerry Road, Kilternan, Dublin · 21 Sept 2026 · 8 homes · 7-day notice not signed off · LRD24A/0597 · 222 m
    • Enniskerry Road, Kilternan, Dublin · 21 Sept 2026 · 8 homes · 7-day notice not signed off · LRD24A/0597 · 232 m
    • Ballycorus Road, Kilternan, Dublin · 1 Sept 2026 · 100 homes · 7-day notice not signed off · LRD24A/0597 · 616 m
    • 7 Rockville Court, Dublin 18, Dublin · 20 Jul 2026 · 59 homes · start notice not signed off · LRD24A/0597 · 391 m
    • Enniskerry Road, Kilternan, Dublin · 10 Jun 2026 · 28 homes · start notice not signed off · D25A/0827/WEB · 561 m
    • Enniskerry Road, Kilternan, South Dublin · 5 May 2026 · 28 homes · 7-day notice not signed off · D25A/0827/WEB · 564 m
    • Enniskerry Road, Kilternan, Dún Laoghaire-Rathdown · 25 Mar 2026 · 7-day notice not signed off · 251 m
    • 58 Suttonfield Paddocks, Kilternan, Dublin, D18 WN6V · 6 Mar 2026 · 1 homes · short notice no sign-off needed · D25B/0580/WEB · 180 m
    • The Gate Lodge, Ballybetagh Road, Kilternan, Dún Laoghaire-Rathdown, D18 HW18 · 3 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · D23A/0527 · 200 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 0 not started
    • Chapel Hill, Glebe Road, Kilternan, Co. Dublin (Phase 1) · Completed · 4 homes · 478 m
    • Cookstown Lane, Ballybetagh Road, Kilternan, Co Dublin (Phase 1)* · Completed · 22 homes · 478 m
    • Dun Oir Grove, Glenamuck Road, Kiltiernan, Dublin 18 (Phase 1)* · Completed · 49 homes · 478 m
    • Glenamuck Manor, Kilternan, Dublin 18 (Phase 1)* · Completed · 28 homes · 478 m
    • Kilternan Close · Completed · 33 homes · 478 m
    • Willow House, Kiltiernan Wood, Bishop’s Gate, Enniskerry Road, Kiltiernan, Dublin 18 (formerly Willow House, Bishop’s Gate, Kiltiernan, Enniskerry Road, Dublin 18) (Phase 1)* · Completed · 22 homes · 478 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Suttons Fields114114 built (2025-Q4)0 m
    Wayside——192 m
    Wayside, Enniskerry Road9823 built · 75 being built (2026-Q2)193 m
    Kilternan Large-Scale Residential Development487487 not started (2026-Q2)193 m
    Lands immediately adjoining Bishop's Gate housing developmen——205 m
    Lands North of The Bridge36no activity on site reported (2026-Q2)435 m
    Rockville Phase 2B2812 built · 16 being built (2026-Q2)501 m
    Rockhurst28no activity on site reported (2026-Q2)514 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Play and Learn Childcare and Education · Crèche16 Feb 2026 · report · Tusla Early Years Inspectorate782 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here515
    Council middle44
    Homes started
    Here466
    Council middle86
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    89% owner-occupied (council 68%).

    Homes built before 1971
    38% · council 38%
    Homes built since 2001
    19% · council 25%
    Owner-occupied
    89% · council 68%
    Rented
    4% · council 29%
    Children under 15
    16% · council 18%
    Aged 65 and over
    21% · council 17%
    Households with 2+ cars
    66% · council 39%
    Work mainly from home
    15% · council 19%
    This small area (424 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267092001/01

    Bus
    202 m
    Wayside Cottages · 44, L26 · busiest stop within 500 m: 3 an hour at peak
    Radon
    1 in 5
    homes here likely high (EPA). Test it
    Flood
    Within 1.0 km
    OPW flood map area, not beside the house
    Nearest school
    165 m
    Our Lady of the Wayside NS, 292 pupils
    Homes sold nearby
    76
    in 3 years, 64 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Our Lady of the Wayside NS · primary · 292 pupils · 165 m
    • Kilternan Church Of Ireland Ns · primary · 206 pupils · 691 m

    Stops 10

    • Wayside Cottages · 44, L26 · 3/hour at peak · 202 m
    • Golden Ball · 44, L26 · 3/hour at peak · 282 m
    • Kilternan Village · 118, 44, L26 · 3/hour at peak · 288 m
    • Golden Ball · 118, 44, L26 · 3/hour at peak · 299 m
    • Kilternan Village · 44, L26 · 1/hour at peak · 314 m
    • Cromlech Close · L26 · 2/hour at peak · 361 m
    • Kilternan NS · 118, 44 · 1/hour at peak · 651 m
    • Kilternan NS · 44 · 1/hour at peak · 702 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Our Lady of the Wayside NS · 165 m-2% pupils (292)
    • Kilternan Church Of Ireland Ns · 691 m-1% pupils (206)

    Council meetings 3 items

    Public land

    • Dublin and Dun Laoghaire Education and Training Board · 0.12 ha · 245 m
    • Dún Laoghaire-Rathdown County Council · 0.19 ha · 880 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. High radon area (1 in 5 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Kiltiernan Domain
    Electoral division
    Glencullen
    Electoral area
    Glencullen-Sandyford
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
    • 1 site nearby could change: 1 stalled build.
    • Kilternan Village (bus 118, 44) 288 m away: 3 an hour at morning peak; 16 from all stops within 500 m.
    • Here (2022 census): 89% owner-occupied (council 68%); 5% of homes empty (council 6%); most built before 1919; 59% drive to work (council 43%); population up 19% since 2016.
    • Around here the council decides in a median 53 days (about 8 weeks); 1 in 6 is asked for more information.
    • Homes started within 1 km: 131 in the last year, 219 three years before.
    • 23 applications nearby in the last 12 months; 88% approved (council 87%); 26% for work already built (council 11%).
    • 2 building jobs started within 250 m in the last six months.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 12:47 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.