PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 10:06

Kilcross Square

53.26982, -6.23500

Homes here mostly date from the 1980s. Home extensions nearby almost always get approved (94%). 60 homes approved 454 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1981–1990 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 5 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Landslide risk areas1Ticknock2001
Natural heritage areas1Fitzsimon's Wood
Radon grid squares10
Monuments6Church; Ecclesiastical enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), GSI landslide susceptibility, Natural Heritage Areas (NPWS), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
GSI landslide susceptibilityPublic27 Sept 2026, 19:36open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 82–100% by type. A new house in a garden is harder: 53% approved, and 1 in 5 is asked for more information.

Single-storey rear38 decided · more info asked 16%
89% · council 96%
Two-storey rear17 decided · more info asked 41%
82% · council 92%
Two-storey side12 decided · more info asked 33%
100% · council 95%
Single-storey side18 decided · more info asked 11%
94% · council 96%
Attic or dormer163 decided · more info asked 12%
94% · council 94%
First-floor18 decided · more info asked 6%
89% · council 90%
Garage conversion16 decided · more info asked 12%
100% · council 99%
Porch or front12 decided · more info asked 8%
100% · council 98%
New house in a garden or site15 decided · more info asked 20%
53% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 309 nearby, 3,892 council-wide

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Dormer or attic11—

On Kilcross: 4 extensions in 10 years, 100% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 51 days. 1 in 6 is asked for more information, which adds about 78 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 6): 132 days; Appeal window: 4 weeks; If appealed: +120 days; Building starts: 125 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 49–54 (n=275)51 daysIf more info asked (1 in 6)With further information: median 132 days (n=52)132 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 120 days (n=44, all appeals within 1.5 km)+120 daysBuilding startsStart notice: median 125 days after permission (n=133)125 days after permissionSigned off45% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated327 decided home extensions, 136 start notices, 44 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    8 of 15 appealed refusals became permissions. 2 of 32 appealed approvals were reversed.

    Refusals appealed15 decided
    8 became permissions
    Approvals appealed32 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months

    1 of 1 changed the council's decision

    • 501722 Granted · Mountain View, Blackglen Road, Sandyford, Dublin 18, D18N2C0 · 429 m
    • 501365 Pending · Townlands of Balally, Woodside, at Blackglen Rd, Slate Cabin Lane, D… · 497 m
    • 501309 Invalid · 14, Kilcross Road, Sandyford, Dublin, D18A6W2 · 313 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Kilcross Square with 11 numbered planning items
    ⌖ the houseWindow closingApproved, not startedApprovedOtherRefusedNo decision yet
    1. 1a 0.7333 hectare site to the north of Blackglen Road (R113), Sandyford D26A/0631/WEBNo decision yet · 395 m
    2. 2Karuna and Glenina D24A/0424/WEBApproved, no sign building has started · 454 m
    3. 322, Kilcross Grove D26B/0420/WEBApproved · 154 m
    4. 414, Kilcross Road D26B/0090/WEBApproved · 313 m
    5. 5ESB 38kV Substation, Sandyford Rd D26A/0315/WEBApproved · 381 m
    6. 6Blackglen View, Blackglen Road REF18625Section 5: exempt · 413 m
    7. 7Karuna, Sandyford Road REF3126Section 5: exempt · 427 m
    8. 8Mountain View, Blackglen Road D26A/0322/WEBRefused · 429 m
    9. 972, College Park Way C3A/0008/26No decision yet · 464 m
    10. 10B O'Reilly & Sons, Blackglen Road D26A/0059/WEBApproved · 469 m
    11. 11Townlands of Balally, Woodside D25A/0941/WEBApproved · 497 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 24 permissions since 2016, 8 show a start notice and 3 have a completion certificate.

    40 applications lodged within 500 m. Council: 25 approved, 6 refused. After appeals: 24 approved. Of those: 3 signed off, 3 built with the owner's opt-out, 2 started, 16 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT25: lodged → approved6: lodged → refused6: lodged → withdrawn or invalid3: lodged → undecided23: approved → approved5: refused → refused6: withdrawn or invalid → withdrawn3: undecided → undecided1 approved by the council, undecided after an appeal1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal16: approved → no start notice found3: approved → built, owner opted out2: approved → started, not signed off3: approved → signed off40 lodged40 lodged25 approved25 approved6 refused6 refused6 withdrawn or invalid6 withdrawn or invalid3 undecided3 undecided24 approved24 approved5 refused5 refused7 withdrawn7 withdrawn4 undecided4 undecided16 no start notice found16 no start notice found3 built, owner opted out3 built, owner opted out2 started, not signed off2 started, not signed off3 signed off3 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured40 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    2 deadlines within 500 m; the first closes 13 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-13 D26A/0631/WEB: REQUEST ADDITIONAL INFORMATION — (i)Demolition of the 1 no. existing residential unit and ancillary garage on sit; 2026-11-23 ACP 501722: Grant permissiontoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecD26A/0631/WEB: REQUEST ADDITIONAL INFORMATION — (i)Demolition of the 1 no. existing residential unit and ancillary garage on sit · 395 m away · 2026-11-13ACP 501722: Grant permission · 429 m away · 2026-11-23
    Time to appeal endsHigh Court window ends
    • Time to appeal ends 13 Nov 202612 days left
      1D26A/0631/WEB · REQUEST ADDITIONAL INFORMATION — (i)Demolition of the 1 no. existing residential unit and ancillary garage on sit
      €220 to An Coimisiún Pleanála (€110 observer) · 395 m away
    • Time to ask the High Court for a review ends 23 Nov 202622 days left
      Grant permission
      429 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    60 homes 454 m away were approved Feb 2025 with no start notice yet; the permission runs to Feb 2030.

    Karuna and Glenina · 60 homes: 60 homes approved Feb 2025, not started20242025202620272028202920302031Karuna and Glenina · 60 homes454 m · D24A/0424/WEB60 homes approved Feb 2025, not started60 homes approved Feb 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 500 m

    Approved, not started 1

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 4 and 10 a year; busiest 2025. 81% of decisions were approvals.

    2021: 6, 2022: 6, 2023: 4, 2024: 5, 2025: 10, 2026: 905102021: 4 approved2021: 2 refused6’21*2022: 3 approved2022: 2 refused2022: 1 withdrawn or invalid6’222023: 4 approved4’232024: 3 approved2024: 1 withdrawn or invalid2024: 1 undecided5’242025: 6 approved2025: 1 refused2025: 3 withdrawn or invalid10’252026: 5 approved2026: 1 refused2026: 1 withdrawn or invalid2026: 2 undecided9’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 16 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 1 in the last 12 months
    1 no sign-off needed
    • Mountain View, Blackglen Rd, Sandyford,, Dublin 18, Dublin, D18N2C0 · 21 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0322/WEB · 439 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 60 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Kilcross · 7 applications in 10 years · 100% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Site known as Whinsfield6565 being built (2026-Q2)368 m
    Karuna and Glenina6767 not started (2026-Q2)394 m
    Blackglen Road Development31no activity on site reported (2026-Q2)395 m
    ‘Karuna’ and ‘Glenina’ at Sandyford Road——399 m
    The Pastures3333 not started (2026-Q2)471 m
    Blackglen Road——475 m
    Crohamhurst80no activity on site reported (2026-Q2)480 m
    3.7 ha at——486 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Puddleducks Creche & Montessori · Crèche4 Mar 2026 · report · Tusla Early Years Inspectorate580 m
    Lambkins Montessori · Crèche28 Nov 2025 · report · Tusla Early Years Inspectorate687 m
    Blue Stars Early Years Service · Crèche10 Oct 2025 · report · Tusla Early Years Inspectorate939 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Quieter than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here419
    Council middle44
    Homes started
    Here48
    Council middle107
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    9% of homes built before 1971 (council 38%). 46% owner-occupied (council 68%).

    Homes built before 1971
    9% · council 38%
    Homes built since 2001
    11% · council 25%
    Owner-occupied
    46% · council 68%
    Rented
    51% · council 29%
    Children under 15
    17% · council 18%
    Aged 65 and over
    27% · council 17%
    Households with 2+ cars
    24% · council 39%
    Work mainly from home
    7% · council 19%
    This small area (223 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267080021

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    287 m
    Sandyford View · 114 · busiest stop within 500 m: 2 an hour at peak
    Radon
    1 in 5
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    724 m
    St. Mary's National School, 242 pupils
    Homes sold nearby
    50
    in 3 years, 1 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St. Mary's National School · primary · 242 pupils · 724 m
    • Queen Of Angels Primary School · primary · 224 pupils · 938 m

    Stops 34

    • Sandyford View · 114 · 1/hour at peak · 287 m
    • Sandyford View · 114 · 1/hour at peak · 299 m
    • Rockview · 114 · 1/hour at peak · 379 m
    • Rockview · 114 · 395 m
    • Kilcross Road · 114, 44B · 2/hour at peak · 400 m
    • Kilcross Road · 114, 44B · 1/hour at peak · 416 m
    • Blackgln Ct · 114, 44B · 2/hour at peak · 484 m
    • Blackgln Rd · 114, 44B · 1/hour at peak · 504 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St. Mary's National School · 724 m-0.8% pupils (242) · 2 classrooms 2024, approved
    • Queen Of Angels Primary School · 938 m-11.1% pupils (224)

    Council meetings 3 items

    Public land

    • Dún Laoghaire-Rathdown County Council · 5.78 ha · 164 m
    • Central Bank of Ireland · 14.78 ha · 248 m
    • Dublin City Council · 1.5 ha · 257 m
    • Dublin City Council · 5.25 ha · 319 m
    • Electricity Supply Board · 0.18 ha · 366 m
    • Central Bank of Ireland · 1 ha · 475 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. High radon area (1 in 5 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Balally
    Electoral division
    Dundrum-Sandyford
    Electoral area
    Glencullen-Sandyford
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
    • 1 site nearby could change: 1 approved scheme.
    • 60 homes approved nearby, not started; largest 60 at Karuna and Glenina.
    • Kilcross Road (bus 114, 44B) 400 m away: 2 an hour at morning peak; 9 from all stops within 500 m.
    • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 50% rent (council 28%); 3% of homes empty (council 6%); most built 1981–1990; 52% drive to work (council 43%).
    • 1 home extension within 250 m since 2026. On Kilcross: 4 in 10 years, 100% approved.
    • Around here the council decides in a median 52 days (about 7 weeks); 1 in 6 is asked for more information.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    gsi.geodata.gov.ieGeological Survey IrelandPublic27 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 10:06 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.