PlanningRegister.ie
Planning report · Galway City Council · 500 m around the house · the last 12 months · 5 Nov 2026, 10:03

1 Quay Lane

53.27068, -9.05433

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (92%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Galway City Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 7 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
M2
Zoning · Major town centre
Yes
Protected or listed · a protected building (Single Bay 2 Storey with Dormer Building); inside the zone around a recorded monument (GA094-100072-)
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

City Centre: To Provide for city centre uses

The main town centre — retail, offices, civic uses, apartments.

galway city development plan 2023 2029 · 4 Jan 2023 – 4 Jan 2029

ZoningM2 · Major town centre
What it says

City Centre: To Provide for city centre uses

The main town centre — retail, offices, civic uses, apartments.

galway city development plan 2023 2029 variations 1 2 3 · 4 Jan 2023 – 4 Jan 2029

Protected buildingOn this site Single Bay 2 Storey with Dormer Building; Single Bay, 2 Storey with Dormer Building
Heritage inventory15 within 100 m Blake's Castle; The Halls
Monument zoneOn this site Fortification, Townparks (Galway By., St. Nicholas Par.); Castle - tower house, Townparks (Galway By., St. Nicholas Par.)

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings103Island House; house
Monuments52Religious house - Dominican friars; Graveyard
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 52 on the draft 2027 map; 52 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

This is a protected building: almost any change, inside or out, needs permission.

Figure 2

What happened to applications like yours

Extensions here: 78–98% by type. A new house in a garden is harder: 80% approved, and 1 in 2 are asked for more information.

Single-storey rear42 decided · more info asked 17%
98% · council 94%
Two-storey rear42 decided · more info asked 45%
95% · council 92%
Attic or dormer23 decided · more info asked 26%
78% · council 88%
First-floor17 decided · more info asked 18%
94% · council 96%
Porch or front13 decided · more info asked 23%
85% · council 89%
New house in a garden or site20 decided · more info asked 50%
80% · council 85%
Approved nearbyGalway overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 157 nearby, 556 council-wide

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 no decision or withdrawn
KindAppliedApprovedRefused
Rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 53 days. 1 in 3 is asked for more information, which adds about 99 days. Building starts about 7 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 3): 153 days; Appeal window: 4 weeks; Building starts: 218 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 49–55 (n=152)53 daysIf more info asked (1 in 3)With further information: median 153 days (n=61)153 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 218 days after permission (n=75)218 days after permissionSigned off60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated213 decided home extensions, 75 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    13 of 27 appealed refusals became permissions. 3 of 33 appealed approvals were reversed.

    Refusals appealed27 decided
    13 became permissions
    Approvals appealed33 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 501824 Pending · McLaughlin Building , Nun's Island/Gaol Road Nun's Island , Galway… · 362 m
    • 500580 Refused · 21 Shop Street & , 24 Middle Street , Galway · 184 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around 1 Quay Lane with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingAppealEmpty land zoned for homesBuilding startedApproved
    1. 1The Presbytery, Gaol Road 2660381No decision yet · 295 m
    2. 216 Mill Street, Galway 2660295Approved with conditions · 375 m
    3. 31 Williamsgate Street, Townparks Td 2660294Refused · 472 m
    4. 421 Shop Street &, 24 Middle Street 500580Appeal: refused · 184 m
    5. 50.7 ha zoned for homesEmpty land zoned for homes · 130 m
    6. 63 Mainguard Street, Galway CN0142742GYBuilding started · 170 m
    7. 70.7 ha zoned for homesEmpty land zoned for homes · 179 m
    8. 8Saint Augustine Street, Galway SN0014685GYBuilding started · 190 m
    9. 90.5 ha zoned for homesEmpty land zoned for homes · 191 m
    10. 1040 Dominick Street Lower, Galway 25/60094Building started · 192 m
    11. 1122 Middle Street, Galway 25/60069Building started · 198 m
    12. 120.2 ha zoned for homesEmpty land zoned for homes · 201 m
    13. 130.2 ha zoned for homesEmpty land zoned for homes · 220 m
    14. 140.1 ha zoned for homesEmpty land zoned for homes · 237 m
    15. 15Second and Part Fourth Floor The Halls, 15/17 Quay Street 2660304Approved with conditions · 31 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 133 permissions since 2016, 26 show a start notice and 6 have a completion certificate.

    160 applications lodged within 500 m. Council: 128 approved, 32 refused. After appeals: 133 approved. Of those: 6 signed off, 7 built with the owner's opt-out, 13 started, 98 with no start notice found, 9 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT128: lodged → approved32: lodged → refused126: approved → approved25: refused → refused1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal7 refused by the council, approved after an appeal98: approved → no start notice found7: approved → built, owner opted out13: approved → started, not signed off6: approved → signed off9: approved → ran out160 lodged160 lodged128 approved128 approved32 refused32 refused133 approved133 approved26 refused26 refused1 withdrawn1 withdrawn98 no start notice found98 no start notice found7 built, owner opted out7 built, owner opted out13 started, not signed off13 started, not signed off6 signed off6 signed off9 ran out9 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured160 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    3 deadlines within 500 m; the first closes 5 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-05 2660294: REFUSED — Permission for development which consists of: The development consists of the following: (1) The retention of the chang; 2026-11-05 2660295: CONDITIONAL — Permission for development which consists of: to construct a new single storey extension to rear of existing dwelling a; 2026-11-23 2660381: application received — Permission for development which consists of: planning permission for a) removal/demolition of existing attached garage/today10 Nov15 Nov20 Nov25 Nov30 Nov5 Dec2660294: REFUSED — Permission for development which consists of: The development consists of the following: (1) The retention of the chang · 472 m away · 2026-11-052660295: CONDITIONAL — Permission for development which consists of: to construct a new single storey extension to rear of existing dwelling a · 375 m away · 2026-11-052660381: application received — Permission for development which consists of: planning permission for a) removal/demolition of existing attached garage/ · 295 m away · 2026-11-23
    Comments closeTime to appeal ends
    • Time to appeal ends 5 Nov 2026closes today
      32660294 · REFUSED — Permission for development which consists of: The development consists of the following: (1) The retention of…
      €220 to An Coimisiún Pleanála (€110 observer) · 472 m away
    • Time to appeal ends 5 Nov 2026closes today
      22660295 · CONDITIONAL — Permission for development which consists of: to construct a new single storey extension to rear of…
      €220 to An Coimisiún Pleanála (€110 observer) · 375 m away
    • Comments close 23 Nov 202618 days left
      12660381 · application received — Permission for development which consists of: planning permission for a) removal/demolition of…
      €20 to the council · 295 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 10 within 500 m

    Empty land zoned for homes 10

    • 50.7 ha zoned for homes · no homes built on it yet · 130 m
    • 70.7 ha zoned for homes · no homes built on it yet · 179 m
    • 90.5 ha zoned for homes · no homes built on it yet · 191 m
    • 120.2 ha zoned for homes · no homes built on it yet · 201 m
    • 130.2 ha zoned for homes · no homes built on it yet · 220 m
    • 140.1 ha zoned for homes · no homes built on it yet · 237 m
    • 0.5 ha zoned for homes · no homes built on it yet · 261 m
    • 0.1 ha zoned for homes · no homes built on it yet · 277 m
    • 0.2 ha zoned for homes · no homes built on it yet · 281 m
    • 0.8 ha zoned for homes · no homes built on it yet · 283 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 7

    Applications within 500 m, by year

    Between 19 and 40 a year; busiest 2022. 80% of decisions were approvals.

    2021: 32, 2022: 40, 2023: 23, 2024: 19, 2025: 33, 2026: 130102030402021: 25 approved2021: 7 refused32’21*2022: 31 approved2022: 9 refused40’222023: 14 approved2023: 9 refused23’232024: 17 approved2024: 2 refused19’242025: 29 approved2025: 4 refused33’252026: 12 approved2026: 1 refused13’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1The Presbytery , Gaol Road , Galway comments close 23 Nov 2026
      Permission for development which consists of: planning permission for a) removal/demolition of existing…
      266038119 Oct 20261 homes295 m
    Every application within 500 m 26 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Building work nearby 14 in the last 12 months
    2 signed off as finished4 not signed off8 no sign-off needed
    • 5 Fairhill Road Upper, Galway, H91 FKK4 · 19 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60224 · 458 m
    • 20 William Street, Galway, H91 F8D9 · 21 Sept 2026 · short notice no sign-off needed · 25/60266 · 379 m
    • 36 Shop Street, Galway, H91 K4A9 · 25 Aug 2026 · 7-day notice not signed off · 276 m
    • 8Saint Augustine Street, Galway, H91 R6WF · 12 Aug 2026 · 7-day notice not signed off · 190 m
    • Normal Unit 224 Eyre Square Shopping Centre, Eyre Square, Galway, Galway, H91 Y267 · 28 Jul 2026 · 7-day notice not signed off · 368 m
    • 1122 Middle Street, Galway · 23 Jul 2026 · 1 homes · short notice no sign-off needed · 25/60069 · 198 m
    • 1040 Dominick Street Lower, Galway, H91K6R3 · 26 Jun 2026 · short notice no sign-off needed · 25/60094 · 192 m
    • 63 Mainguard Street, Galway, H91 CC79 · 18 May 2026 · short notice no sign-off needed · 170 m
    • 7 Saint Nicholas Street, Galway, H91 ATX0 · 30 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2560203 · 306 m
    • 31 Eyre Square, Galway, H91 P5Y8 · 10 Apr 2026 · 7-day notice not signed off · 487 m
    • 7 Grattan Road, Galway, H91 PX3C · 11 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · PP2560098 · 497 m
    • 31 William Street, Galway, H91 CY64 · 4 Mar 2026 · start notice signed off · 380 m
    • Harbour Hotel, Bóthar Na Long, Galway, H91 E9PR · 16 Jan 2026 · 7-day notice signed off · 25/60221 · 482 m
    • 16 Mill Street, Galway, H91 H6WE · 7 Nov 2025 · short notice no sign-off needed · 25/60194 · 383 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    St. Pat's Pre-School And Afterschool · Crèche21 Jan 2025 · report · Tusla Early Years Inspectorate192 m
    Naíonra Iognáid · Crèche5 Jun 2025 · report · Tusla Early Years Inspectorate543 m
    SALI Childcare Service Ltd · Crèche3 Jul 2025 · report · Tusla Early Years Inspectorate575 m
    Scoil Croi Iosa Presentation Early Year Services · Crèche10 Dec 2025 · report · Tusla Early Years Inspectorate671 m
    Child's Play Creche · Crèche7 Oct 2025 · report · Tusla Early Years Inspectorate675 m
    Wonder Kids Creche · Crèche11 Jul 2025 · report · Tusla Early Years Inspectorate960 m
    Little Red Hen Creche · Crèche16 Jul 2024 · report · Tusla Early Years Inspectorate960 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 23:36
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area Busier than most of Galway City Council.
    Homes approved
    Here0
    Council middle5
    Homes started
    Here110
    Council middle28
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    8% owner-occupied (council 46%).

    Homes built before 1971
    11% · council 17%
    Homes built since 2001
    4% · council 31%
    Owner-occupied
    8% · council 46%
    Rented
    70% · council 47%
    Children under 15
    10% · council 15%
    Aged 65 and over
    11% · council 13%
    Households with 2+ cars
    7% · council 29%
    Work mainly from home
    8% · council 11%
    This small area (423 people)Galway

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 068007006

    Road noise
    65–69 dB
    day–night average (EPA 2022)
    Bus
    41 m
    Spanish Arch · 525 · busiest stop within 500 m: 13 an hour at peak
    Nearest school
    190 m
    S N Padraic Naofa, 214 pupils
    Homes sold nearby
    1
    in 3 years, 1 new (Property Price Register)
    Schools, stops and the council

    Schools

    • S N Padraic Naofa · primary · 214 pupils · 190 m
    • St Joseph's College · postprimary · 791 pupils · 329 m
    • Niochlas NS · primary · 262 pupils · 429 m
    • Galway City & Oranmore Educate Together Secondary School · postprimary · 379 pupils · 458 m
    • Coláiste Iognáid S.J. · postprimary · 637 pupils · 477 m
    • S N Iognaid · primary · 480 pupils · 543 m
    • Scoil An Linbh Iosa · primary · 236 pupils · 561 m
    • Parochial NS · primary · 75 pupils · 637 m

    Stops 48

    • Spanish Arch · 525 · 41 m
    • Spanish Arch · 401, 424, 525, 809 · 5/hour at peak · 42 m
    • Spanish Arch · 401, 424, 809 · 3/hour at peak · 43 m
    • Merchants Rd · 844 · 256 m
    • Fr Griffin Rd · 401 · 3/hour at peak · 344 m
    • Fr Griffin Rd · 401 · 3/hour at peak · 382 m
    • Victoria Place · 401, 424 · 3/hour at peak · 460 m
    • Victoria Place · 525 · 0/hour at peak · 488 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Padraic Naofa · 190 m-7.4% pupils (214)
    • St Joseph's College · 329 m+3.1% pupils (791)
    • Niochlas NS · 429 m-3.3% pupils (262)
    • Galway City & Oranmore Educate Together Secondary School · 458 m+8.3% pupils (379)
    • Coláiste Iognáid S.J. · 477 m+0.2% pupils (637) · a pitch or play area 2026, approved with conditions
    • S N Iognaid · 543 m-3.8% pupils (480) · a pitch or play area 2026, approved with conditions
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Council consultation portalsPublic5 Nov 2026, 01:15open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Protected building: what changes would you be allowed?
      Ask for: A section 57 declaration from the council.
      Council
    2. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    3. Application 295 m away open for comments until 23 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Mapped at 65–69 dB from road traffic: will you hear it inside?
      Ask for: A visit at rush hour (and at night), and the windows' glazing specification.
      Visit at rush hour
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Eyre Square
    Electoral area
    Galway City Central
    Council
    Galway City Council
    Everything we found, as a list 8 lines
    • Zoned M2 (major town centre); protected building; monument zone; no vacant land tax.
    • 10 sites nearby could change: 10 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 23 Nov 2026.
    • St Francis Street (bus 402, 404) 491 m away: 13 an hour at morning peak; 33 from all stops within 500 m.
    • Noise from road traffic mapped at 65–69 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 70% rent (council 47%); 7% of homes empty (council 10%); most built 1991–2000; 23% drive to work (council 47%); population up 8% since 2016.
    • 1 home extension within 250 m since 2026.
    • Around here the council decides in a median 55 days (about 8 weeks); 40% are asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
    www2.courts.ie—© the publisher4 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 5 Nov 2026, 10:03 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.