PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 1000 m around the house · the last 12 months · 1 Nov 2026, 05:30

Lehaunstown, Cherrywood

53.24670, -6.15249

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (95%). 343 homes approved 361 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of LaughanstownBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 13 files on Laughanstown2022: 13 files on Laughanstown2023: 12 files on Laughanstown2024: 8 files on Laughanstown2025: 5 files on Laughanstown2026: 9 files on Laughanstown60 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
Yes
Protected or listed · inside the zone around a recorded monument (DU026-023020-)
No
Vacant land tax · not on the map
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Protected building1 within 100 m Cross
Monument zoneOn this site Cross-inscribed stone, Laughanstown; Graveslab, Laughanstown
Radon1 in 5 homes have high radon (EPA)

Not on this site: heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNearby OPW map area within 1.0 km · floodinfo.ie
Within 1.0 kmCountFor example
Heritage inventory buildings6Glendruid; post box
Radon grid squares13
Protected buildings6Brennanstown House; Glendruid
Monuments55Cross-inscribed stone; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 25 on the draft 2027 map; 24 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Sites and Monuments Record, SMR zones of notification, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), OPW flood maps (NIFM), National Inventory of Architectural Heritage · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–93% by type.

Single-storey rear13 decided · more info asked 15%
92% · council 96%
Attic or dormer14 decided · more info asked 14%
93% · council 94%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 27 nearby, 2,292 council-wide

Figure 3

Laughanstown, file by file since 2021

1 of 1 decided extensions on the road were approved.

60 planning files on Laughanstown since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 4 · 2026 · attic conversion / dormer · withdrawn or invalid · DZ26B/0153/WEBNo. 4 · 2026 · attic conversion / dormer · approved · DZ26B/0186/WEBPorches, roofs, otherNo number · 2021 · other work · approved · DZ21A/0334No number · 2021 · other work · approved · DZ21A/0414No number · 2021 · other work · approved · DZ21A/0569No number · 2021 · other work · approved · DZ21A/0699No. 01 · 2021 · other work · approved · DZ21A/0713No number · 2021 · other work · approved · DZ21A/0806No. 03 · 2021 · other work · approved · DZ21A/0807No number · 2021 · other work · approved · DZ21A/0932No number · 2021 · other work · approved · DZ21A/1017No number · 2021 · other work · approved · DZ21A/1042No. 8 · 2021 · other work · approved · DZ21A/1069No number · 2021 · other work · approved · DZ21A/1085No number · 2021 · other work · approved · PC/CSDZ/005/2021No number · 2022 · other work · approved · DZ22A/0093No number · 2022 · other work · approved · DZ22A/0133No. 17 · 2022 · other work · approved · DZ22A/0138No number · 2022 · other work · withdrawn or invalid · DZ22A/0403No number · 2022 · other work · approved · DZ22A/0550No. 8 · 2022 · other work · approved · DZ22A/0623No number · 2022 · other work · approved · DZ22A/0690No number · 2022 · other work · approved · DZ22A/0729No number · 2022 · other work · approved · DZ22A/0747No. 8 · 2022 · other work · approved · DZ22A/0770No number · 2022 · other work · approved · DZ22A/0820No. 03 · 2022 · other work · approved · DZ22A/0846No. 3 · 2022 · other work · approved · DZ22A/1021No number · 2023 · other work · approved · DZ23A/0005No number · 2023 · other work · approved · DZ23A/0028No number · 2023 · other work · approved · DZ23A/0106No number · 2023 · other work · withdrawn or invalid · DZ23A/0120No number · 2023 · other work · withdrawn or invalid · DZ23A/0354No. 03 · 2023 · other work · approved · DZ23A/0423No number · 2023 · other work · approved · DZ23A/0443No. 8 · 2023 · other work · approved · DZ23A/0455No number · 2023 · other work · approved · DZ23A/0468No. 03 · 2023 · other work · approved · DZ23A/0573No number · 2023 · other work · withdrawn or invalid · DZ23A/0811No number · 2023 · other work · approved · DZ23A/0812No number · 2024 · other work · approved · DZ24A/0017No number · 2024 · other extension · withdrawn or invalid · DZ24A/0236/WEBNo number · 2024 · other work · approved · DZ24A/0291/WEBNo number · 2024 · other work · withdrawn or invalid · DZ24A/0686/WEBNo number · 2024 · other work · approved · DZ24A/0696/WEBNo number · 2024 · other work · withdrawn or invalid · DZ24A/1016/WEBNo number · 2024 · other work · approved · DZ24A/1024/WEBNo number · 2024 · other work · approved · DZ24A/1030/WEBNo number · 2025 · other work · withdrawn or invalid · DZ25A/0008/WEBNo number · 2025 · other work · approved · DZ25A/0014/WEBNo number · 2025 · other work · approved · DZ25A/0102/WEBNo number · 2025 · other work · approved · DZ25A/0161/WEBNo number · 2025 · other work · approved · DZ25A/0325/WEBNo number · 2026 · other work · approved · DZ26A/0052/WEBNo number · 2026 · other work · approved · DZ26A/0148/WEBNo number · 2026 · other work · approved · DZ26A/0151/WEBNo number · 2026 · other work · approved · DZ26A/0177/WEBNo number · 2026 · other work · approved · DZ26A/0252/WEBNo number · 2026 · other work · undecided · DZ26A/0579/WEBNo number · 2026 · other work · undecided · DZ26A/0580/WEBNew house in a side garden
ApprovedRefusedWithdrawn or invalid

60 files with "Laughanstown" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

2 approved3 no decision or withdrawn
KindAppliedApprovedRefused
Rear52—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days. 1 in 4 is asked for more information, which adds about 92 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 4): 145 days; Appeal window: 4 weeks; If appealed: +150 days; Building starts: 118 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 49–54 (n=47)51 daysIf more info asked (1 in 4)With further information: median 145 days (n=15)145 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 150 days (n=16, all appeals within 1.5 km)+150 daysBuilding startsStart notice: median 118 days after permission (n=24)118 days after permissionSigned off42% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated62 decided home extensions, 24 start notices, 16 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    3 of 9 appealed refusals became permissions. 1 of 7 appealed approvals were reversed.

    Refusals appealed9 decided
    3 became permissions
    Approvals appealed7 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 4 in the last 12 months

    None of 1 changed the council's decision

    • 324194 Granted with conditions · Cherrywood, West Courtyard, Cabinteely, Dublin 18 · 424 m
    • 324502 Pending · Cabinteely Village, North of Loughlinstown and west of Ballybrack · 314 m
    • 324503 Pending · Lands at TC3 Cherrywood · 569 m
    • 500992 Granted · Lands Adjoining, St. Laurence College, Wyattville Park,… · 877 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Lehaunstown, Cherrywood with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedBuilding site that stoppedEmpty land zoned for homesApproved
    1. 1Units B and C, Tully Village Parade DZ26A/0755/WEBNo decision yet · 418 m
    2. 21A, Willow Avenue D26B/0034/WEBApproved · 729 m
    3. 3Laughanstown DZ24A/0291/WEBApproved, no sign building has started · 232 m
    4. 4Domville Crescent, cherrywood DZ21A/0806Building site that stopped · 247 m
    5. 5Laughanstown Residential Scheme DZ26A/0148/WEBApproved, no sign building has started · 360 m
    6. 6Brennanstown and Laughanstown DZ26A/0252/WEBApproved, no sign building has started · 361 m
    7. 7Development Area 7 - Macnebury DZ22A/1021Approved, no sign building has started · 482 m
    8. 8Lands Adjoining D25A/0150/WEBApproved, no sign building has started · 996 m
    9. 94.6 ha zoned for homesEmpty land zoned for homes · 118 m
    10. 101.7 ha zoned for homesEmpty land zoned for homes · 153 m
    11. 112.5 ha zoned for homesEmpty land zoned for homes · 201 m
    12. 121.9 ha zoned for homesEmpty land zoned for homes · 203 m
    13. 130.6 ha zoned for homesEmpty land zoned for homes · 245 m
    14. 1410 Domville Square, Cherrywood DZ26B/0366/WEBApproved · 175 m
    15. 1517 Domville Court, Cherrywood DZ26B/0241/WEBApproved · 240 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 54 permissions since 2016, 23 show a start notice and 14 have a completion certificate.

    75 applications lodged within 500 m. Council: 55 approved, 1 refused. After appeals: 54 approved. Of those: 14 signed off, 1 built with the owner's opt-out, 8 started, 31 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT55: lodged → approved1: lodged → refused15: lodged → withdrawn or invalid4: lodged → undecided54: approved → approved1: refused → refused15: withdrawn or invalid → withdrawn4: undecided → undecided1 approved by the council, undecided after an appeal31: approved → no start notice found1: approved → built, owner opted out8: approved → started, not signed off14: approved → signed off75 lodged75 lodged55 approved55 approved1 refused1 refused15 withdrawn or invalid15 withdrawn or invalid4 undecided4 undecided54 approved54 approved1 refused1 refused15 withdrawn15 withdrawn5 undecided5 undecided31 no start notice found31 no start notice found1 built, owner opted out1 built, owner opted out8 started, not signed off8 started, not signed off14 signed off14 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured75 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    3 deadlines within 1.0 km; the first closes 3 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-03 D26B/0034/WEB: GRANT PERMISSION FOR RETENTION — 1) The Retention Of The Raised Ground Levels At Rear Of House For Open Amenity S; 2026-11-12 DZ26A/0755/WEB: application received — The development will consist of amalgamation of 2no. permitted retail units (Un; 2026-11-18 ACP 324194: Allow appeal delete conditionstoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecD26B/0034/WEB: GRANT PERMISSION FOR RETENTION — 1) The Retention Of The Raised Ground Levels At Rear Of House For Open Amenity S · 729 m away · 2026-11-03DZ26A/0755/WEB: application received — The development will consist of amalgamation of 2no. permitted retail units (Un · 418 m away · 2026-11-12ACP 324194: Allow appeal delete conditions · 424 m away · 2026-11-18
    Comments closeTime to appeal endsHigh Court window ends
    • Time to appeal ends 3 Nov 20262 days left
      2D26B/0034/WEB · GRANT PERMISSION FOR RETENTION — 1) The Retention Of The Raised Ground Levels At Rear Of House For Open Amenity S
      €220 to An Coimisiún Pleanála (€110 observer) · 729 m away
    • Comments close 12 Nov 202611 days left
      1DZ26A/0755/WEB · application received — The development will consist of amalgamation of 2no. permitted retail units (Un
      €20 to the council · 418 m away
    • Time to ask the High Court for a review ends 18 Nov 202617 days left
      Allow appeal delete conditions
      424 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    343 homes 361 m away were approved Oct 2026 with no start notice yet; the permission runs to Oct 2031. 1 building site nearby stopped before sign-off. Luas Green Line extension (DLR) is planned 839 m away.

    Brennanstown and… · 343 homes: 343 homes approved Oct 2026, not started; Laughanstown Residential… · 311 homes: 311 homes approved Jul 2026, not started; Development Area 7 -… · 283 homes: 283 homes approved Jun 2023, not started; Lands Adjoining · 119 homes: 119 homes approved Jul 2026, not started; Luas Green Line extension…: proposed (DLR County Development Plan 2022-2028); BusConnects Core Bus…: core bus corridor (DLR County Development Plan 2022-2028)2023202420252026202720282029203020312032Brennanstown and… · 343 homes361 m · DZ26A/0252/WEB343 homes approved Oct 2026, not started343 homes approved Oct 2026, not startedLaughanstown Residential… · 311 homes360 m · DZ26A/0148/WEB311 homes approved Jul 2026, not started311 homes approved Jul 2026, not startedDevelopment Area 7 -… · 283 homes482 m · DZ22A/1021283 homes approved Jun 2023, not started283 homes approved Jun 2023, not startedLands Adjoining · 119 homes996 m · D25A/0150/WEB119 homes approved Jul 2026, not started119 homes approved Jul 2026, not startedLuas Green Line extension…839 m · plannedproposed (DLR County Development Plan 2022-2028)BusConnects Core Bus…847 m · plannedcore bus corridor (DLR County Development Plan 2022-2028)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 15 within 1.0 km

    Building site that stopped 1

    Approved, not started 5

    Empty land zoned for homes 9

    • 94.6 ha zoned for homes · no homes built on it yet · 118 m
    • 101.7 ha zoned for homes · no homes built on it yet · 153 m
    • 112.5 ha zoned for homes · no homes built on it yet · 201 m
    • 121.9 ha zoned for homes · no homes built on it yet · 203 m
    • 130.6 ha zoned for homes · no homes built on it yet · 245 m
    • 1.0 ha zoned for homes · no homes built on it yet · 298 m
    • 1.6 ha zoned for homes · no homes built on it yet · 312 m
    • 0.9 ha zoned for homes · no homes built on it yet · 314 m
    • 1.8 ha zoned for homes · no homes built on it yet · 345 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 8 and 15 a year; busiest 2022. 98% of decisions were approvals.

    2021: 14, 2022: 15, 2023: 12, 2024: 8, 2025: 8, 2026: 18051015202021: 14 approved14’21*2022: 12 approved2022: 1 refused2022: 2 withdrawn or invalid15’222023: 9 approved2023: 3 withdrawn or invalid12’232024: 5 approved2024: 3 withdrawn or invalid8’242025: 6 approved2025: 2 withdrawn or invalid8’252026: 9 approved2026: 5 withdrawn or invalid2026: 4 undecided18’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 1.0 km 28 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 9 in the last 12 months
    2 signed off as finished5 not signed off2 no sign-off needed
    • 39 Mercer Manor, Dublin, D18 YN9P · 16 Nov 2026 · 7-day notice not signed off · DZ22A/0770 · 428 m
    • 24 Beech Park, Dublin 18, Dublin, D18 RRY7 · 23 Sept 2026 · 1 homes · short notice no sign-off needed · D26B/0301 · 945 m
    • 39 Beech Park, Dublin 18, Dublin · 3 Jul 2026 · 289 homes · start notice not signed off · DZ25A/0515/WEB · 871 m
    • 1 Tully Green, Dublin 18, Dublin · 29 May 2026 · 7-day notice signed off · 206 m
    • Cherrywood Road, Dublin 18, Dún Laoghaire-Rathdown · 11 May 2026 · 200 homes · 7-day notice not signed off · DZ24A/0017 · 960 m
    • Unit A, 2nd Floor, Building 3, The Campus, Cherrywood Business Park, Dublin 18., Dublin, Dún Laoghaire-Rathdown, D18 TF72 · 18 Mar 2026 · 7-day notice signed off · 914 m
    • Cherrywood Avenue, Cherrywood, Dún Laoghaire-Rathdown · 17 Feb 2026 · 67 homes · 7-day notice not signed off · DZ22A/0681 · 891 m
    • 1 Castle Lane, Dublin, Dún Laoghaire-Rathdown · 4 Dec 2025 · start notice not signed off · DZ23A/0028 · 528 m
    • Laughlanstown, Dublin 18, Dún Laoghaire-Rathdown, 00000 · 14 Nov 2025 · 1 homes · short notice no sign-off needed · DZ21A/0932 & DZ24A/1030/WEB · 154 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 1,156 not started
    • Bishop Street, Cherrywood, Co. Dublin (TC5 Site) · Stage 4 tender approval · 205 homes · 795 m
    • Block G, Domville Crescent, Cherrywood, Dublin 18 (Phase 1)* · Completed · 30 homes · 795 m
    • Castle House, Castle Way, Cherrywood, Dublin 18 (Phase 1) · Completed · 47 homes · 795 m
    • Cherrywood Town Centre, Dublin 18 (Phase 1)* · Completed · 80 homes · 795 m
    • Cherrywood Town Centre, Dublin 18 (Phase 2)* · Completed · 61 homes · 795 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Laughanstown and Cherrywood162162 not started (2026-Q2)0 m
    Lehaunstown and Cherrywood358184 built · 16 being built · 158 not started (2026-Q2)103 m
    Domville Site322—103 m
    Laughanstown——103 m
    townland of——119 m
    Laughanstown and Brennanstown——146 m
    Laughanstown & Brennanstown——146 m
    Lands of Laughanstown25— (2025-Q3)146 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    The Park Academy Childcare Cherrywood · Crèche26 Feb 2024 · report · Tusla Early Years Inspectorate519 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here1,039
    Council middle44
    Homes started
    Here1,096
    Council middle85
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    0% of homes built before 1971 (council 38%). 48% owner-occupied (council 68%).

    Homes built before 1971
    0% · council 38%
    Homes built since 2001
    98% · council 25%
    Owner-occupied
    48% · council 68%
    Rented
    50% · council 29%
    Children under 15
    22% · council 18%
    Aged 65 and over
    3% · council 17%
    Households with 2+ cars
    23% · council 39%
    Work mainly from home
    17% · council 19%
    This small area (312 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267038010

    Rail noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    271 m
    Bishop Street · L14 · busiest stop within 500 m: 15 an hour at peak
    Planned
    839 m
    Luas Green Line extension (DLR), Proposed Luas Line Extension
    Radon
    1 in 5
    homes here likely high (EPA). Test it
    Flood
    Within 1.0 km
    OPW flood map area, not beside the house
    Nearest school
    185 m
    Cherrywood Educate Together National School, 220 pupils
    Homes sold nearby
    270
    in 3 years, 203 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Cherrywood Educate Together National School · primary · 220 pupils · 185 m
    • Blackrock Educate Together Secondary School · postprimary · 236 pupils · 197 m

    Stops 25

    • Bishop Street · L14 · 2/hour at peak · 271 m
    • Bishop Street · L14 · 2/hour at peak · 289 m
    • Lehaunstown Lane · L14 · 2/hour at peak · 315 m
    • Lehaunstown Lane · L14 · 2/hour at peak · 336 m
    • Cherrywood Luas · L14 · 2/hour at peak · 381 m
    • Cherrywood Luas · L14 · 2/hour at peak · 421 m
    • Castle Way · L14 · 2/hour at peak · 447 m
    • Cherrywood · Green · 14/hour at peak · 461 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Cherrywood Educate Together National School · 185 m+32.5% pupils (220)
    • Blackrock Educate Together Secondary School · 197 m+27.6% pupils (236)

    Council meetings 6 items

    Public land

    • The Office of Public Works · 0.14 ha · 0 m
    • Dún Laoghaire-Rathdown County Council · 0.37 ha · 100 m
    • The Minister for Education and Skills · 0.75 ha · 176 m
    • Railway Procurement Agency · 0.25 ha · 275 m
    • Railway Procurement Agency · 0.5 ha · 276 m
    • Dún Laoghaire-Rathdown County Council · 3.67 ha · 417 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    2. High radon area (1 in 5 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    3. 100 homes approved 232 m away (Laughanstown), not started: what is planned?
      Ask for: The planning file for DZ24A/0291/WEB.
      Council
    4. Stalled build 247 m away (Domville Crescent, cherrywood): what happens next?
      Ask for: The planning file for DZ21A/0806.
      Council
    5. Application 418 m away open for comments until 12 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Laughanstown
    Electoral division
    Cabinteely-Loughlinstown
    Electoral area
    Killiney-Shankill
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Monument zone; no vacant land tax; high radon area.
    • 15 sites nearby could change: 1 stalled build, 5 approved schemes, 9 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 12 Nov 2026.
    • 1,156 homes approved nearby, not started; largest 343 at Brennanstown and Laughanstown.
    • Laughanstown (Luas Green) 468 m away: 15 an hour at morning peak; 74 from all stops within 500 m. Planned: Luas Green Line extension (DLR) 839 m away, proposed (DLR County Development Plan 2022-2028).
    • Noise from rail mapped at 60–64 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 50% rent (council 28%); 4% of homes empty (council 6%); most built 2001–2010; 42% drive to work (council 43%); population up 25% since 2016.
    • 5 home extensions within 250 m since 2026. Most were rear extensions.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 34
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 05:30 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.