PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 23:50

Ballinteer Crescent

53.27636, -6.25352

Homes here mostly date from the 1960s. 1 planning file on this house, the latest from 2021. Home extensions nearby almost always get approved (96%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1961–70, around when planning permission began (1964). 1 planning file on this house, the latest from 2021.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1961–1970. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1961–1970 (census estimate)most built2021: D21B/0285 · permission for development., approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    D21B/0285 · permission for development. · approved 2021 · ran out unbuilt
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares6
Protected buildings2Ballinteer Hall Gate Lodge; Ballintyre Hall
Monuments3Cupmarked stone (present location); R187626
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Records of Protected Structures, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–100% by type. A new house in a garden is harder: 73% approved, and 1 in 2 is asked for more information.

Single-storey rear58 decided · more info asked 12%
93% · council 96%
Two-storey rear25 decided · more info asked 20%
88% · council 92%
Two-storey side16 decided · more info asked 31%
100% · council 95%
Single-storey side15 decided · more info asked 33%
100% · council 96%
Attic or dormer173 decided · more info asked 16%
97% · council 94%
First-floor20 decided · more info asked 15%
95% · council 90%
Garage conversion43 decided · more info asked 12%
100% · council 99%
Porch or front22 decided · more info asked 14%
100% · council 98%
New house in a garden or site15 decided · more info asked 47%
73% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 387 nearby, 3,892 council-wide

Extensions and refusals right beside you 6 within 250 m · 0 refused within 100 m

Extensions and refusals near you 6 extensions within 250 m · the last 12 months

5 of 5 approved (100%) · most common: porch

5 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Porch21—
Other11—
Rear11—
Single-storey rear11—
Two-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 52 days. 1 in 6 is asked for more information, which adds about 60 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 6): 118 days; Appeal window: 4 weeks; If appealed: +124 days; Building starts: 134 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–54 (n=342)52 daysIf more info asked (1 in 6)With further information: median 118 days (n=68)118 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 124 days (n=42, all appeals within 1.5 km)+124 daysBuilding startsStart notice: median 134 days after permission (n=207)134 days after permissionSigned off378 days after the start, for the few who file. 55% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated410 decided home extensions, 208 start notices, 42 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    8 of 15 appealed refusals became permissions. 1 of 29 appealed approvals were reversed.

    Refusals appealed15 decided
    8 became permissions
    Approvals appealed29 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Ballinteer Crescent with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApprovedOtherRefusedNo decision yet
    1. 129 Ballinteer Drive, Ballinteer D26B/0546/WEBNo decision yet · 224 m
    2. 244, Broadford Hill D26B/0556No decision yet · 484 m
    3. 3No. 79 Ballinteer Park, Dublin 16 D26A/0348/WEBApproved · 345 m
    4. 45, Broadford Close D26B/0062/WEBApproved · 138 m
    5. 5No. 1 Broadford Lawn, Ballinteer D26B/0023/WEBApproved · 202 m
    6. 634, Ballinteer Park D26B/0044/WEBApproved · 226 m
    7. 734a, Ballinteer Park D25A/0929Approved · 227 m
    8. 835, Ballinteer Park V/058/26Section 5: exempt · 229 m
    9. 910a, Ballinteer Drive D26B/0318/WEBApproved · 236 m
    10. 1014, Ballinteer Court D25B/0698/WEBApproved · 284 m
    11. 1142, The Rise D26B/0227/WEBApproved · 292 m
    12. 1254, Ballinteer Park REF18225Section 5: awaiting decision · 317 m
    13. 1324 Broadford Park, Ballinteer D26A/0226/WEBRefused · 339 m
    14. 1431, The Rise D26A/0583/WEBNo decision yet · 341 m
    15. 1556, Broadford Cres D26A/0712/WEBNo decision yet · 382 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 101 permissions since 2016, 40 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    132 applications lodged within 500 m. Council: 96 approved, 14 refused. After appeals: 101 approved. Of those: 0 signed off, 23 built with the owner's opt-out, 17 started, 61 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT96: lodged → approved14: lodged → refused17: lodged → withdrawn or invalid5: lodged → undecided96: approved → approved8: refused → refused17: withdrawn or invalid → withdrawn5: undecided → undecided5 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal61: approved → no start notice found23: approved → built, owner opted out17: approved → started, not signed off132 lodged132 lodged96 approved96 approved14 refused14 refused17 withdrawn or invalid17 withdrawn or invalid5 undecided5 undecided101 approved101 approved8 refused8 refused18 withdrawn18 withdrawn5 undecided5 undecided61 no start notice found61 no start notice found23 built, owner opted out23 built, owner opted out17 started, not signed off17 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured132 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    3 deadlines within 500 m; the first closes 3 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-03 D26A/0348/WEB: GRANT PERMISSION FOR RETENTION — The retention consists of an as built timber fence along the North, South & West; 2026-11-20 D26B/0546/WEB: application received — Amendments to previously granted permission (Ref. D25B/0532/WEB), comprising the omission of the permitted first-floor a; 2026-11-27 D26B/0556: application received — A new ground floor only porch to the front of the existing house. A new flat roof dormer to the rear of the existing houtoday5 Nov10 Nov15 Nov20 Nov25 Nov30 NovD26A/0348/WEB: GRANT PERMISSION FOR RETENTION — The retention consists of an as built timber fence along the North, South & West · 345 m away · 2026-11-03D26B/0546/WEB: application received — Amendments to previously granted permission (Ref. D25B/0532/WEB), comprising the omission of the permitted first-floor a · 224 m away · 2026-11-20D26B/0556: application received — A new ground floor only porch to the front of the existing house. A new flat roof dormer to the rear of the existing hou · 484 m away · 2026-11-27
    Comments closeTime to appeal ends
    • Time to appeal ends 3 Nov 20263 days left
      3D26A/0348/WEB · GRANT PERMISSION FOR RETENTION — The retention consists of an as built timber fence along the North, South & West
      €220 to An Coimisiún Pleanála (€110 observer) · 345 m away
    • Comments close 20 Nov 202620 days left
      1D26B/0546/WEB · application received — Amendments to previously granted permission (Ref. D25B/0532/WEB), comprising the omission of the…
      €20 to the council · 224 m away
    • Comments close 27 Nov 202627 days left
      2D26B/0556 · application received — A new ground floor only porch to the front of the existing house. A new flat roof dormer to the…
      €20 to the council · 484 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Applications within 500 m, by year

    Between 14 and 23 a year; busiest 2025. 87% of decisions were approvals.

    2021: 29, 2022: 14, 2023: 20, 2024: 22, 2025: 23, 2026: 2401020302021: 25 approved2021: 4 refused29’21*2022: 11 approved2022: 2 refused2022: 1 withdrawn or invalid14’222023: 18 approved2023: 1 refused2023: 1 withdrawn or invalid20’232024: 12 approved2024: 2 refused2024: 8 withdrawn or invalid22’242025: 16 approved2025: 3 refused2025: 4 withdrawn or invalid23’252026: 14 approved2026: 2 refused2026: 3 withdrawn or invalid2026: 5 undecided24’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 32 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 11 in the last 12 months
    1 not signed off10 no sign-off needed
    • 66 Ballinteer Park, Dublin 16, Dublin, D16 DD39 · 16 Nov 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0293/WEB · 436 m
    • 42 The Rise, Dublin 16, Dublin, D16 XD66 · 7 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0227/WEB · 302 m
    • 10A Ballinteer Drive, Dublin 16, Dublin, D16 P8Y2 · 28 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0318/WEB · 256 m
    • 1A Broadford Lawn, Dublin 16, Dublin, D16 PY01 · 6 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0023/WEB · 217 m
    • 24 Ludford Park, Balinteer, Dún Laoghaire-Rathdown, D16 KT59 · 18 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0639 · 463 m
    • 26 The Court, Ballinteer, Dún Laoghaire-Rathdown, D16 K440 · 30 Mar 2026 · 6 homes · start notice not signed off · D18A/1096/E · 382 m
    • 66 Ballinteer Park, Ballinteer, Dún Laoghaire-Rathdown, D16 DD39 · 20 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0403/WEB · 436 m
    • 98 Ballinteer Close, Ballinteer, Dún Laoghaire-Rathdown, D16 TX40 · 26 Jan 2026 · 1 homes · short notice no sign-off needed · D24B/0110 · 123 m
    • 86 Ballinteer Park, Ballinteer, Dún Laoghaire-Rathdown, D16 TV72 · 10 Dec 2025 · start notice, opted out no sign-off needed · D20B/0313 · 397 m
    • 94 Ballinteer Park, BALLINTEER, Dún Laoghaire-Rathdown, D16 C9C7 · 20 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D22B/0509 · 391 m
    • 53 The Rise, Dublin, Dún Laoghaire-Rathdown, D16 XP65 · 10 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D25B/0211/WEB · 473 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 0 not started
    • Saint Anne's Court, Ballinteer, D16 (CABHRÚ) · Stage 4 tender approval · 6 homes · 120 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    The Coach House Public House5454 not started (2026-Q2)233 m
    Ballinteer Lodge3131 not started (2026-Q2)788 m
    Marmalade Lane——869 m
    "Marmalade Lane"——873 m
    'Marmalade Lane'——875 m
    0.555 ha. site at3939 not started (2026-Q2)947 m
    Deerfield House7373 not started (2026-Q2)952 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Absorbent Minds Ballintyre · Crèche30 Apr 2025 · report · Tusla Early Years Inspectorate176 m
    Ballyboden Children's Centre · Crèche10 Dec 2024 · report · Tusla Early Years Inspectorate325 m
    Absorbent Minds · Crèche12 Nov 2025 · report · Tusla Early Years Inspectorate497 m
    Blue Stars Early Years Service · Crèche10 Oct 2025 · report · Tusla Early Years Inspectorate659 m
    Naíonra Naithí · Crèche12 Mar 2025 · report · Tusla Early Years Inspectorate848 m
    Once upon a time · Crèche9 Jun 2025 · report · Tusla Early Years Inspectorate917 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area About as busy as most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here31
    Council middle44
    Homes started
    Here82
    Council middle93
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    81% of homes built before 1971 (council 38%). 88% owner-occupied (council 68%).

    Homes built before 1971
    81% · council 38%
    Homes built since 2001
    3% · council 25%
    Owner-occupied
    88% · council 68%
    Rented
    11% · council 29%
    Children under 15
    14% · council 18%
    Aged 65 and over
    32% · council 17%
    Households with 2+ cars
    32% · council 39%
    Work mainly from home
    12% · council 19%
    This small area (240 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267009003

    Road noise
    45–49 dB
    day–night average (EPA 2022)
    Bus
    134 m
    Broadford Cl · 116, 14, 46n · busiest stop within 500 m: 5 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    325 m
    Scoil an Maighdine Mhuire Boys, 176 pupils
    Homes sold nearby
    60
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Scoil an Maighdine Mhuire Boys · primary · 176 pupils · 325 m
    • Na Maighdine Muire Girl · primary · 200 pupils · 333 m
    • St Attractas Junior NS · primary · 337 pupils · 540 m
    • St Attractas Senior NS · primary · 371 pupils · 571 m
    • Wesley College · postprimary · 942 pupils · 717 m
    • Ballinteer Community School · postprimary · 415 pupils · 747 m
    • Scoil Naithi · primary · 231 pupils · 848 m

    Stops 38

    • Broadford Cl · 116, 14, 46n · 5/hour at peak · 134 m
    • Ballinteer Ave · 116, 14, 46n · 5/hour at peak · 149 m
    • Broadford Cl · 116, 14 · 5/hour at peak · 161 m
    • Ballinteer Ave · 116, 14 · 5/hour at peak · 162 m
    • Broadford Ris · 116, 14 · 5/hour at peak · 171 m
    • Broadford Ris · 116, 14, 46n · 5/hour at peak · 216 m
    • Ballinteer Ct · 116, 14 · 5/hour at peak · 242 m
    • Broadford Dr · 116, 14, 46n · 5/hour at peak · 334 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil an Maighdine Mhuire Boys · 325 m-12.4% pupils (176)
    • Na Maighdine Muire Girl · 333 m-10.7% pupils (200)
    • St Attractas Junior NS · 540 m-0.3% pupils (337)
    • St Attractas Senior NS · 570 m+5.1% pupils (371)
    • Wesley College · 717 m-0.8% pupils (942) · a pitch or play area 2026, no decision yet
    • Ballinteer Community School · 747 m+2.7% pupils (415)

    Council meetings 1 items

    Public land

    • Health Service Executive · 0.27 ha · 75 m
    • Dublin City Council · 1.67 ha · 321 m
    • Dublin City Council · 1.74 ha · 464 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Permission for development. (D21B/0285) ran out unbuilt in 2026: built anyway?
      Ask for: If built: proof it started in time, and an opinion of compliance.
      Seller · solicitor
    2. Application 224 m away open for comments until 20 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Ballinteer
    Electoral division
    Ballinteer-Ludford
    Electoral area
    Dundrum
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest D21B/0285, approved 2021, ran out unbuilt.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 2 applications open for comments nearby; nearest closes 20 Nov 2026.
    • Grange Hall (bus 16, 46n) 496 m away: 12 an hour at morning peak; 75 from all stops within 500 m.
    • Noise from road traffic mapped at 45–49 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 88% owner-occupied (council 68%); 3% of homes empty (council 6%); most built 1961–1970; 57% drive to work (council 43%); population up 4% since 2016.
    • 6 home extensions within 250 m since 2025: 5 approved (100%). Most were porches.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 23:50 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.