Knocksinna, White's Cross

53.27445, -6.18036

Homes here mostly date from the 1980s. Home extensions nearby almost always get approved (95%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KnocksinnaBuilt: most homes in this small area date from 1981–1990 (census estimate)most built2022: 1 file on Knocksinna2023: 1 file on Knocksinna2024: 1 file on Knocksinna2025: 1 file on Knocksinna4 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
Yes
Protected or listed · a protected building (Cranleigh); a building in the national heritage inventory (60230067)
No
Vacant land tax · lived-in homes don't pay it
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Protected buildingOn this site Cranleigh
Heritage inventoryOn this site Cranleigh
Radon1 in 5 homes have high radon (EPA)

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas1Foxrock
Heritage inventory buildings12Tallon House; Hermiston
Radon grid squares9
Protected buildings16Fahanmura; Glencroe
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

This is a protected building: almost any change, inside or out, needs permission.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 89–100% by type. A new house in a garden is harder: 54% approved, and 1 in 3 is asked for more information.

Single-storey rear85 decided · more info asked 9%
99% · council 96%
Two-storey rear25 decided · more info asked 8%
96% · council 92%
Two-storey side18 decided · more info asked 11%
89% · council 95%
Single-storey side10 decided · more info asked 30%
100% · council 96%
Attic or dormer143 decided · more info asked 9%
93% · council 94%
First-floor24 decided · more info asked 8%
92% · council 90%
Garage conversion20 decided · more info asked 10%
100% · council 99%
Porch or front10 decided · more info asked 0%
100% · council 98%
New house in a garden or site28 decided · more info asked 39%
54% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 363 nearby, 3,892 council-wide

Figure 3

Knocksinna, file by file since 2022

2 of 2 decided extensions on the road were approved.

4 planning files on Knocksinna since 2022, by kind and decision.20222023202420252026Extensions, atticsNo number · 2022 · first-floor · approved · D22B/0111No number · 2023 · single-storey rear · approved · D23A/0300Porches, roofs, otherNo number · 2024 · other work · approved · D24A/0480No number · 2025 · other work · approved · D25A/0998/WEBNew house in a side garden
ApprovedRefusedWithdrawn or invalid

4 files with "Knocksinna" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

4 approved
KindAppliedApprovedRefused
First-floor22—
Garage conversion11—
Two-storey side11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days. 1 in 9 is asked for more information, which adds about 66 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 9): 116 days; Appeal window: 4 weeks; If appealed: +132 days; Building starts: 117 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 49–54 (n=355)51 daysIf more info asked (1 in 9)With further information: median 116 days (n=43)116 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 132 days (n=68, all appeals within 1.5 km)+132 daysBuilding startsStart notice: median 117 days after permission (n=183)117 days after permissionSigned off67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated398 decided home extensions, 184 start notices, 68 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    19 of 34 appealed refusals became permissions. 2 of 37 appealed approvals were reversed.

    Refusals appealed34 decided
    19 became permissions
    Approvals appealed37 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months

    1 of 3 changed the council's decision

    • 501339 Refused · Lisheen, 31 Knocksinna Park, Newpark, Dublin 18, D18C5R3 · 459 m
    • 501464 Granted · Ballytrain, Stillorgan Road, Galloping Green South, Dublin 18 · 157 m
    • 500714 Granted · Carrigmore, Golf Lane, Torquay Road, Foxrock, Dublin 18, D18F2Y8 (ACA) · 476 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Knocksinna, White's Cross with 15 numbered planning items
    ⌖ the houseAppealApprovedOtherNo decision yetRefused
    1. 1Ballytrain, Stillorgan Road 501464Appeal: approved · 157 m
    2. 2Knocksinna House, Knocksinna D25A/0998/WEBApproved · 21 m
    3. 3Raford, Knocksinna D22B/0111/EApproved · 75 m
    4. 4Stanmore, Stillorgan Road D26B/0216Approved · 237 m
    5. 58, Knocksinna Park REF17126Section 5: awaiting decision · 280 m
    6. 618, Knocksinna Park D25B/0634/WEBApproved · 355 m
    7. 7National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area PC/IC/01/26No decision yet · 399 m
    8. 839, Knocksinna Crescent REF16826Section 5: awaiting decision · 402 m
    9. 963 Foxrock Manor, Foxrock REF8426Section 5: exempt · 430 m
    10. 10108, Foxrock Park D26A/0442/WEBApproved · 430 m
    11. 1130, Knocksinna Park D26B/0488/WEBNo decision yet · 448 m
    12. 1231 Knocksinna Park, Foxrock V/019/26Section 5: exempt · 459 m
    13. 13Carrigmore, Golf Lane D25A/0841/WEBRefused · 476 m
    14. 1410, Granville Road D25A/0895/WEBApproved · 479 m
    15. 1536, Knocksinna Park D25A/0933/WEBApproved · 494 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 53 permissions since 2016, 26 show a start notice and 2 have a completion certificate. Most owners opt out of sign-off.

    75 applications lodged within 500 m. Council: 52 approved, 13 refused. After appeals: 53 approved. Of those: 2 signed off, 16 built with the owner's opt-out, 8 started, 27 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT52: lodged → approved13: lodged → refused8: lodged → withdrawn or invalid2: lodged → undecided49: approved → approved9: refused → refused8: withdrawn or invalid → withdrawn2: undecided → undecided1 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal4 refused by the council, approved after an appeal27: approved → no start notice found16: approved → built, owner opted out8: approved → started, not signed off2: approved → signed off75 lodged75 lodged52 approved52 approved13 refused13 refused8 withdrawn or invalid8 withdrawn or invalid2 undecided2 undecided53 approved53 approved10 refused10 refused9 withdrawn9 withdrawn3 undecided3 undecided27 no start notice found27 no start notice found16 built, owner opted out16 built, owner opted out8 started, not signed off8 started, not signed off2 signed off2 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured75 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 5 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-05 ACP 501339: Refuse permission; 2026-11-05 ACP 501464: Grant permissiontoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecACP 501339: Refuse permission · 459 m away · 2026-11-05ACP 501464: Grant permission · 157 m away · 2026-11-05
    High Court window ends
    • Time to ask the High Court for a review ends 5 Nov 20264 days left
      Refuse permission
      459 m away
    • Time to ask the High Court for a review ends 5 Nov 20264 days left
      Grant permission
      157 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    BusConnects Core Bus Corridors is planned 119 m away.

    BusConnects Core Bus…: core bus corridor (DLR County Development Plan 2022-2028)20242025202620272028BusConnects Core Bus…119 m · plannedcore bus corridor (DLR County Development Plan 2022-2028)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Figure 9

    Applications within 500 m, by year

    Between 9 and 22 a year; busiest 2025. 80% of decisions were approvals.

    2021: 12, 2022: 9, 2023: 13, 2024: 11, 2025: 22, 2026: 801020302021: 7 approved2021: 3 refused2021: 2 withdrawn or invalid12’21*2022: 9 approved9’222023: 10 approved2023: 3 refused13’232024: 5 approved2024: 3 refused2024: 3 withdrawn or invalid11’242025: 17 approved2025: 3 refused2025: 2 withdrawn or invalid22’252026: 4 approved2026: 1 refused2026: 1 withdrawn or invalid2026: 2 undecided8’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 18 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 13 in the last 12 months
    3 not signed off10 no sign-off needed
    • Site B, Carreen, Golf Lane, Westminster Road, Foxrock, Dublin 18, Dublin · 21 Sept 2026 · 2 homes · start notice not signed off · D24A/0240/WEB · 454 m
    • Site A, Carreen, Golf Lane, Westminster Road, Dublin 18, Dublin · 7 Sept 2026 · 2 homes · start notice not signed off · D21A/0166 · 447 m
    • 108 Foxrock Park, Dublin 18, Dublin, D18 Y2N5 · 17 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0226/WEB · 440 m
    • 10 Granville Road, Blackrock, Dublin, A94 CH24 · 12 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0895/WEB · 487 m
    • 18 Knocksinna Park, Dublin 18, Dublin, D18 T0X8 · 27 Jul 2026 · start notice, opted out no sign-off needed · D25B/0634/WEB · 364 m
    • Carreen, Golf Lane, off Westminister Road, Dublin 18, Dublin, D18 K7R0 · 14 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D21A/0166 · 437 m
    • Golf Lane, Torquay Road, Foxrock, Dún Laoghaire-Rathdown, D18F2Y8 · 18 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0509/WEB · 483 m
    • Torquay Road, Dublin, D18 V3Y1 · 26 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0573/WEB · 498 m
    • Torquay Road, Galloping Green, Dún Laoghaire-Rathdown, d18f9x4 · 30 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0322/WEB · 460 m
    • 67 Granville Park, Blackrock, Dún Laoghaire-Rathdown, A94 TD28 · 9 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0561/WEB · 472 m
    • 16 Foxrock Green, Dublin 18, Dún Laoghaire-Rathdown, D18 C8X6 · 26 Nov 2025 · 1 homes · short notice no sign-off needed · D25B/0459/WEB · 480 m
    • 20 Springfield Park, Foxrock, Dún Laoghaire-Rathdown, D18W7Y0 · 24 Nov 2025 · 1 homes · start notice not signed off · D24A/0221 · 402 m
    • 15 Avonmore, Foxrock, Dún Laoghaire-Rathdown, D18 X2K6 · 7 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D25B/0391/WEB · 316 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Funchal & Garryknock3636 being built (2026-Q2)197 m
    Rockall2828 not started (2026-Q2)438 m
    Rockall, The Birches2424 not started (2026-Q2)439 m
    51 & 524545 not started (2026-Q2)497 m
    Rockbrae, Westminster Road2626 being built (2026-Q2)772 m
    Overall site of c.1.14ha at Weavers Hall5151 not started (2026-Q2)856 m
    The Grove, Mart Lane21no activity on site reported (2026-Q2)870 m
    Gortanore51— (2026-Q2)904 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Tiny Tots Playschool & Montessori · Crèche29 Jan 2026 · report · Tusla Early Years Inspectorate111 m
    Lycée Français International (LFI) · Crèche18 Mar 2026 · report · Tusla Early Years Inspectorate710 m
    Willow House Childcare Newtownpark · Crèche25 Jul 2025 · report · Tusla Early Years Inspectorate725 m
    Libby McGuire Montessori School · Crèche15 Sept 2025 · report · Tusla Early Years Inspectorate935 m
    Cocobee Childcare · Crèche28 Apr 2026 · report · Tusla Early Years Inspectorate991 m
    Foxrock Montessori School · Crèche5 Nov 2025 · report · Tusla Early Years Inspectorate992 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area About as busy as most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here14
    Council middle44
    Homes started
    Here134
    Council middle92
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    19% of homes built before 1971 (council 38%). 77% owner-occupied (council 68%).

    Homes built before 1971
    19% · council 38%
    Homes built since 2001
    3% · council 25%
    Owner-occupied
    77% · council 68%
    Rented
    18% · council 29%
    Children under 15
    23% · council 18%
    Aged 65 and over
    15% · council 17%
    Households with 2+ cars
    56% · council 39%
    Work mainly from home
    18% · council 19%
    This small area (276 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267090003

    Bus
    146 m
    Knocksinna · E1, E2 · busiest stop within 500 m: 22 an hour at peak
    Planned
    119 m
    BusConnects Core Bus Corridors, City to Bray
    Radon
    1 in 5
    homes here likely high (EPA). Test it
    Nearest school
    299 m
    Loreto College Foxrock, 660 pupils
    Homes sold nearby
    27
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Loreto College Foxrock · postprimary · 660 pupils · 299 m
    • St Patricks Gns · primary · 478 pupils · 662 m
    • Scoil Padraig Naofa B · primary · 499 pupils · 734 m
    • St Brigids Boys NS · primary · 406 pupils · 965 m

    Stops 27

    • Knocksinna · E1, E2 · 19/hour at peak · 146 m
    • Knocksinna · 46n, E1, E2 · 13/hour at peak · 148 m
    • Foxrock Church · 181, 2, 740, 740A, 740X, E1 · 22/hour at peak · 356 m
    • Foxrock Church · 181, 2, 46n, E1, E2, X1 · 14/hour at peak · 358 m
    • Newtownpark Avenue · 133, 46n, E1, E2, X1, X2 · 14/hour at peak · 486 m
    • Leopardstown Rd · 114, S8 · 4/hour at peak · 518 m
    • Kelston Park · 114, S8 · 5/hour at peak · 532 m
    • Kill Lane · E2 · 6/hour at peak · 543 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Loreto College Foxrock · 299 m+3.6% pupils (660)
    • St Patricks Gns · 662 m-1.8% pupils (478) · 4 classrooms 2024, approved
    • Scoil Padraig Naofa B · 734 m-2.5% pupils (499) · 4 classrooms 2024, approved
    • St Brigids Boys NS · 965 m-0.7% pupils (406)

    Council meetings 2 items

    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Protected building: what changes would you be allowed?
      Ask for: A section 57 declaration from the council.
      Council
    2. High radon area (1 in 5 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Galloping Green South
    Electoral division
    Foxrock-Torquay
    Electoral area
    Stillorgan
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); protected building; heritage-listed; no vacant land tax; high radon area.
    • Nothing nearby looks set to change.
    • Foxrock Church (bus 181, 2) 356 m away: 22 an hour at morning peak; 82 from all stops within 500 m. Planned: BusConnects Core Bus Corridors 119 m away, core bus corridor (DLR County Development Plan 2022-2028).
    • Here (2022 census): 77% owner-occupied (council 68%); 7% of homes empty (council 6%); most built 1981–1990; 46% drive to work (council 43%); population up 8% since 2016.
    • 4 home extensions within 250 m since 2026. Most were first-floor extensions.
    • The council decides in a median 52 days (about 7 weeks); 1 in 8 is asked for more information.
    • 3 appeals nearby decided in the last 12 months; 1 turned a refusal into a yes.
    • Homes started within 1 km: 25 in the last year, 16 three years before.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 18:10 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.