PlanningRegister.ie
Planning report · Galway County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 23:49

24 Ash Haven

53.26211, -8.93592

Homes here mostly date from the 2000s. 1 planning file on this house, the latest from 2025. Most home extensions nearby get approved (89%).

See on the mapWatch this area

Not held yet for Galway County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 7 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 1 planning file on this house, the latest from 2025.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Oran MoreBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2025: 2560407 · extension, approved2021: 3 files on Oran More2022: 5 files on Oran More2023: 3 files on Oran More2024: 5 files on Oran More2025: 4 files on Oran More2026: 2 files on Oran More22 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    2560407 · extension · approved 2025 · not started, runs out 2030
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
Yes
Protected or listed · inside the zone around a recorded monument (GA095-113----)
Yes
Vacant land tax · 3% of land value a year
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Residential Existing: To protect and improve residential amenities of existing residential areas

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

galway county development plan 2022 2028 · 20 Jun 2022 – 19 Jun 2028

Monument zoneOn this site Enclosure, Oran More

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Monuments5Ritual site - holy well; Designed landscape - tree-ring
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 25 on the draft 2027 map; 25 on the final 2026 map.
Sources: Development plan zoning (councils), Sites and Monuments Record, SMR zones of notification, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 83% approved, and 1 in 6 is asked for more information.

Single-storey rear11 decided · more info asked 9%
100% · council 94%
Attic or dormer13 decided · more info asked 8%
100% · council 92%
New house in a garden or site18 decided · more info asked 17%
83% · council 79%
Approved nearbyGalway overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 42 nearby, 3,661 council-wide

Figure 3

Oran More, file by file since 2021

9 of 9 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

22 planning files on Oran More since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · attic conversion / dormer · approved · 21102No number · 2021 · attic conversion / dormer · approved · 211565No number · 2021 · other extension · approved · 21813No number · 2022 · attic conversion / dormer · approved · 2260917No number · 2022 · attic conversion / dormer · approved · 2261182No number · 2023 · side · approved · 2320No number · 2023 · attic conversion / dormer · approved · 2361270No number · 2025 · single-storey rear · approved · 2560407No number · 2026 · other extension · approved · 2660094Porches, roofs, otherNo number · 2022 · other work · approved · 22392No number · 2022 · other work · approved · 22398No number · 2022 · other work · approved · 2261277No. 33 · 2023 · other work · approved · 23128No number · 2024 · other work · approved · 2460186No number · 2024 · other work · approved · 2460366No number · 2024 · other work · refused · 2460840No. 4 · 2024 · garage conversion · approved · 2461589No. 34 · 2025 · other work · approved · 2560556No. 34 · 2025 · other work · approved · 2561249No. 24 · 2025 · new house · refused · 2561692No. 24 · 2026 · attic conversion / dormer · approved · 2660556New house in a side gardenNo number · 2024 · new house · approved · 2461616
ApprovedRefusedWithdrawn or invalid

22 files with "Oran More" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days. 1 in 7 is asked for more information, which adds about 86 days. Building starts about 7 months after permission.

    Comments open: 5 weeks · €20; Council decision: 54 days; If more info asked (1 in 7): 140 days; Appeal window: 4 weeks; Building starts: 218 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 51–60 (n=47)54 daysIf more info asked (1 in 7)With further information: median 140 days (n=8)140 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 218 days after permission (n=15)218 days after permissionSigned off60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated55 decided home extensions, 15 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    6 of 8 appealed refusals became permissions. 0 of 4 appealed approvals were reversed.

    Refusals appealed8 decided
    6 became permissions
    Approvals appealed4 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around 24 Ash Haven with 8 numbered planning items
    ⌖ the houseEmpty land zoned for homesApproved
    1. 11.4 ha zoned for homesEmpty land zoned for homes · 16 m
    2. 20.2 ha zoned for homesEmpty land zoned for homes · 57 m
    3. 31.7 ha zoned for homesEmpty land zoned for homes · 80 m
    4. 40.9 ha zoned for homesEmpty land zoned for homes · 85 m
    5. 51.5 ha zoned for homesEmpty land zoned for homes · 109 m
    6. 60.6 ha zoned for homesEmpty land zoned for homes · 133 m
    7. 7Oranhill, 24 beech grove 2660556Approved with conditions · 352 m
    8. 8Moneyduff, Orancourt Oranhill Maree Road 2660094Approved with conditions · 366 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 20 permissions since 2016, 6 show a start notice and 1 has a completion certificate. Most owners opt out of sign-off.

    22 applications lodged within 500 m. Council: 20 approved, 2 refused. After appeals: 20 approved. Of those: 1 signed off, 4 built with the owner's opt-out, 1 started, 12 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT20: lodged → approved2: lodged → refused20: approved → approved2: refused → refused12: approved → no start notice found4: approved → built, owner opted out1: approved → started, not signed off1: approved → signed off2: approved → ran out22 lodged22 lodged20 approved20 approved2 refused2 refused20 approved20 approved2 refused2 refused12 no start notice found12 no start notice found4 built, owner opted out4 built, owner opted out1 started, not signed off1 started, not signed off1 signed off1 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured22 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 10 within 500 m

      Empty land zoned for homes 10

      • 11.4 ha zoned for homes · no homes built on it yet · 16 m
      • 20.2 ha zoned for homes · no homes built on it yet · 57 m
      • 31.7 ha zoned for homes · no homes built on it yet · 80 m
      • 40.9 ha zoned for homes · no homes built on it yet · 85 m
      • 51.5 ha zoned for homes · no homes built on it yet · 109 m
      • 60.6 ha zoned for homes · no homes built on it yet · 133 m
      • 0.8 ha zoned for homes · no homes built on it yet · 158 m
      • 0.9 ha zoned for homes · no homes built on it yet · 162 m
      • 1.1 ha zoned for homes · no homes built on it yet · 165 m
      • 4.1 ha zoned for homes · no homes built on it yet · 0 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 3 and 5 a year; busiest 2022. 91% of decisions were approvals.

      2021: 5, 2022: 5, 2023: 3, 2024: 3, 2025: 4, 2026: 205102021: 5 approved5’21*2022: 5 approved5’222023: 3 approved3’232024: 2 approved2024: 1 refused3’242025: 3 approved2025: 1 refused4’252026: 2 approved2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 3 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Building work nearby 2 in the last 12 months
      2 no sign-off needed
      • 24 Beech Grove, Oranmore, Galway · 8 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · 2660556 · 370 m
      • 1 Maree Road, Oranmore, Galway, H91 E19V · 23 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 211566 · 283 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Ash Haven · 3 applications in 10 years · most common: attic conversion / dormer

      Crèches and schools inspected

      NameLatest inspectionDistance
      Bluebells & Buttercups Creche · Crèche4 Sept 2025 · report · Tusla Early Years Inspectorate160 m
      Oranmore Pre- School · Crèche16 Apr 2024 · report · Tusla Early Years Inspectorate731 m
      Abacus Montessori & Creche · Crèche28 Aug 2024 · report · Tusla Early Years Inspectorate822 m
      Blath Beag Creche · Crèche16 May 2024 · report · Tusla Early Years Inspectorate887 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
      SourceLicenceFetchedLink
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Galway County Council.
      Homes approved
      Here68
      Council middle0
      Homes started
      Here331
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      2% of homes built before 1971 (council 23%). 83% owner-occupied (council 75%).

      Homes built before 1971
      2% · council 23%
      Homes built since 2001
      87% · council 39%
      Owner-occupied
      83% · council 75%
      Rented
      16% · council 18%
      Children under 15
      31% · council 21%
      Aged 65 and over
      8% · council 17%
      Households with 2+ cars
      64% · council 52%
      Work mainly from home
      20% · council 11%
      This small area (337 people)Galway

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 067184006

      Bus
      642 m
      Oranmore Centre · 404
      Nearest school
      458 m
      Gaelscoil de hIde, 399 pupils
      Schools, stops and the council

      Schools

      • Gaelscoil de hIde · primary · 399 pupils · 458 m
      • Calasanctius College · postprimary · 906 pupils · 635 m
      • Scoil Íosa · primary · 770 pupils · 643 m

      Stops 1

      • Oranmore Centre · 404 · 2/hour at peak · 642 m

      Schools growing or shrinking planning in 3 years · pupils last year

      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Council consultation portalsPublic31 Oct 2026, 01:06open
      Council meetings (ModernGov)Public31 Oct 2026, 02:21open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Extension (2560407) approved 2025, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      2. Next to a recorded monument: does digging need notice?
        Ask for: Details of past works from the seller.
        Seller · council
      3. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Oran More
      Electoral division
      Oranmore
      Electoral area
      Athenry-Oranmore
      Council
      Galway County Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest 2560407, approved 2025, not started, runs out 2030.
      • Zoned R2 (existing residential); monument zone; on the vacant land tax map.
      • 10 sites nearby could change: 10 empty zoned plots.
      • No morning-peak service within 500 m; nearest is Oranmore Centre, 642 m away (2 an hour).
      • Here (2022 census): 83% owner-occupied (council 75%); 3% of homes empty (council 16%); most built 2001–2010; 68% drive to work (council 66%); population up 10% since 2016.
      • Around here the council decides in a median 54 days (about 8 weeks); 1 in 5 is asked for more information.
      • Homes started within 1 km: 8 in the last year, 230 three years before.
      • 3 applications nearby in the last 12 months.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 31 Oct 2026, 23:49 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.