PlanningRegister.ie
Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 10:04

Hazelgrove, Kiltalown

53.27502, -6.39656

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (93%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of HazelgroveBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2023: 1 file on Hazelgrove2024: 1 file on Hazelgrove2026: 2 files on Hazelgrove4 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1Kiltalown House
Radon grid squares2
Monuments7Ritual site - holy well; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 79% by type.

Single-storey rear14 decided · more info asked 50%
79% · council 96%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 14 nearby, 470 council-wide

Figure 3

Hazelgrove, file by file since 2023

1 of 1 decided extensions on the road were approved.

4 planning files on Hazelgrove since 2023, by kind and decision.2023202420252026Extensions, atticsNo. 74 · 2023 · single-storey rear · approved · SD23B/0418Porches, roofs, otherNo number · 2024 · other work · approved · SD24A/0139WNo number · 2026 · other work · withdrawn or invalid · SD26A/0060WNo number · 2026 · other work · approved · SD26A/0072WNew house in a side garden
ApprovedRefusedWithdrawn or invalid

4 files with "Hazelgrove" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2023–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 2 is asked for more information, which adds about 86 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 2): 137 days; Appeal window: 4 weeks; If appealed: +121 days; Building starts: 92 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 51–55 (n=23)55 daysIf more info asked (1 in 2)With further information: median 137 days (n=18)137 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 121 days (n=8, all appeals within 1.5 km)+121 daysBuilding startsStart notice: median 92 days after permission (n=12)92 days after permissionSigned off25% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated41 decided home extensions, 12 start notices, 8 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 4 appealed refusals became permissions. 1 of 4 appealed approvals were reversed.

    Refusals appealed4 decided
    0 became permissions
    Approvals appealed4 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Hazelgrove, Kiltalown with 3 numbered planning items
    ⌖ the houseEmpty land zoned for homesApprovedOther
    1. 121.9 ha zoned for homesEmpty land zoned for homes · 50 m
    2. 2Scoil Chaitlín Maude, Hazelgrove SD26A/0072WApproved · 74 m
    3. 3Adj Jobstown House Pub, Blessington Rd ED26/0106Section 5: awaiting decision · 281 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 6 permissions since 2016, 0 show a start notice and 0 have a completion certificate.

    12 applications lodged within 500 m. Council: 6 approved, 2 refused. After appeals: 6 approved. Of those: 0 signed off, 0 built with the owner's opt-out, 0 started, 6 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT6: lodged → approved2: lodged → refused3: lodged → withdrawn or invalid1: lodged → undecided6: approved → approved2: refused → refused3: withdrawn or invalid → withdrawn1: undecided → undecided6: approved → no start notice found12 lodged12 lodged6 approved6 approved2 refused2 refused3 withdrawn or invalid3 withdrawn or invalid1 undecided1 undecided6 approved6 approved2 refused2 refused3 withdrawn3 withdrawn1 undecided1 undecided6 no start notice found6 no start notice found

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured12 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 1 within 500 m

      Empty land zoned for homes 1

      • 121.9 ha zoned for homes · no homes built on it yet · 50 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 1 and 4 a year; busiest 2022. 75% of decisions were approvals.

      2021: 3, 2022: 4, 2023: 1, 2024: 1, 2025: 1, 2026: 205102021: 1 approved2021: 1 refused2021: 1 withdrawn or invalid3’21*2022: 1 approved2022: 1 refused2022: 1 withdrawn or invalid2022: 1 undecided4’222023: 1 approved1’232024: 1 approved1’242025: 1 approved1’252026: 1 approved2026: 1 withdrawn or invalid2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 3 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 1 in the last 12 months
      1 not signed off
      • 35 Crestwood Road, Killinarden,, Dublin · 10 Jul 2026 · 3 homes · 7-day notice not signed off · LRD22A/0002 · 481 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Hazelgrove · 1 applications in 10 years

      Developments within 1.0 km

      SchemeHomesProgressDistance
      The Foothills63595 being built · 540 not started (2026-Q2)41 m
      D24 Neighbourhood——131 m
      Whitestown and Killinarden——347 m
      Whitestown Stream——558 m
      Jobstown Park——825 m
      SCD Leisure Tallaght——882 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      St. Elmo's Preschool · Crèche13 Mar 2025 · report · Tusla Early Years Inspectorate353 m
      St. Louise's Playschool · Crèche23 Feb 2023 · report · Tusla Early Years Inspectorate353 m
      Youth Horizons Creche · Crèche9 Sept 2025 · report · Tusla Early Years Inspectorate873 m
      JADD Project Childcare Service · Crèche3 Oct 2024 · report · Tusla Early Years Inspectorate902 m
      An Turas · Crèche23 Jun 2026 · report · Tusla Early Years Inspectorate949 m
      Toddling Tots · Crèche27 May 2024 · report · Tusla Early Years Inspectorate951 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of South Dublin County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here637
      Council middle4
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      70% owner-occupied (council 67%).

      Homes built before 1971
      18% · council 18%
      Homes built since 2001
      20% · council 27%
      Owner-occupied
      70% · council 67%
      Rented
      26% · council 29%
      Children under 15
      25% · council 21%
      Aged 65 and over
      11% · council 13%
      Households with 2+ cars
      40% · council 40%
      Work mainly from home
      11% · council 10%
      This small area (324 people)South Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267006002

      Bus
      149 m
      Hazelgrove · 65B, 77A · busiest stop within 500 m: 11 an hour at peak
      Radon
      1 in 10
      homes here likely high (EPA). Test it
      Nearest school
      130 m
      Killinarden Community School, 471 pupils
      Homes sold nearby
      9
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Killinarden Community School · postprimary · 471 pupils · 130 m
      • Scoil Chaitlin Maude · primary · 284 pupils · 174 m
      • Scoil Cnoc Mhuire Junior · primary · 141 pupils · 257 m
      • Scoil Cnoc Mhuire Sin · primary · 145 pupils · 327 m
      • St Thomas Senior NS · primary · 331 pupils · 618 m
      • St Thomas Junior NS · primary · 300 pupils · 673 m
      • Tallaght Community National School · primary · 151 pupils · 880 m
      • An Chroi Ro Naofa Sois · primary · 167 pupils · 971 m

      Stops 25

      • Hazelgrove · 65B, 77A · 4/hour at peak · 149 m
      • Knockmore Ave · 65B, 77A, 77X · 6/hour at peak · 150 m
      • Knockmore Ave · 65B, 77A · 4/hour at peak · 157 m
      • Jobstown House · 65, 65A, 65B, 77A, 77n, S8 · 8/hour at peak · 276 m
      • Knockmore Gdns · 65B, 77A, 77X · 6/hour at peak · 323 m
      • Jobstown House · 65, 65A, 65B, 77A, 77X, S8 · 11/hour at peak · 336 m
      • Killinarden Hts · 65B, 77A · 4/hour at peak · 356 m
      • Killinarden Hts · 65B, 77A, 77X · 6/hour at peak · 427 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Killinarden Community School · 130 m-7.3% pupils (471)
      • Scoil Chaitlin Maude · 174 m-5.3% pupils (284) · an extension 2024, approved
      • Scoil Cnoc Mhuire Junior · 257 m-6.6% pupils (141)
      • Scoil Cnoc Mhuire Sin · 327 m-0.7% pupils (145)
      • St Thomas Senior NS · 618 m-7.3% pupils (331) · 30 classrooms 2026, approved
      • St Thomas Junior NS · 673 m-2.6% pupils (300) · 30 classrooms 2026, approved

      Open consultations

      Council meetings 30 items

      Public land

      • The Minister for Education and Skills · 3.72 ha · 40 m
      • The Minister for Education and Skills · 1.42 ha · 70 m
      • South Dublin County Council · 0.38 ha · 93 m
      • South Dublin County Council · 3.88 ha · 100 m
      • The Minister for Education and Skills · 0.17 ha · 101 m
      • The Minister for Education and Skills · 1.39 ha · 149 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. High radon area (1 in 10 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Kiltalown
      Electoral division
      Ballinascorney
      Electoral area
      Tallaght South
      Council
      South Dublin County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
      • 1 site nearby could change: 1 empty zoned plot.
      • Jobstown House (bus 65, 65A) 336 m away: 11 an hour at morning peak; 48 from all stops within 500 m.
      • Here (2022 census): 70% owner-occupied (council 66%); 4% of homes empty (council 4%); most built 1991–2000; 58% drive to work (council 54%); population down 5% since 2016.
      • The council decides in a median 55 days (about 8 weeks); 1 in 5 is asked for more information.
      • 3 applications nearby in the last 12 months.
      • Scoil Chaitlin Maude, 174 m away: an extension approved (2024). Pupils down 5% last year.
      • 637 homes started within 1 km in 3 years (council middle 4).
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 30
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 10:04 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.