Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 09:38

Sandyford Hall Green

53.26409, -6.21506

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (90%). 438 homes approved 348 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
M3
Zoning · Neighbourhood centre
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningM3 · Neighbourhood centre
What it says

Objective NC: NC To protect, provide for and-or improve mixed-use neighbourhood centre facilities.

A local centre: shops, services and apartments over them, serving the surrounding housing.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningM3 · Neighbourhood centre
What it says

Objective NC: NC To protect, provide for and-or improve mixed-use neighbourhood centre facilities.

A local centre: shops, services and apartments over them, serving the surrounding housing.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 5 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Sleever International Limited (874 m)

Vacant land taxNo not on the map
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Heritage inventory buildings7Glencairn; Lisieux Hall
Radon grid squares6
Protected buildings7Glencairn House; Lisieux Hall (Park Cottage)
Monuments6Designed landscape - tree-ring; Burnt mound
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), National Inventory of Architectural Heritage, Records of Protected Structures, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 83–92% by type. A new house in a garden is harder: 67% approved, and 1 in 2 is asked for more information.

Single-storey rear31 decided · more info asked 13%
84% · council 96%
Single-storey side12 decided · more info asked 8%
83% · council 96%
Attic or dormer137 decided · more info asked 13%
92% · council 94%
New house in a garden or site12 decided · more info asked 42%
67% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 192 nearby, 2,790 council-wide

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

3 approved
KindAppliedApprovedRefused
Dormer or attic22—
Porch11—

On Sandyford Hall: 17 extensions in 10 years, 92% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 51 days. 1 in 5 is asked for more information, which adds about 91 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 5): 142 days; Appeal window: 4 weeks; If appealed: +120 days; Building starts: 147 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 49–54 (n=190)51 daysIf more info asked (1 in 5)With further information: median 142 days (n=44)142 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 120 days (n=40, all appeals within 1.5 km)+120 daysBuilding startsStart notice: median 147 days after permission (n=79)147 days after permissionSigned off38% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated234 decided home extensions, 81 start notices, 40 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    4 of 11 appealed refusals became permissions. 2 of 30 appealed approvals were reversed.

    Refusals appealed11 decided
    4 became permissions
    Approvals appealed30 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months

    None of 2 changed the council's decision

    • 501272 Granted · 19, Atkinson Drive, Belmont, Stepaside, Dublin 18, D18VP92 · 447 m report
    • 324263 Pending · Lands adjacent to Riverside Cottage, Kilgobbin Road, Stepaside,… · 392 m
    • 500655 Split · 24, Ferncarrig Avenue, Ferncarrig, Kilgobbin, Dublin 18, D18E2Y1 · 186 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Sandyford Hall Green with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedRefusedAppealBuilding startedNo decision yetApproved
    1. 13, Glencairn View D26B/0526No decision yet · 451 m
    2. 2Meadowfield House, Meadowfield D26A/0611/WEBApproved · 412 m
    3. 31.19 Ha. At Lisieux Park LRD23A/0718Approved, no sign building has started · 197 m
    4. 4Murphystown Road D24A/0717Approved, no sign building has started · 241 m
    5. 5Aiken's Village, Townland of Woodside and Kilgobbin ABP-314546Approved, not started · 348 m
    6. 6Murphystown Road, Sandyford D26A/0112/WEBRefused · 152 m
    7. 724, Ferncarrig Avenue 500655Appeal: partly approved · 186 m
    8. 812 Sandyford Hall Court, Sandyford D25B/0447/WEBBuilding started · 176 m
    9. 9National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area PC/IC/01/26No decision yet · 55 m
    10. 1019, Ferncarrig Rise D26B/0089/WEBApproved · 178 m
    11. 1149, Sandyford Hall Crescent D26B/0310/WEBApproved · 212 m
    12. 128, Sandyford Hall Walk D25A/0865/WEBApproved · 215 m
    13. 1321 Ferncarrig Avenue, Ferncarrig D26B/0335/WEBApproved · 277 m
    14. 14Crystal Haven, 22 Sandyford Hall Drive D26B/0055/WEBApproved · 351 m
    15. 1513, Thornberry Close D25B/0660/WEBApproved · 383 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 93 permissions since 2016, 35 show a start notice and 2 have a completion certificate.

    125 applications lodged within 500 m. Council: 97 approved, 11 refused. After appeals: 93 approved. Of those: 2 signed off, 11 built with the owner's opt-out, 22 started, 57 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT97: lodged → approved11: lodged → refused14: lodged → withdrawn or invalid3: lodged → undecided93: approved → approved11: refused → refused14: withdrawn or invalid → withdrawn3: undecided → undecided1 approved by the council, undecided after an appeal3 approved by the council, withdrawn or invalid after an appeal57: approved → no start notice found11: approved → built, owner opted out22: approved → started, not signed off2: approved → signed off1: approved → ran out125 lodged125 lodged97 approved97 approved11 refused11 refused14 withdrawn or invalid14 withdrawn or invalid3 undecided3 undecided93 approved93 approved11 refused11 refused17 withdrawn17 withdrawn4 undecided4 undecided57 no start notice found57 no start notice found11 built, owner opted out11 built, owner opted out22 started, not signed off22 started, not signed off2 signed off2 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured125 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    2 deadlines within 500 m; the first closes 4 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-04 D26A/0611/WEB: GRANT PERMISSION — The development will consist of the following principal elements:1) construction; 2026-11-06 D26B/0526: application received — First floor dormer extensions on both the east and west side elevations to accomtoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecD26A/0611/WEB: GRANT PERMISSION — The development will consist of the following principal elements:1) construction · 412 m away · 2026-11-04D26B/0526: application received — First floor dormer extensions on both the east and west side elevations to accom · 451 m away · 2026-11-06
    Comments closeTime to appeal ends
    • Time to appeal ends 4 Nov 20263 days left
      2D26A/0611/WEB · GRANT PERMISSION — The development will consist of the following principal elements:1) construction
      €220 to An Coimisiún Pleanála (€110 observer) · 412 m away
    • Comments close 6 Nov 20265 days left
      1D26B/0526 · application received — First floor dormer extensions on both the east and west side elevations to accom
      €20 to the council · 451 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    438 homes 348 m away were approved Oct 2023 with no start notice yet; the permission runs to Oct 2028.

    Aiken's Village, Townland… · 438 homes: 438 homes approved Oct 2023, not started; 1.19 Ha. At Lisieux Park · 200 homes: 200 homes approved Apr 2024, not started; Murphystown Road · 18 homes: 18 homes approved Jun 2025, not started202320242025202620272028202920302031Aiken's Village, Townland… · 438 homes348 m · ABP-314546438 homes approved Oct 2023, not started438 homes approved Oct 2023, not started1.19 Ha. At Lisieux Park · 200 homes197 m · LRD23A/0718200 homes approved Apr 2024, not started200 homes approved Apr 2024, not startedMurphystown Road · 18 homes241 m · D24A/071718 homes approved Jun 2025, not started18 homes approved Jun 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 3 within 500 m

    Approved, not started 3

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 12 and 29 a year; busiest 2025. 90% of decisions were approvals.

    2021: 24, 2022: 12, 2023: 22, 2024: 21, 2025: 29, 2026: 1701020302021: 20 approved2021: 1 refused2021: 2 withdrawn or invalid2021: 1 undecided24’21*2022: 9 approved2022: 3 refused12’222023: 18 approved2023: 2 refused2023: 2 withdrawn or invalid22’232024: 17 approved2024: 2 refused2024: 2 withdrawn or invalid21’242025: 23 approved2025: 1 refused2025: 5 withdrawn or invalid29’252026: 10 approved2026: 2 refused2026: 3 withdrawn or invalid2026: 2 undecided17’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 22 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 15 in the last 12 months
    1 signed off as finished6 not signed off8 no sign-off needed
    • 21 Ferncarrig Avenue, Dublin 18, Dublin, D18 A2N8 · 11 Nov 2026 · short notice no sign-off needed · D26B/0335/WEB · 292 m
    • Cluain Shee, Dublin 18, Dublin · 11 Nov 2026 · start notice not signed off · D25A/0955/WEB · 433 m
    • Ridgefield, Aikens Village, Stepaside, Dublin 18, Dublin · 3 Nov 2026 · 209 homes · 7-day notice not signed off · LRD25A/0641/WEB · 452 m
    • Ridgefield, Aikens Village, Stepaside, Dublin 18, Dublin · 3 Nov 2026 · 209 homes · 7-day notice not signed off · LRD25A/0641/WEB · 454 m
    • Ridgefield, Aikens Village, Stepaside, Co. Dublin, Dublin 18, Dublin · 26 Oct 2026 · 209 homes · 7-day notice not signed off · LRD25A/0641/WEB · 344 m
    • Ridgefield, Aikens Village, Stepaside, Dublin 18, Dublin · 19 Oct 2026 · 209 homes · 7-day notice not signed off · LRD25A/0641/WEB · 349 m
    • 4 Hyde Road, Dublin 18, Dublin, D18 W5Y2 · 12 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0215/WEB · 398 m
    • 13 Thornberry Close, Dublin 18, Dublin, D18 X5P1 · 21 Sept 2026 · short notice no sign-off needed · D25B/0660/WEB · 388 m
    • 9 Glencairn Road, Dublin, D18 E8W7 · 19 Aug 2026 · short notice no sign-off needed · D25B/0321/WEB · 389 m
    • 22 Sandyford Hall Drive, Dublin 18, Dublin, D18 E4E6 · 18 Aug 2026 · 1 homes · start notice signed off · D26B/0055/WEB · 366 m
    • Murphystown Road, Dublin 18, Dublin, D18 FD88 · 10 Aug 2026 · 7-day notice not signed off · D25A/0598/WEB · 221 m
    • 812 Sandyford Hall Court, Sandyford, Dún Laoghaire-Rathdown, D18 DP70 · 7 May 2026 · short notice no sign-off needed · D25B/0447/WEB · 176 m
    • 9 Sandyford Hall Close, Sandyford, Dún Laoghaire-Rathdown, D18 Y9Y4 · 6 Feb 2026 · 1 homes · short notice no sign-off needed · D25B/0294/WEB · 423 m
    • 25 Ferncarrig Avenue, Sandyford, Dún Laoghaire-Rathdown, D18 R2W6 · 26 Jan 2026 · short notice no sign-off needed · D25B/0347/WEB · 198 m
    • 2 Glencairn Garth, Dublin, Dún Laoghaire-Rathdown, D18 X7P3 · 3 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D24A/0434/WEB · 411 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 656 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Sandyford Hall · 28 applications in 10 years · 92% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    1.19 Ha. At Lisieux Park——132 m
    Lisieux Hall——132 m
    Lisieux Park——132 m
    Sector 3——220 m
    Oldtown House89no activity on site reported (2025-Q3)376 m
    Riverside Cottage4343 not started (2025-Q2)392 m
    Glencairn352352 built (2025-Q2)408 m
    Belmont Drive and Village Road4646 not started (2026-Q2)488 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Kid's Biz · Crèche28 Oct 2025 · report · Tusla Early Years Inspectorate4 m
    Roola Boola Creche & Montessori · Crèche19 Feb 2026 · report · Tusla Early Years Inspectorate219 m
    Roola Boola Creche & Montessori · Crèche6 Aug 2025 · report · Tusla Early Years Inspectorate221 m
    Park Montessori School · Crèche6 Nov 2025 · report · Tusla Early Years Inspectorate357 m
    Giant Steps · Crèche22 Jan 2025 · report · Tusla Early Years Inspectorate438 m
    Naionra Thaobh na Coille · Crèche8 Jan 2026 · report · Tusla Early Years Inspectorate473 m
    Giraffe Childcare Stepaside · Crèche5 Jun 2025 · report · Tusla Early Years Inspectorate582 m
    Cedar Montessori School · Crèche10 Dec 2025 · report · Tusla Early Years Inspectorate644 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here418
    Council middle44
    Homes started
    Here609
    Council middle107
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    2% of homes built before 1971 (council 38%). 87% owner-occupied (council 68%).

    Homes built before 1971
    2% · council 38%
    Homes built since 2001
    8% · council 25%
    Owner-occupied
    87% · council 68%
    Rented
    12% · council 29%
    Children under 15
    21% · council 18%
    Aged 65 and over
    2% · council 17%
    Households with 2+ cars
    60% · council 39%
    Work mainly from home
    20% · council 19%
    This small area (439 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267092043

    Bus
    147 m
    Sandyford Hall · 44, 46n · busiest stop within 500 m: 14 an hour at peak
    Radon
    1 in 5
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    449 m
    Stepaside Educate Together National School, 542 pupils
    Homes sold nearby
    80
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Stepaside Educate Together National School · primary · 542 pupils · 449 m
    • Gaelscoil Thaobh na Coille · primary · 402 pupils · 505 m
    • St Michaels Hse Spec Sc · primary · 68 pupils · 826 m
    • St. Mary's National School · primary · 242 pupils · 963 m

    Stops 27

    • Sandyford Hall · 44, 46n · 1/hour at peak · 147 m
    • Sandyford Hall · 44 · 1/hour at peak · 188 m
    • Mount Eagle Way · 44 · 1/hour at peak · 240 m
    • Kilgobbin Heights · 44, 46n · 1/hour at peak · 261 m
    • Ballyogan Road · 118, 44, 47 · 3/hour at peak · 307 m
    • Ballyogan Road · 44, 47 · 2/hour at peak · 329 m
    • Glencairn Luas · 118, 47 · 2/hour at peak · 332 m
    • Glencairn Luas · 47 · 1/hour at peak · 352 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Stepaside Educate Together National School · 449 m+5.4% pupils (542)
    • Gaelscoil Thaobh na Coille · 505 m-1.7% pupils (402) · 2 classrooms 2024, approved
    • St Michaels Hse Spec Sc · 826 m0% pupils (68)
    • St. Mary's National School · 963 m-0.8% pupils (242) · 2 classrooms 2024, approved

    Council meetings 3 items

    Public land

    • Dún Laoghaire-Rathdown County Council · 0.53 ha · 220 m
    • Dublin City Council · 0.25 ha · 237 m
    • Railway Procurement Agency · 0.26 ha · 265 m
    • Railway Procurement Agency · 0.3 ha · 272 m
    • Dún Laoghaire-Rathdown County Council · 0.89 ha · 372 m
    • Railway Procurement Agency · 0.15 ha · 378 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. High radon area (1 in 5 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    2. 200 homes approved 197 m away (1.19 Ha. At Lisieux Park), not started: what is planned?
      Ask for: The planning file for LRD23A/0718.
      Council
    3. 18 homes approved 241 m away (Murphystown Road), not started: what is planned?
      Ask for: The planning file for D24A/0717.
      Council
    4. Application 451 m away open for comments until 6 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Murphystown
    Electoral division
    Glencullen
    Electoral area
    Glencullen-Sandyford
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned M3 (neighbourhood centre); not protected; no vacant land tax; high radon area.
    • 3 sites nearby could change: 3 approved schemes.
    • 1 application open for comments nearby; nearest closes 6 Nov 2026.
    • 656 homes approved nearby, not started; largest 438 at Aiken's Village, Townland of Woodside….
    • Glencairn (Luas Green) 412 m away: 14 an hour at morning peak; 42 from all stops within 500 m.
    • Here (2022 census): 87% owner-occupied (council 68%); 3% of homes empty (council 6%); most built 1991–2000; 50% drive to work (council 43%); population up 19% since 2016.
    • 3 home extensions within 250 m since 2025. Most were dormers or attic conversions. On Sandyford Hall: 17 in 10 years, 92% approved.
    • Around here the council decides in a median 53 days (about 8 weeks); 1 in 6 is asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 33
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 09:38 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.