PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 08:49

Kingston Heights

53.27058, -6.24733

Homes here mostly date from the 1980s. 3 planning files on this house, the latest from 2023. Home extensions nearby almost always get approved (94%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992). 3 planning files on this house, the latest from 2024.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990. 3 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Kingston HeightsBuilt: most homes in this small area date from 1981–1990 (census estimate)most built2024: D23A/0626 · attic or dormer, approved2023: D23B/0396 · attic or dormer, withdrawn or invalid2021: D21A/0109 · permission. the development, approved2021: 1 file on Kingston Heights2023: 3 files on Kingston Heights4 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    D23A/0626 · attic or dormer · approved 2024 · not started, runs out 2027
    approvedstartedsigned off
  2. 2023
    D23B/0396 · attic or dormer · withdrawn
    approved?started?signed off?
  3. 2021
    D21A/0109 · permission. the development · approved 2021 · ran out unbuilt
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 5 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Landslide risk areas1Ticknock2001
Radon grid squares9
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), GSI landslide susceptibility · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
GSI landslide susceptibilityPublic27 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 80–100% by type. A new house in a garden is harder: 53% approved, and 1 in 3 is asked for more information.

Single-storey rear38 decided · more info asked 24%
87% · council 96%
Two-storey rear15 decided · more info asked 47%
80% · council 92%
Two-storey side10 decided · more info asked 40%
100% · council 95%
Single-storey side13 decided · more info asked 31%
100% · council 96%
Attic or dormer128 decided · more info asked 12%
96% · council 94%
First-floor11 decided · more info asked 0%
82% · council 90%
Garage conversion22 decided · more info asked 14%
100% · council 99%
Porch or front17 decided · more info asked 12%
100% · council 98%
New house in a garden or site15 decided · more info asked 33%
53% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 269 nearby, 3,892 council-wide

Figure 3

Kingston Heights, file by file since 2021

3 of 3 decided extensions on the road were approved.

4 planning files on Kingston Heights since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 14 · 2021 · attic conversion / dormer · approved · D21A/0109No. 14 · 2023 · attic conversion / dormer · approved · D23A/0626No. 14 · 2023 · attic conversion / dormer · withdrawn or invalid · D23B/0396No. 19 · 2023 · garage conversion · approved · D23B/0411Porches, roofs, otherNew house in a side garden
ApprovedRefusedWithdrawn or invalid

4 files with "Kingston Heights" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

1 approved4 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic41—
Other10—

On Kingston: 23 extensions in 10 years, 100% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 5 is asked for more information, which adds about 76 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 5): 132 days; Appeal window: 4 weeks; If appealed: +128 days; Building starts: 143 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–55 (n=224)52 daysIf more info asked (1 in 5)With further information: median 132 days (n=54)132 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 128 days (n=38, all appeals within 1.5 km)+128 daysBuilding startsStart notice: median 143 days after permission (n=125)143 days after permissionSigned off53% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated278 decided home extensions, 127 start notices, 38 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    8 of 15 appealed refusals became permissions. 1 of 26 appealed approvals were reversed.

    Refusals appealed15 decided
    8 became permissions
    Approvals appealed26 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500915 Open · 68, The Avenue, Woodpark, Dublin 16, D16VH29 · 336 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Kingston Heights with 14 numbered planning items
    ⌖ the houseBuilding startedNo decision yetApprovedRefusedOther
    1. 115 Kingston Avenue, Dublin 16 D26B/0169/WEBBuilding started · 161 m
    2. 22 Kingston Lawn, Ballinteer D26B/0505/WEBNo decision yet · 84 m
    3. 33, The Crescent D26B/0072/WEBApproved · 331 m
    4. 413, The View D26B/0032Approved · 334 m
    5. 568, The Avenue D25A/0988/WEBRefused · 336 m
    6. 63, The Close D26B/0074/WEBApproved · 372 m
    7. 7UNIT 2 & 3, Blackglen Village Centre D25A/0857/WEBApproved · 372 m
    8. 824 College Park Way, Ballinteer REF5826Section 5: exempt · 384 m
    9. 931, The Rise D26A/0583/WEBNo decision yet · 401 m
    10. 10Saint Claires, Blackglen Road D26B/0238/WEBApproved · 429 m
    11. 1136 Ballintyre Walk, Ballinteer D26B/0373/WEBApproved · 443 m
    12. 1237, Clonlea REF13826Section 5: awaiting decision · 444 m
    13. 1342, The Rise D26B/0227/WEBApproved · 456 m
    14. 1472, College Park Way C3A/0008/26No decision yet · 463 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 71 permissions since 2016, 28 show a start notice and 0 have a completion certificate.

    88 applications lodged within 500 m. Council: 70 approved, 3 refused. After appeals: 71 approved. Of those: 0 signed off, 10 built with the owner's opt-out, 18 started, 43 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT70: lodged → approved3: lodged → refused12: lodged → withdrawn or invalid3: lodged → undecided70: approved → approved2: refused → refused12: withdrawn or invalid → withdrawn3: undecided → undecided1 refused by the council, approved after an appeal43: approved → no start notice found10: approved → built, owner opted out18: approved → started, not signed off88 lodged88 lodged70 approved70 approved3 refused3 refused12 withdrawn or invalid12 withdrawn or invalid3 undecided3 undecided71 approved71 approved2 refused2 refused12 withdrawn12 withdrawn3 undecided3 undecided43 no start notice found43 no start notice found10 built, owner opted out10 built, owner opted out18 started, not signed off18 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured88 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Applications within 500 m, by year

      Between 13 and 17 a year; busiest 2025. 96% of decisions were approvals.

      2021: 13, 2022: 13, 2023: 13, 2024: 16, 2025: 17, 2026: 16051015202021: 12 approved2021: 1 refused13’21*2022: 13 approved13’222023: 12 approved2023: 1 withdrawn or invalid13’232024: 14 approved2024: 2 withdrawn or invalid16’242025: 12 approved2025: 1 refused2025: 4 withdrawn or invalid17’252026: 7 approved2026: 1 refused2026: 5 withdrawn or invalid2026: 3 undecided16’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 20 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 7 in the last 12 months
      7 no sign-off needed
      • 42 The Rise, Dublin 16, Dublin, D16 XD66 · 7 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0227/WEB · 468 m
      • 115 Kingston Avenue, Dublin 16, Dublin, D16 K596 · 5 Oct 2026 · 1 homes · short notice no sign-off needed · D26B/0169/WEB · 161 m
      • 3 The Close, Dublin 16, Dublin, D16 RH30 · 22 Jun 2026 · short notice no sign-off needed · D26B/0074/WEB · 384 m
      • 497 Ballinteer Road, Ballinteer, Dún Laoghaire-Rathdown, D16 TY20 · 29 May 2026 · 1 homes · short notice no sign-off needed · D25B/0247/WEB · 246 m
      • 3 The Heath, Woodpark, Ballinteer, Dublin 16, Dún Laoghaire-Rathdown, D16 PE04 · 9 Apr 2026 · 1 homes · short notice no sign-off needed · D21B/0703 · 169 m
      • 3 The Heath, Woodpark, Ballinteer, Dublin 16, Dún Laoghaire-Rathdown, D16 PE04 · 12 Mar 2026 · 1 homes · short notice no sign-off needed · D21B/0703 · 170 m
      • 53 The Rise, Dublin, Dún Laoghaire-Rathdown, D16 XP65 · 10 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D25B/0211/WEB · 322 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Kingston · 25 applications in 10 years · 100% approved · most common: attic conversion / dormer

      Developments within 1.0 km

      SchemeHomesProgressDistance
      The Coach House Public House5454 not started (2026-Q2)579 m
      0.555 ha. site at3939 not started (2026-Q2)634 m
      Deerfield House7373 not started (2026-Q2)709 m
      Blackglen Road Development31no activity on site reported (2026-Q2)869 m
      Blackglen Road——900 m
      3.7 ha at——900 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Puddleducks Creche & Montessori · Crèche4 Mar 2026 · report · Tusla Early Years Inspectorate321 m
      Absorbent Minds Ballintyre · Crèche30 Apr 2025 · report · Tusla Early Years Inspectorate590 m
      Absorbent Minds · Crèche12 Nov 2025 · report · Tusla Early Years Inspectorate640 m
      Blue Stars Early Years Service · Crèche10 Oct 2025 · report · Tusla Early Years Inspectorate701 m
      Ballyboden Children's Centre · Crèche10 Dec 2024 · report · Tusla Early Years Inspectorate881 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Quieter than most of Dún Laoghaire-Rathdown County Council.
      Homes approved
      Here265
      Council middle46
      Homes started
      Here46
      Council middle80
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      10% of homes built before 1971 (council 38%). 62% owner-occupied (council 68%).

      Homes built before 1971
      10% · council 38%
      Homes built since 2001
      36% · council 25%
      Owner-occupied
      62% · council 68%
      Rented
      36% · council 29%
      Children under 15
      19% · council 18%
      Aged 65 and over
      9% · council 17%
      Households with 2+ cars
      42% · council 39%
      Work mainly from home
      11% · council 19%
      This small area (372 people)Dún Laoghaire-Rathdown

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267007018

      Road noise
      60–64 dB
      day–night average (EPA 2022)
      Bus
      143 m
      Kingston · 16, 46n, 74 · busiest stop within 500 m: 13 an hour at peak
      Radon
      1 in 5
      homes here likely high (EPA). Test it
      Nearest school
      831 m
      Wesley College, 942 pupils
      Homes sold nearby
      73
      in 3 years, 3 new (Property Price Register)
      Schools, stops and the council

      Schools

      • Wesley College · postprimary · 942 pupils · 831 m
      • Na Maighdine Muire Girl · primary · 200 pupils · 866 m
      • Scoil an Maighdine Mhuire Boys · primary · 176 pupils · 881 m

      Stops 30

      • Kingston · 16, 46n, 74, 750, S8 · 13/hour at peak · 143 m
      • Kingston · 16, 16D, 74, 750, S8 · 6/hour at peak · 148 m
      • Rockview · 114 · 461 m
      • Rockview · 114 · 1/hour at peak · 470 m
      • Delbrook Park · 74 · 2/hour at peak · 491 m
      • Grange Hall · 16, 16D, 74, S8 · 10/hour at peak · 532 m
      • Sandyford View · 114 · 1/hour at peak · 540 m
      • Sandyford View · 114 · 1/hour at peak · 549 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Wesley College · 831 m-0.8% pupils (942) · a pitch or play area 2026, no decision yet
      • Na Maighdine Muire Girl · 866 m-10.7% pupils (200)
      • Scoil an Maighdine Mhuire Boys · 881 m-12.4% pupils (176)

      Council meetings 3 items

      Public land

      • Dún Laoghaire-Rathdown County Council · 0.48 ha · 102 m
      • Dublin City Council · 1.67 ha · 199 m
      • Dún Laoghaire-Rathdown County Council · 0.45 ha · 295 m
      • Dublin City Council · 0.15 ha · 295 m
      • Dún Laoghaire-Rathdown County Council · 3.17 ha · 341 m
      • Dún Laoghaire-Rathdown County Council · 0.21 ha · 370 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Attic or dormer (D23A/0626) approved 2024, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      2. Permission. the development (D21A/0109) ran out unbuilt in 2026: built anyway?
        Ask for: If built: proof it started in time, and an opinion of compliance.
        Seller · solicitor
      3. High radon area (1 in 5 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Kingstown
      Electoral division
      Ballinteer-Woodpark
      Electoral area
      Glencullen-Sandyford
      Council
      Dun Laoghaire-Rathdown County Council
      Everything we found, as a list 8 lines
      • 3 applications on this site; latest D23A/0626, approved 2024, not started, runs out 2027.
      • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
      • Nothing nearby looks set to change.
      • Kingston (bus 16, 46n) 143 m away: 13 an hour at morning peak; 23 from all stops within 500 m.
      • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 62% owner-occupied (council 68%); 0% of homes empty (council 6%); most built 1981–1990; 51% drive to work (council 43%); population down 2% since 2016.
      • 5 home extensions within 250 m since 2026. Most were dormers or attic conversions. On Kingston: 23 in 10 years, 100% approved.
      • The council decides in a median 52 days (about 7 weeks); 1 in 8 is asked for more information.
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 29
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gsi.geodata.gov.ieGeological Survey IrelandPublic27 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 08:49 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.