Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 16 Oct 2026, 13:16

Old Bray Road

53.26558, -6.16057

Homes here mostly date from the 1980s. 1 planning file on this house, the latest from 2002. Home extensions nearby almost always get approved (96%). 10 homes approved 323 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992). 1 planning file on this house, the latest from 2002.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Old Bray RoadBuilt: most homes in this small area date from 1981–1990 (census estimate)most built2002: D02A/0819 · extension, approved2003: 3 files on Old Bray Road2004: 3 files on Old Bray Road2005: 2 files on Old Bray Road2006: 3 files on Old Bray Road2007: 2 files on Old Bray Road2008: 1 file on Old Bray Road2009: 2 files on Old Bray Road2014: 8 files on Old Bray Road2015: 2 files on Old Bray Road2016: 2 files on Old Bray Road2018: 1 file on Old Bray Road2019: 2 files on Old Bray Road2021: 1 file on Old Bray Road2022: 1 file on Old Bray Road2023: 3 files on Old Bray Road2024: 4 files on Old Bray Road2025: 2 files on Old Bray Road2026: 1 file on Old Bray Road43 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2002
    D02A/0819 · extension · approved 2002 · built? unknown
    approvedstarted?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Amgen Technology (Ireland) Unlimited Company (798 m); Becton Dickinson Insulin Syringe Limited (Irish Branch) and Becton Dickinson Penel Limited (Irish Branch) (913 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings3milestone/milepost; house
Radon grid squares4
Monuments2Castle - tower house; R149362
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 12 Oct 2026, 23:31
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.012 Oct 2026, 23:31open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–100% by type. A new house in a garden is harder: 80% approved, and 1 in 3 is asked for more information.

Single-storey rear117 decided · more info asked 11%
98% · council 96%
Two-storey rear33 decided · more info asked 12%
100% · council 90%
Two-storey side21 decided · more info asked 0%
95% · council 94%
Single-storey side23 decided · more info asked 17%
100% · council 96%
Attic or dormer181 decided · more info asked 14%
92% · council 92%
First-floor28 decided · more info asked 21%
96% · council 89%
Garage conversion41 decided · more info asked 2%
100% · council 99%
Porch or front15 decided · more info asked 0%
100% · council 98%
New house in a garden or site65 decided · more info asked 40%
80% · council 62%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 524 nearby, 6,622 council-wide

Figure 3

Old Bray Road, file by file since 2003

5 of 6 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 2.

43 planning files on Old Bray Road since 2003, by kind and decision.200320052007200920112013201520172019202120232025Extensions, atticsNo. 24 · 2007 · two-storey rear · refused · D07A/1003No. 9 · 2007 · garage conversion · approved · D07B/0665No. 3 · 2014 · rear · approved · D14B/0252No. 7 · 2014 · porch / front · approved · D14B/0264No. 24 · 2019 · two-storey side · approved · D19A/0812No number · 2026 · attic conversion / dormer · approved · D26A/0354/WEBPorches, roofs, otherNo number · 2003 · other work · withdrawn or invalid · D03A/0209No number · 2003 · other work · refused · D03A/0336No. 2 · 2003 · other work · approved · D03A/1229No number · 2004 · other work · approved · D04A/0078No number · 2004 · other work · refused · D04A/1093No number · 2004 · other work · refused · D04A/1285No. 6 · 2005 · other work · approved · D05A/0246No number · 2005 · other work · approved · D05A/0559No number · 2006 · other work · refused · D06A/1172No number · 2008 · other work · refused · D08A/0703No number · 2009 · other work · refused · D09A/0119No. 62 · 2009 · other work · refused · D09A/0295No. 96 · 2014 · other work · approved · D14A/0002No. 437 · 2014 · other work · refused · D14A/0286No number · 2014 · other work · approved · D14A/0559No number · 2014 · other work · approved · D14A/0583No number · 2014 · other work · withdrawn or invalid · D14A/0631No number · 2014 · other work · refused · D14A/0731No number · 2015 · other work · withdrawn or invalid · D15A/0318No. 437 · 2015 · other work · approved · D15A/0395No number · 2016 · other work · approved · D16A/0108No number · 2016 · other work · approved · D16A/0681No number · 2018 · rear · approved · D18A/0402No number · 2019 · other work · refused · ABP30622519No number · 2021 · other work · approved · ABP31213221No. 27A · 2022 · other work · refused · D22A/0204No. 10 · 2023 · other work · approved · D23A/0085No. 1 · 2023 · other work · approved · D23A/0248No. 27 · 2023 · other work · approved · D23B/0313No number · 2024 · other work · approved · D24A/0179No. 2 · 2024 · other work · approved · D24A/1020/WEBNo number · 2024 · other work · approved · LRD24A/0329No number · 2024 · other work · approved · PC/PKS/02A/24No number · 2025 · other work · approved · D25A/0651No. 5 · 2025 · other work · approved · D25A/0996/WEBNew house in a side gardenNo. 26 · 2006 · new house · refused · D06A/042326No. 26 · 2006 · new house · approved · D06A/0914
ApprovedRefusedWithdrawn or invalid

43 files with "Old Bray Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2003–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

2 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic11—
Other11—
Rear10—

On New Cornelscourt: 2 extensions in 10 years.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 8 is asked for more information, which adds about 70 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 8): 123 days; Appeal window: 4 weeks; If appealed: +126 days; Building starts: 137 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–54 (n=484)52 daysIf more info asked (1 in 8)With further information: median 123 days (n=73)123 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 126 days (n=100, all appeals within 1.5 km)+126 daysBuilding startsStart notice: median 137 days after permission (n=293)137 days after permissionSigned off464 days after the start, for the few who file. 61% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated557 decided home extensions, 294 start notices, 100 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    19 of 44 appealed refusals became permissions. 2 of 57 appealed approvals were reversed.

    Refusals appealed44 decided
    19 became permissions
    Approvals appealed57 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    None of 1 changed the council's decision

    • 500907 Granted with conditions · 1, Highland Grove, Cabinteely, Dublin 18, D18R9W2 · 456 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Courts Service legal diary (judicial reviews)© the publisher16 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 4

    What's changing around you?

    Street map around Old Bray Road with 15 numbered planning items
    ⌖ the houseWindow closingApproved, not startedBuilding startedOtherApproved
    1. 133, Cabinteely Way D26B/0437/WEBApproved · 385 m
    2. 21, Kerrymount Green D26A/0256/WEBApproved · 400 m
    3. 3No 3 Monaloe Crescent and garden of no 2 Monaloe Crescent D22A/0832Approved, no sign building has started · 323 m
    4. 41 Glen Walk, Dublin 18 D16A/0449/EBuilding started · 138 m
    5. 5Site to the side of 32, Glen Lawn Drive V/094/25Section 5: exempt · 97 m
    6. 64, Glen Walk D26B/0110/WEBApproved · 100 m
    7. 7Dunnes Stores Off Licence, UNIT 5 D25A/0996/WEBApproved · 117 m
    8. 822a, Monaloe Crescent REF12226Section 5: needs permission · 218 m
    9. 929, Vale View Lawn D25B/0662/WEBApproved · 244 m
    10. 1024, Vale View Avenue D26B/0107/WEBApproved · 266 m
    11. 11Site to the rear of no.2 Monaloe Crescent, Deansgrange D25A/0956/WEBApproved · 282 m
    12. 1233, Vale View Avenue D26B/0246/WEBApproved · 295 m
    13. 13“Gerfi” Old Bray Road, Cabinteely D26A/0354/WEBApproved · 366 m
    14. 1437, Cabinteely Way D25B/0587/WEBApproved · 404 m
    15. 151 Highland Grove, Cabinteely D21A/0297/EApproved · 456 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 108 permissions since 2016, 53 show a start notice and 1 has a completion certificate. Most owners opt out of sign-off.

    126 applications lodged within 500 m. Council: 109 approved, 12 refused. After appeals: 108 approved. Of those: 1 signed off, 37 built with the owner's opt-out, 15 started, 54 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT109: lodged → approved12: lodged → refused4: lodged → withdrawn or invalid1: lodged → undecided107: approved → approved11: refused → refused4: withdrawn or invalid → withdrawn1: undecided → undecided2 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal54: approved → no start notice found37: approved → built, owner opted out15: approved → started, not signed off1: approved → signed off1: approved → ran out126 lodged126 lodged109 approved109 approved12 refused12 refused4 withdrawn or invalid4 withdrawn or invalid1 undecided1 undecided108 approved108 approved11 refused11 refused6 withdrawn6 withdrawn1 undecided1 undecided54 no start notice found54 no start notice found37 built, owner opted out37 built, owner opted out15 started, not signed off15 started, not signed off1 signed off1 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured126 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 19 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-19 D26B/0437/WEB: GRANT PERMISSION — Demolition of an existing 12 sq.m single-storey attached garage to the north-we; 2026-11-03 D26A/0256/WEB: GRANT PERMISSION — Sub division of garden to form an additional house plot, construction of a two-stoday21 Oct26 Oct31 Oct5 Nov10 Nov15 NovD26B/0437/WEB: GRANT PERMISSION — Demolition of an existing 12 sq.m single-storey attached garage to the north-we · 385 m away · 2026-10-19D26A/0256/WEB: GRANT PERMISSION — Sub division of garden to form an additional house plot, construction of a two-s · 400 m away · 2026-11-03
    Time to appeal ends
    • Time to appeal ends 19 Oct 20263 days left
      1D26B/0437/WEB · GRANT PERMISSION — Demolition of an existing 12 sq.m single-storey attached garage to the north-we
      €220 to An Coimisiún Pleanála (€110 observer) · 385 m away
    • Time to appeal ends 3 Nov 202618 days left
      2D26A/0256/WEB · GRANT PERMISSION — Sub division of garden to form an additional house plot, construction of a two-s
      €220 to An Coimisiún Pleanála (€110 observer) · 400 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    10 homes 323 m away were approved May 2023 with no start notice yet; the permission runs to May 2028. BusConnects Core Bus Corridors is planned 137 m away.

    No 3 Monaloe Crescent and… · 10 homes: 10 homes approved May 2023, not started; BusConnects Core Bus…: core bus corridor (DLR County Development Plan 2022-2028)2023202420252026202720282029No 3 Monaloe Crescent and… · 10 homes323 m · D22A/083210 homes approved May 2023, not started10 homes approved May 2023, not startedBusConnects Core Bus…137 m · plannedcore bus corridor (DLR County Development Plan 2022-2028)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 500 m

    Approved, not started 1

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    Council meetings (ModernGov)Public16 Oct 2026, 01:42open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 9

    Applications within 500 m, by year

    Between 7 and 26 a year; busiest 2025. 90% of decisions were approvals.

    2016: 1, 2017: 15, 2018: 8, 2019: 9, 2020: 7, 2021: 16, 2022: 13, 2023: 10, 2024: 13, 2025: 26, 2026: 801020302016: 1 approved1’16*2017: 15 approved15’172018: 8 approved8’182019: 8 approved2019: 1 refused9’192020: 6 approved2020: 1 refused7’202021: 12 approved2021: 4 refused16’212022: 11 approved2022: 2 refused13’222023: 9 approved2023: 1 refused10’232024: 9 approved2024: 2 refused2024: 2 withdrawn or invalid13’242025: 23 approved2025: 1 refused2025: 2 withdrawn or invalid26’252026: 7 approved2026: 1 undecided8’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 19 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Building work nearby 13 in the last 12 months
    2 not signed off11 no sign-off needed
    • 41 Glen Walk, Dublin 18, Dublin, D18 X2Y4 · 28 Sept 2026 · start notice, opted out no sign-off needed · D16A/0449/E · 138 m
    • 37 Cabinteely Way, Dublin 18, Dublin, D18 W2A2 · 7 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0587/WEB · 419 m
    • 1 Highland Grove, Dublin 18, Dublin · 4 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0928/WEB · 479 m
    • 4 Cabinteely Close, Dublin, D18 W2Y9 · 23 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D21B/0597 · 338 m
    • 5 Monaloe Crescent, Blackrock, Dublin, A94 F8C0 · 7 Jul 2026 · 1 homes · short notice no sign-off needed · D25B/0192/WEB · 272 m
    • 29 Vale View Lawn, Cabinteely, Dublin 18, Dún Laoghaire-Rathdown, D18 R5F1 · 23 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0662/WEB · 255 m
    • 11 Vale View Lawn, Dublin, Dún Laoghaire-Rathdown · 28 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · D24A/0500/WEB · 250 m
    • Old Bray Road, Cornelscourt, Dún Laoghaire-Rathdown · 4 Feb 2026 · 7 homes · start notice not signed off · ABP-312132-21 & LRD24A/0329 · 419 m
    • Old Bray Road, Cornelscourt, Dún Laoghaire-Rathdown · 28 Jan 2026 · 344 homes · 7-day notice not signed off · ABP-312132-21 & LRD24A/0329 · 484 m
    • 24 Cabinteely Way, Cabinteely, Dún Laoghaire-Rathdown, D18 N8W9 · 31 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · D25B/0023 · 428 m
    • 14 Prospect Lawn, Cabinteely, South Dublin, D18 V8F5 · 3 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · D25B/0393/WEB · 407 m
    • 1 Killart, Cornelscourt, Cabinteely, Dún Laoghaire-Rathdown, D18P2W0 · 31 Oct 2025 · 1 homes · start notice, opted out no sign-off needed · D25B/0337/WEB · 250 m
    • 2 Highland Lawn, Cabinteely, Dún Laoghaire-Rathdown, D18 V4Y0 · 17 Oct 2025 · 1 homes · short notice no sign-off needed · D25B/0256/WEB · 442 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 16 Oct 2026, 00:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Homes coming 10 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: New Cornelscourt · 3 applications in 10 years

    Developments within 1.0 km

    SchemeHomesProgressDistance
    c. 3.3 ha——317 m
    Old Bray Road——388 m
    Cornelscourt Village——389 m
    The Mart, Old Bray Road and Mart Lane2020 not started (2026-Q2)628 m
    The Grove, Mart Lane21no activity on site reported (2026-Q2)706 m
    Old Bray Road and Brennanstown Road Development3410 built · 24 being built (2026-Q2)729 m
    Brennanstown Road——733 m
    Former Doyles Nursery and Benoni234—827 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    The Park Academy Cabinteely · Crèche1 Dec 2025 · report · Tusla Early Years Inspectorate239 m
    Lilliput · Crèche14 Apr 2026 · report · Tusla Early Years Inspectorate380 m
    Cocobee Childcare · Crèche28 Apr 2026 · report · Tusla Early Years Inspectorate675 m
    Little Maples Creche & Pre-school · Crèche7 Aug 2025 · report · Tusla Early Years Inspectorate815 m
    Lakelands Preschool · Crèche19 Jun 2025 · report · Tusla Early Years Inspectorate828 m
    Clonkeen Montessori School · Crèche23 Mar 2026 · report · Tusla Early Years Inspectorate946 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.012 Oct 2026, 23:02open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here49
    Council middle49
    Homes started
    Here458
    Council middle92
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    80% owner-occupied (council 68%).

    Homes built before 1971
    35% · council 38%
    Homes built since 2001
    6% · council 25%
    Owner-occupied
    80% · council 68%
    Rented
    13% · council 29%
    Children under 15
    22% · council 18%
    Aged 65 and over
    28% · council 17%
    Households with 2+ cars
    59% · council 39%
    Work mainly from home
    17% · council 19%
    This small area (389 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267088010

    Road noise
    45–49 dB
    day–night average (EPA 2022)
    Bus
    55 m
    Cornelscourt SC · 46n, L26, L27 · busiest stop within 500 m: 14 an hour at peak
    Planned
    137 m
    BusConnects Core Bus Corridors, City to Bray
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    460 m
    St Brigids Girls NS, 499 pupils
    Homes sold nearby
    39
    in 3 years, 12 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Brigids Girls NS · primary · 499 pupils · 460 m
    • Clonkeen College · postprimary · 635 pupils · 520 m
    • St Brigids Boys NS · primary · 406 pupils · 687 m

    Stops 36

    • Cornelscourt SC · 46n, L26, L27 · 4/hour at peak · 55 m
    • Old Bray Road · 46n, L26 · 2/hour at peak · 100 m
    • Old Bray Road · L26 · 2/hour at peak · 106 m
    • Glen Estate · L27 · 2/hour at peak · 142 m
    • Clonkeen Road · 133, 181, E1, X1, X2 · 14/hour at peak · 189 m
    • Clonkeen Road · 133, 181, E1, X1, X2 · 8/hour at peak · 196 m
    • Cornelscourt SC · 46n, L26, L27 · 4/hour at peak · 202 m
    • Monaloe Crescent · 84n, L26 · 2/hour at peak · 238 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Brigids Girls NS · 460 m-2% pupils (499)
    • Clonkeen College · 520 m+0.8% pupils (635)
    • St Brigids Boys NS · 687 m-0.7% pupils (406)

    Open consultations

    Council meetings 2 items

    Public land

    • Dublin City Council · 0.76 ha · 68 m
    • Dublin City Council · 1.34 ha · 107 m
    • Dún Laoghaire-Rathdown County Council · 2.41 ha · 135 m
    • Dublin City Council · 0.42 ha · 153 m
    • Dublin City Council · 0.11 ha · 160 m
    • Dublin City Council · 0.41 ha · 217 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Council consultation portalsPublic16 Oct 2026, 01:34open
    Council meetings (ModernGov)Public16 Oct 2026, 01:42open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Extension (D02A/0819) approved 2002: built as approved?
      Ask for: The grant and an opinion of compliance.
      Seller · solicitor
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Cornelscourt
    Electoral division
    Foxrock-Carrickmines
    Electoral area
    Stillorgan
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest D02A/0819, approved 2002, built? unknown.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 1 site nearby could change: 1 approved scheme.
    • 10 homes approved nearby, not started; largest 10 at No 3 Monaloe Crescent and garden of no….
    • Clonkeen Road (bus 133, 181) 189 m away: 14 an hour at morning peak; 50 from all stops within 500 m. Planned: BusConnects Core Bus Corridors 137 m away, core bus corridor (DLR County Development Plan 2022-2028).
    • Noise from road traffic mapped at 45–49 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 80% owner-occupied (council 68%); 6% of homes empty (council 6%); most built 1981–1990; 48% drive to work (council 43%); population up 6% since 2016.
    • 3 home extensions within 250 m since 2025.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.015 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public16 Oct 2026
    www2.courts.ie—© the publisher16 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.012 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.012 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public16 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.016 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence16 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 16 Oct 2026, 13:16 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.