Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 m
Count
For example
Natural heritage areas
1
Grand Canal
Heritage inventory buildings
13
Creole; S. Hughes
Monuments
2
Castle - tower house; R148156
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Nothing on this site restricts it: not protected, not in a conservation area.
Figure 2
What happened to applications like yours
Extensions are almost always approved here: 85–100% by type. A new house in a garden is harder: 67% approved, and 1 in 2 are asked for more information.
0%50%100%
Single-storey rear23 decided · more info asked 9%
100% · council 98%
Two-storey rear13 decided · more info asked 46%
85% · council 94%
Single-storey side12 decided · more info asked 0%
100% · council 98%
Attic or dormer26 decided · more info asked 35%
88% · council 87%
First-floor10 decided · more info asked 20%
100% · council 93%
Garage conversion10 decided · more info asked 20%
100% · council 95%
New house in a garden or site12 decided · more info asked 58%
67% · council 57%
Approved nearbyKildare overall
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 106 nearby, 5,156 council-wide
Figure 3
Sallins, file by file since 2017
54 of 58 decided extensions on the road were approved. New houses in side gardens or on sites: 4 of 4.
ApprovedRefusedWithdrawn or invalid
98 files with "Sallins" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2017–2026
Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m
Extensions and refusals near you 1 extensions within 250 m · the last 12 months
1 approved
Kind
Applied
Approved
Refused
Two-storey rear
1
1
—
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Permission isn't building. Of 63 permissions since 2016, 8 show a start notice and 1 has a completion certificate. Most owners opt out of sign-off.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured67 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
Figure 7
The next 30 days
Nothing closes within 500 m in the next 30 days.
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Figure 8
Applications within 500 m, by year
Between 4 and 12 a year; busiest 2018. 94% of decisions were approvals.
ApprovedRefusedWithdrawn or invalidUndecided
2017 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Every application within 500 m 3 in the last 12 months
to construct a new two storey extension at the side and rear of our existing dwelling to include on ground…
25612549 Feb 2026209 m
How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: npad, acp, bcms · fetched 12 Oct 2026, 01:44
81 Sallins Park, Sallins, Kildare, W91 R5P3 · 9 May 2026 · 1 homes · start notice, opted out no sign-off needed · 25/61254 · 219 m
134 Sallins Bridge, Sallins, Kildare, W91 X2Y9 · 5 May 2026 · 1 homes · short notice no sign-off needed · 25/60719 · 260 m
173 Sallins Park, Sallins, Kildare, W91 ED79 · 16 Apr 2026 · short notice no sign-off needed · 21/889 · 450 m
160 Sallins Bridge, Sallins, Kildare · 23 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 24/60183 · 422 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
How busy is this area Busier than most of Kildare County Council.
Homes approved
Here29
Council middle0
Homes started
Here146
Council middle2
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)
CC BY 4.0
—
—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)
CC BY 4.0
—
—
EPA strategic noise maps
CC BY 4.0
—
—
Fingal County Council
CC BY 4.0
—
—
Question 6
What to ask, and who
Attic or dormer (211232) approved 2021, not started: still planned?
Ask for: The grant, and whether it stays with the house.
Seller · solicitor
Attic or dormer (18391) ran out unbuilt in 2023: built anyway?
Ask for: If built: proof it started in time, and an opinion of compliance.
Seller · solicitor
Any work done without planning permission?
Ask for: An opinion of compliance for the whole house.
Seller · solicitor
Reference
Where this is, the terms, the sources
Townland
Sallins
Electoral division
Bodenstown
Electoral area
Naas
Council
Kildare County Council
Everything we found, as a list 8 lines
5 applications on this site; latest 211232, approved 2021, not started, runs out 2026.
Not protected; no vacant land tax.
Nothing nearby looks set to change.
No morning-peak service within 500 m; nearest is Sallins, 505 m away (1 an hour).
Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
Here (2022 census): 56% owner-occupied (council 71%); 4% of homes empty (council 5%); most built 2016 or later; 55% drive to work (council 61%); population up 3% since 2016.
1 home extension within 250 m since 2025.
Around here the council decides in a median 55 days (about 8 weeks); 38% are asked for more information.
What the terms mean 6 terms
Vacant land tax(Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
Building started(Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
Signed off as finished(Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
Approved(Grant of permission): The council said yes, usually with conditions.
Approval ran out without being built(Permission lapsed / expired): Most permissions last five years.
What the land is zoned for(Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 27
Source
Publisher
Licence
Fetched
EPA strategic noise maps
—
CC BY 4.0
—
Fingal County Council
—
CC BY 4.0
—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)