Planning report · Galway City Council · 500 m around the house · the last 12 months · 22 Oct 2026, 13:51

Upper Salthill Road

53.25845, -9.10568

Homes here mostly date from the 2000s. 4 planning files on this house, the latest from 2024. Home extensions nearby almost always get approved (96%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Galway City Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 4 planning files on this house, the latest from 2025.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 4 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2025: 2460261 · garden room, approved2023: 2360006 · garden room, approved2021: 21128 · new house, refused2020: 19377 · new house, approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    2460261 · garden room · approved 2025 · not started, runs out 2030
    approvedstartedsigned off
  2. 2023
    2360006 · garden room · approved 2023 · started, no sign-off needed
    approvedstartedsigned off?
  3. 2021
    21128 · new house · refused 2021
    approvedstarted?signed off?
  4. 2020
    19377 · new house · approved 2020 · ran out unbuilt
    approvedstartedsigned off
On this site
R3
Zoning · Rural cluster
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR3 · Rural cluster
What it says

Residential R2: To provide for low-density residential development which will ensure the protection of existing residential amenity and environmental sensitivities

A small rural settlement where only modest infill serving local need is envisaged.

galway city development plan 2023 2029 · 4 Jan 2023 – 4 Jan 2029

ZoningR3 · Rural cluster
What it says

Residential R2: To provide for low-density residential development which will ensure the protection of existing residential amenity and environmental sensitivities

A small rural settlement where only modest infill serving local need is envisaged.

galway city development plan 2023 2029 variations 1 2 3 · 4 Jan 2023 – 4 Jan 2029

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Monuments7Water mill - horizontal-wheeled; Designed landscape feature
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 16 on the draft 2027 map; 16 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 22 Oct 2026, 02:28
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–100% by type. A new house in a garden is harder: 80% approved, and 1 in 3 is asked for more information.

Single-storey rear32 decided · more info asked 0%
100% · council 94%
Two-storey rear14 decided · more info asked 14%
93% · council 94%
Single-storey side10 decided · more info asked 20%
100% · council 100%
Attic or dormer25 decided · more info asked 8%
96% · council 89%
First-floor15 decided · more info asked 13%
93% · council 90%
New house in a garden or site45 decided · more info asked 29%
80% · council 85%
Approved nearbyGalway overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 141 nearby, 923 council-wide

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 approved
KindAppliedApprovedRefused
First-floor11—
Other11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 22 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 22 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
    National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 52 days. 1 in 8 is asked for more information, which adds about 100 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 8): 152 days; Appeal window: 4 weeks; Building starts: 159 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 48–55 (n=148)52 daysIf more info asked (1 in 8)With further information: median 152 days (n=20)152 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 159 days after permission (n=55)159 days after permissionSigned off381 days after the start, for the few who file. 62% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated168 decided home extensions, 55 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    7 of 11 appealed refusals became permissions. 4 of 33 appealed approvals were reversed.

    Refusals appealed11 decided
    7 became permissions
    Approvals appealed33 decided
    4 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 502196 Open · Acres (T.d.) , La Rochelle Knocknacarra Road , Galway · 249 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 22 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher21 Oct 2026, 01:40open
    National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
    Question 4

    What's changing around you?

    Street map around Upper Salthill Road with 15 numbered planning items
    ⌖ the houseOpen for commentsEmpty land zoned for homesApprovedRefused
    1. 1Saint Joseph's, Shangort Knocknacarra 2660349No decision yet · 329 m
    2. 20.7 ha zoned for homesEmpty land zoned for homes · 32 m
    3. 314.0 ha zoned for homesEmpty land zoned for homes · 41 m
    4. 40.4 ha zoned for homesEmpty land zoned for homes · 64 m
    5. 51.7 ha zoned for homesEmpty land zoned for homes · 142 m
    6. 65.7 ha zoned for homesEmpty land zoned for homes · 222 m
    7. 70.2 ha zoned for homesEmpty land zoned for homes · 238 m
    8. 8The Four Winds Lodge Gentian Hill, Salthill 2560334Approved with conditions · 67 m
    9. 92 3 & 4 Knocknacarra, (R336) Salthill Galway 2660041Approved with conditions · 138 m
    10. 1017 Carragh Close, Knocknacarra Road 2660103Approved with conditions · 249 m
    11. 11Acres (T.d.), La Rochelle Knocknacarra Road 2660266Approved with conditions · 249 m
    12. 12No.6 Carragh Drive, Knocknacarra Road 2660171Approved with conditions · 263 m
    13. 136 Carragh Grove, Knocknacarra 2660209Approved with conditions · 318 m
    14. 14Claremont Lodge, Salthill 2660182Refused · 322 m
    15. 15Seacote, Shangort 2660240Approved with conditions · 329 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 68 permissions since 2016, 20 show a start notice and 5 have a completion certificate. Most owners opt out of sign-off.

    75 applications lodged within 500 m. Council: 65 approved, 10 refused. After appeals: 68 approved. Of those: 5 signed off, 12 built with the owner's opt-out, 3 started, 30 with no start notice found, 18 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT65: lodged → approved10: lodged → refused65: approved → approved7: refused → refused3 refused by the council, approved after an appeal30: approved → no start notice found12: approved → built, owner opted out3: approved → started, not signed off5: approved → signed off18: approved → ran out75 lodged75 lodged65 approved65 approved10 refused10 refused68 approved68 approved7 refused7 refused30 no start notice found30 no start notice found12 built, owner opted out12 built, owner opted out3 started, not signed off3 started, not signed off5 signed off5 signed off18 ran out18 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured75 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 30 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-30 2660349: application received — Permission for development which consists of: Full planning permission for alteration of previously approved extension atoday27 Oct1 Nov6 Nov11 Nov16 Nov21 Nov2660349: application received — Permission for development which consists of: Full planning permission for alteration of previously approved extension a · 329 m away · 2026-10-30
    Comments close
    • Comments close 30 Oct 20268 days left
      12660349 · application received — Permission for development which consists of: Full planning permission for alteration of…
      €20 to the council · 329 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 10 within 500 m

    Empty land zoned for homes 10

    • 20.7 ha zoned for homes · no homes built on it yet · 32 m
    • 314.0 ha zoned for homes · no homes built on it yet · 41 m
    • 40.4 ha zoned for homes · no homes built on it yet · 64 m
    • 51.7 ha zoned for homes · no homes built on it yet · 142 m
    • 65.7 ha zoned for homes · no homes built on it yet · 222 m
    • 70.2 ha zoned for homes · no homes built on it yet · 238 m
    • 1.5 ha zoned for homes · no homes built on it yet · 329 m
    • 1.6 ha zoned for homes · no homes built on it yet · 336 m
    • 0.6 ha zoned for homes · no homes built on it yet · 410 m
    • 0.4 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 22 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 7

    Applications within 500 m, by year

    Between 3 and 12 a year; busiest 2021. 87% of decisions were approvals.

    2017: 5, 2018: 6, 2019: 8, 2020: 8, 2021: 12, 2022: 3, 2023: 3, 2024: 12, 2025: 10, 2026: 8051015202017: 5 approved5’17*2018: 5 approved2018: 1 refused6’182019: 8 approved8’192020: 7 approved2020: 1 refused8’202021: 11 approved2021: 1 refused12’212022: 2 approved2022: 1 refused3’222023: 2 approved2023: 1 refused3’232024: 10 approved2024: 2 refused12’242025: 9 approved2025: 1 refused10’252026: 6 approved2026: 2 refused8’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 12 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 22 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
    Building work nearby 3 in the last 12 months
    1 not signed off2 no sign-off needed
    • Cashelmara, Galway · 30 Jun 2026 · 1 homes · short notice no sign-off needed · 2460121 · 279 m
    • Ballyburke, Knocknacarra, Galway · 18 Mar 2026 · 84 homes · 7-day notice not signed off · PART VIII APPLICATION LA 01-24 · 425 m
    • Knocknacarra Road, Galway, H91PP8E · 16 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 2560092 · 358 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 22 Oct 2026, 02:10
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Rascals Day Nursery & Montessori · Crèche15 Apr 2026 · report · Tusla Early Years Inspectorate523 m
    Jack & Jill Montessori School · Crèche4 Jun 2026 · report · Tusla Early Years Inspectorate789 m
    Little Flower Montessori · Crèche8 Apr 2025 · report · Tusla Early Years Inspectorate951 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Galway City Council.
    Homes approved
    Here0
    Council middle5
    Homes started
    Here175
    Council middle15
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 22 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
    National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    57% owner-occupied (council 46%).

    Homes built before 1971
    11% · council 17%
    Homes built since 2001
    51% · council 31%
    Owner-occupied
    57% · council 46%
    Rented
    40% · council 47%
    Children under 15
    7% · council 15%
    Aged 65 and over
    30% · council 13%
    Households with 2+ cars
    40% · council 29%
    Work mainly from home
    13% · council 11%
    This small area (210 people)Galway

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 068008001

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    116 m
    Gentian Hill · 402 · busiest stop within 500 m: 2 an hour at peak
    Schools, stops and the council

    Schools

    None nearby.

      Stops 22

      • Gentian Hill · 402 · 2/hour at peak · 116 m
      • Cashelmara · 525 · 0/hour at peak · 224 m
      • Knocknacarra Rd · 402, 410 · 2/hour at peak · 275 m
      • Knocknacarra Rd · 410 · 1/hour at peak · 309 m
      • Seanghort · 402 · 2/hour at peak · 363 m
      • Brooklawn · 402, 410 · 2/hour at peak · 497 m
      • Prc Cnc na Cathrach · 410, 411, 412 · 3/hour at peak · 508 m
      • Arda an Chlaí Bháin · 410, 411, 412 · 5/hour at peak · 515 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 22 Oct 2026, 02:38
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Council consultation portalsPublic22 Oct 2026, 01:44open
      Council meetings (ModernGov)Public22 Oct 2026, 02:38open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Garden room (2460261) approved 2025, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      2. Garden room (2360006) built without official sign-off: built properly?
        Ask for: An engineer's opinion of compliance.
        Seller · solicitor
      3. New house (21128) refused 2021: built anyway?
        Ask for: The seller's answer and your surveyor's check.
        Seller · solicitor
      4. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      5. Application 329 m away open for comments until 30 Oct 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      6. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Knocknacarragh
      Electoral area
      Galway City West
      Council
      Galway City Council
      Everything we found, as a list 8 lines
      • 4 applications on this site; latest 2460261, approved 2025, not started, runs out 2030.
      • Zoned R3 (rural cluster); not protected; on the vacant land tax map.
      • 10 sites nearby could change: 10 empty zoned plots.
      • 1 application open for comments nearby; nearest closes 30 Oct 2026.
      • Knocknacarra Rd (bus 402, 410) 275 m away: 2 an hour at morning peak; 10 from all stops within 500 m.
      • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 57% owner-occupied (council 46%); 16% of homes empty (council 10%); most built 2001–2010; 49% drive to work (council 47%).
      • 2 home extensions within 250 m since 2025.
      What the terms mean 8 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 25
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.022 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public22 Oct 2026
      www2.courts.ie—© the publisher21 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public22 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.022 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence22 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 22 Oct 2026, 13:51 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.