PlanningRegister.ie
Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 5 Nov 2026, 10:14

Ellensborough Park

53.26749, -6.37109

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (99%). 22 homes approved 443 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G1
Zoning · Open space with recreation
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningG1 · Open space with recreation
What it says

OS: To preserve and provide for open space and recreational amenities

Open space with active recreational amenities — pitches, courts, play areas.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Landslide risk areas4Bohernabreena River valley; Undefined
Heritage inventory buildings1Kiltipper House
Radon grid squares2
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), GSI landslide susceptibility, National Inventory of Architectural Heritage · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
GSI landslide susceptibilityPublic27 Sept 2026, 19:36open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 44% approved, and 1 in 3 is asked for more information.

Attic or dormer55 decided · more info asked 15%
100% · council 98%
New house in a garden or site9 decided · more info asked 33%
44% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 64 nearby, 1,731 council-wide

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

1 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic21—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 5 is asked for more information, which adds about 91 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 5): 146 days; Appeal window: 4 weeks; If appealed: +118 days; Building starts: 97 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 49–55 (n=72)55 daysIf more info asked (1 in 5)With further information: median 146 days (n=19)146 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 118 days (n=8, all appeals within 1.5 km)+118 daysBuilding startsStart notice: median 97 days after permission (n=35)97 days after permissionSigned off42% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated91 decided home extensions, 36 start notices, 8 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    0 of 4 appealed refusals became permissions. 0 of 4 appealed approvals were reversed.

    Refusals appealed4 decided
    0 became permissions
    Approvals appealed4 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Ellensborough Park with 6 numbered planning items
    ⌖ the houseApproved, not startedNo decision yetApproved
    1. 1Combined sites of 'The Priory' and 'Leabeg' SD21A/0290Approved, no sign building has started · 396 m
    2. 2playing pitch at SD22A/0365Approved, no sign building has started · 443 m
    3. 362, Ellensborough Rise SD26B/0409WNo decision yet · 139 m
    4. 440 Ellensborough Downs, Kiltipper SD26B/0266WApproved · 208 m
    5. 511 Ellensborough View, Kiltipper Road SD26B/0116Approved · 280 m
    6. 6First and Mezzanine Floors above Arcadia Restaurant and Pub, Marlfield Mall SD26A/0183WNo decision yet · 454 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 19 permissions since 2016, 8 show a start notice and 1 has a completion certificate.

    30 applications lodged within 500 m. Council: 20 approved, 3 refused. After appeals: 19 approved. Of those: 1 signed off, 1 built with the owner's opt-out, 6 started, 11 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT20: lodged → approved3: lodged → refused4: lodged → withdrawn or invalid3: lodged → undecided19: approved → approved3: refused → refused4: withdrawn or invalid → withdrawn3: undecided → undecided1 approved by the council, undecided after an appeal11: approved → no start notice found1: approved → built, owner opted out6: approved → started, not signed off1: approved → signed off30 lodged30 lodged20 approved20 approved3 refused3 refused4 withdrawn or invalid4 withdrawn or invalid3 undecided3 undecided19 approved19 approved3 refused3 refused4 withdrawn4 withdrawn4 undecided4 undecided11 no start notice found11 no start notice found1 built, owner opted out1 built, owner opted out6 started, not signed off6 started, not signed off1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured30 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Approved, stalled or planned, not built yet

      22 homes 443 m away were approved Jan 2023 with no start notice yet; the permission runs to Jan 2028.

      playing pitch at · 22 homes: 22 homes approved Jan 2023, not started; Combined sites of 'The… · 10 homes: 10 homes approved Dec 2023, not started2023202420252026202720282029playing pitch at · 22 homes443 m · SD22A/036522 homes approved Jan 2023, not started22 homes approved Jan 2023, not startedCombined sites of 'The… · 10 homes396 m · SD21A/029010 homes approved Dec 2023, not started10 homes approved Dec 2023, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 2 within 500 m

      Approved, not started 2

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
      Council meetings (ModernGov)Public5 Nov 2026, 02:33open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
      Figure 8

      Applications within 500 m, by year

      Between 3 and 8 a year; busiest 2022. 87% of decisions were approvals.

      2021: 6, 2022: 8, 2023: 3, 2024: 5, 2025: 3, 2026: 505102021: 5 approved2021: 1 withdrawn or invalid6’21*2022: 4 approved2022: 1 refused2022: 2 withdrawn or invalid2022: 1 undecided8’222023: 1 approved2023: 2 refused3’232024: 5 approved5’242025: 3 approved3’252026: 2 approved2026: 1 withdrawn or invalid2026: 2 undecided5’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 5 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Building work nearby 3 in the last 12 months
      1 signed off as finished2 no sign-off needed
      • 40 Kiltipper Road, Dublin 24, Dublin, D24 Y2F7 · 9 Sept 2026 · short notice no sign-off needed · SD26B/0266W · 213 m
      • 11 Kiltipper Road, Dublin 24, Dublin, D24 K2P5 · 3 Jun 2026 · start notice, opted out no sign-off needed · SD26B/0116 · 316 m
      • Unit 2 Marlfield Row, Dublin 24, South Dublin, D24 E954 · 23 Mar 2026 · start notice signed off · SD25A/0169W · 440 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Homes coming 32 not started
      • Mountain Gate, Kiltipper, Dublin 24 (Phase 1)* · Completed · 22 homes · 322 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      D24 Neighbourhood——262 m
      Kiltipper Park——365 m
      Bohernabreena, Oldcourt and Killininny Development523—839 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      An Cosán Early Years Kiltipper · Crèche31 Jan 2025 · report · Tusla Early Years Inspectorate453 m
      Cocoon Childcare Tallaght · Crèche11 Sept 2025 · report · Tusla Early Years Inspectorate511 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.02 Nov 2026, 23:01open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register4 Nov 2026, 23:36open
      How busy is this area Busier than most of South Dublin County Council.
      Homes approved
      Here10
      Council middle0
      Homes started
      Here524
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      0% of homes built before 1971 (council 18%). 81% owner-occupied (council 67%).

      Homes built before 1971
      0% · council 18%
      Homes built since 2001
      15% · council 27%
      Owner-occupied
      81% · council 67%
      Rented
      13% · council 29%
      Children under 15
      29% · council 21%
      Aged 65 and over
      2% · council 13%
      Households with 2+ cars
      72% · council 40%
      Work mainly from home
      10% · council 10%
      This small area (383 people)South Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267035007

      Bus
      360 m
      Marlfield · 49n, 77X, 82 · busiest stop within 500 m: 4 an hour at peak
      Radon
      1 in 10
      homes here likely high (EPA). Test it
      Flood
      Within 500 m
      OPW flood map area, not beside the house
      Nearest school
      843 m
      St Martin De Porres NS, 383 pupils
      Homes sold nearby
      66
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • St Martin De Porres NS · primary · 383 pupils · 843 m

      Stops 9

      • Marlfield · 49n, 77X, 82 · 0/hour at peak · 360 m
      • Marlfield · 49n, 77X, 82 · 4/hour at peak · 382 m
      • St. Anne's Church · SD3 · 780 m
      • St. Anne's Church · SD3 · 785 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Martin De Porres NS · 843 m-2.8% pupils (383)

      Council meetings 16 items

      Public land

      • South Dublin County Council · 8.65 ha · 178 m
      • South Dublin County Council · 0.06 ha · 178 m
      • Health Service Executive · 0.23 ha · 487 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Council consultation portalsPublic5 Nov 2026, 01:15open
      Council meetings (ModernGov)Public5 Nov 2026, 02:33open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Zoned G1 (open space with recreation), not for homes: could you extend?
        Ask for: A solicitor's or planner's view.
        Solicitor · planner
      2. High radon area (1 in 10 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Kiltipper
      Electoral division
      Bohernabreena
      Electoral area
      Firhouse-Bohernabreena
      Council
      South Dublin County Council
      Everything we found, as a list 8 lines
      • Zoned G1 (open space with recreation); not protected; no vacant land tax; high radon area.
      • 2 sites nearby could change: 2 approved schemes.
      • 32 homes approved nearby, not started; largest 22 at playing pitch at.
      • Marlfield (bus 49n, 77X) 382 m away: 4 an hour at morning peak.
      • Here (2022 census): 81% owner-occupied (council 66%); 1% of homes empty (council 4%); most built 1991–2000; 63% drive to work (council 54%); population up 26% since 2016.
      • 2 home extensions within 250 m since 2026. Most were dormers or attic conversions.
      • The council decides in a median 55 days (about 8 weeks); 1 in 5 is asked for more information.
      • Homes started within 1 km: 523 in the last year, 0 three years before.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 30
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      gsi.geodata.gov.ieGeological Survey IrelandPublic27 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
      www2.courts.ie—© the publisher4 Nov 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.02 Nov 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 5 Nov 2026, 10:14 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.