PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 5 Nov 2026, 08:28

Manor Close

53.28079, -6.26835

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (96%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Conservation areas1Marlay Park
Heritage inventory buildings8Eden; Marlay House
Radon grid squares3
Protected buildings6Elm Park House (former Servite Monastery); Marlay Park House
Monuments2Enclosure; R149397
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, OPW flood maps (CFRAM), National Inventory of Architectural Heritage, Records of Protected Structures, Sites and Monuments Record · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–100% by type. A new house in a garden is harder: 61% approved, and 1 in 2 is asked for more information.

Single-storey rear62 decided · more info asked 15%
94% · council 96%
Two-storey rear26 decided · more info asked 23%
88% · council 92%
Two-storey side16 decided · more info asked 38%
100% · council 95%
Single-storey side16 decided · more info asked 38%
100% · council 96%
Attic or dormer214 decided · more info asked 17%
98% · council 94%
First-floor23 decided · more info asked 13%
91% · council 90%
Garage conversion46 decided · more info asked 13%
100% · council 99%
Porch or front21 decided · more info asked 19%
95% · council 98%
New house in a garden or site28 decided · more info asked 43%
61% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 452 nearby, 3,892 council-wide

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

1 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Rear21—

On Marley Grange: 42 extensions in 10 years, 95% of all applications approved; most common single-storey rear.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 52 days. 1 in 5 is asked for more information, which adds about 64 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 5): 119 days; Appeal window: 4 weeks; If appealed: +134 days; Building starts: 133 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–55 (n=384)52 daysIf more info asked (1 in 5)With further information: median 119 days (n=88)119 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 134 days (n=51, all appeals within 1.5 km)+134 daysBuilding startsStart notice: median 133 days after permission (n=234)133 days after permissionSigned off412 days after the start, for the few who file. 57% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated472 decided home extensions, 237 start notices, 51 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    9 of 22 appealed refusals became permissions. 2 of 30 appealed approvals were reversed.

    Refusals appealed22 decided
    9 became permissions
    Approvals appealed30 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Manor Close with 11 numbered planning items
    ⌖ the houseWindow closingBuilding startedApprovedNo decision yetOther
    1. 17 Grange Wood, Rathfarnham D26A/0660/WEBRefused · 315 m
    2. 217 Marley Drive, Dublin 16 D26B/0287Building started · 149 m
    3. 36 Manor Park, Rathfarnham D26B/0154/WEBApproved · 129 m
    4. 435, Grange Wood D25B/0656/WEBApproved · 251 m
    5. 512, Grange Wood D26B/0380/WEBApproved · 294 m
    6. 610 Grange Wood, Rathfarnham D26B/0511/WEBNo decision yet · 302 m
    7. 72 Eden Court, Rathfarnham SD26B/0193WApproved · 376 m
    8. 8National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area PC/IC/01/26No decision yet · 399 m
    9. 9SDCC Lands @28 Locations PT8SD422No decision yet · 415 m
    10. 1029, Eden Grove SD26B/0337WApproved · 416 m
    11. 1184, Meadow Mount REF4826Section 5: exempt · 473 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 71 permissions since 2016, 37 show a start notice and 3 have a completion certificate. Most owners opt out of sign-off.

    89 applications lodged within 500 m. Council: 70 approved, 4 refused. After appeals: 71 approved. Of those: 3 signed off, 23 built with the owner's opt-out, 11 started, 32 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT70: lodged → approved4: lodged → refused12: lodged → withdrawn or invalid3: lodged → undecided70: approved → approved3: refused → refused12: withdrawn or invalid → withdrawn3: undecided → undecided1 refused by the council, approved after an appeal32: approved → no start notice found23: approved → built, owner opted out11: approved → started, not signed off3: approved → signed off2: approved → ran out89 lodged89 lodged70 approved70 approved4 refused4 refused12 withdrawn or invalid12 withdrawn or invalid3 undecided3 undecided71 approved71 approved3 refused3 refused12 withdrawn12 withdrawn3 undecided3 undecided32 no start notice found32 no start notice found23 built, owner opted out23 built, owner opted out11 started, not signed off11 started, not signed off3 signed off3 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured89 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 24 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-24 D26A/0660/WEB: REFUSE PERMISSION FOR RETENTION — Retention and permission. The development consists of; retention of a small detatoday10 Nov15 Nov20 Nov25 Nov30 Nov5 DecD26A/0660/WEB: REFUSE PERMISSION FOR RETENTION — Retention and permission. The development consists of; retention of a small deta · 315 m away · 2026-11-24
    Time to appeal ends
    • Time to appeal ends 24 Nov 202619 days left
      1D26A/0660/WEB · REFUSE PERMISSION FOR RETENTION — Retention and permission. The development consists of; retention of a small deta
      €220 to An Coimisiún Pleanála (€110 observer) · 315 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Applications within 500 m, by year

    Between 14 and 19 a year; busiest 2023. 95% of decisions were approvals.

    2021: 14, 2022: 15, 2023: 19, 2024: 14, 2025: 14, 2026: 13051015202021: 11 approved2021: 3 withdrawn or invalid14’21*2022: 13 approved2022: 2 refused15’222023: 19 approved19’232024: 10 approved2024: 4 withdrawn or invalid14’242025: 12 approved2025: 1 refused2025: 1 withdrawn or invalid14’252026: 5 approved2026: 1 refused2026: 4 withdrawn or invalid2026: 3 undecided13’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 16 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Building work nearby 7 in the last 12 months
    7 no sign-off needed
    • 21 Grange Court, Dublin, D16 AK40 · 23 Oct 2026 · 1 homes · short notice no sign-off needed · D25B/0219 · 218 m
    • 217 Marley Drive, Dublin 16, Dublin, D16 VF66 · 5 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0287 · 149 m
    • 2 Eden Court, Rathfarnham, Dublin 16, Dublin, D16 W6H2 · 21 Aug 2026 · start notice, opted out no sign-off needed · SD26B/0193W · 389 m
    • 8 Eden Crescent, rathfarnham, South Dublin, D16 V3A2 · 2 Mar 2026 · short notice no sign-off needed · SD25B/0189 · 496 m
    • 1 Grange Wood, Dublin, Dún Laoghaire-Rathdown · 26 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0438/WEB · 356 m
    • 28 Eden Court, Dublin 16, South Dublin, D16 T9N7 · 19 Feb 2026 · start notice, opted out no sign-off needed · SD24B/0508W · 395 m
    • 22 Llewellyn Court, Rathfarnham, Dún Laoghaire-Rathdown, D16 YH22 · 28 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D25B/0158/WEB · 288 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Marley Grange · 49 applications in 10 years · 95% approved · most common: single-storey rear

    Developments within 1.0 km

    SchemeHomesProgressDistance
    SDCC Lands @28 Locations——415 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Poppins Montessori · Crèche11 Feb 2025 · report · Tusla Early Years Inspectorate118 m
    Daisy Chain Montessori and Childcare Ltd · Crèche4 Dec 2025 · report · Tusla Early Years Inspectorate410 m
    Naíonra Naithí · Crèche12 Mar 2025 · report · Tusla Early Years Inspectorate484 m
    Young World · Crèche18 Jul 2024 · report · Tusla Early Years Inspectorate751 m
    Ballyboden Children's Centre · Crèche10 Dec 2024 · report · Tusla Early Years Inspectorate926 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.02 Nov 2026, 23:01open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area Quieter than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here0
    Council middle22
    Homes started
    Here53
    Council middle107
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    10% of homes built before 1971 (council 38%). 95% owner-occupied (council 68%).

    Homes built before 1971
    10% · council 38%
    Homes built since 2001
    2% · council 25%
    Owner-occupied
    95% · council 68%
    Rented
    5% · council 29%
    Children under 15
    16% · council 18%
    Aged 65 and over
    33% · council 17%
    Households with 2+ cars
    57% · council 39%
    Work mainly from home
    21% · council 19%
    This small area (249 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267010003

    Bus
    207 m
    Highfield Ave · 116, 16, 161 · busiest stop within 500 m: 13 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    484 m
    Scoil Naithi, 231 pupils
    Homes sold nearby
    831
    in 3 years, 32 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Scoil Naithi · primary · 231 pupils · 484 m
    • Marley Grange Ns · primary · 461 pupils · 491 m
    • Ballinteer Community School · postprimary · 415 pupils · 510 m
    • St Attractas Junior NS · primary · 337 pupils · 803 m
    • St Attractas Senior NS · primary · 371 pupils · 846 m
    • Scoil an Maighdine Mhuire Boys · primary · 176 pupils · 926 m
    • Na Maighdine Muire Girl · primary · 200 pupils · 943 m

    Stops 36

    • Highfield Ave · 116, 16, 161, 16D, 74, S8 · 11/hour at peak · 207 m
    • Marlay Park · 116, 16, 161, 74, S8 · 13/hour at peak · 259 m
    • Marlay Park · 116, 16, 161, 16D, 74, S8 · 12/hour at peak · 300 m
    • Three Rock Rvrs · 116, 16, 161, 74, S8 · 13/hour at peak · 326 m
    • Three Rock Rvrs · 116, 16, 161, 16D, 74, S8 · 11/hour at peak · 352 m
    • Dargle Vw · 14, 161 · 6/hour at peak · 401 m
    • Dargle Vw · 14, 161 · 5/hour at peak · 403 m
    • Llewellyn Park · 14, 161 · 5/hour at peak · 416 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil Naithi · 484 m0% pupils (231)
    • Marley Grange Ns · 491 m-0.9% pupils (461)
    • Ballinteer Community School · 510 m+2.7% pupils (415)
    • St Attractas Junior NS · 802 m-0.3% pupils (337)
    • St Attractas Senior NS · 846 m+5.1% pupils (371)
    • Scoil an Maighdine Mhuire Boys · 926 m-12.4% pupils (176)

    Council meetings 1 items

    Public land

    • Dublin City Council · 0.16 ha · 213 m
    • South Dublin County Council · 0.11 ha · 365 m
    • Dún Laoghaire-Rathdown County Council · 0.52 ha · 382 m
    • South Dublin County Council · 0.3 ha · 415 m
    • The Minister for Education and Skills · 4.42 ha · 432 m
    • The Minister for Education and Skills · 1.02 ha · 445 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Council consultation portalsPublic5 Nov 2026, 01:15open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Haroldsgrange
    Electoral division
    Ballinteer-Marley
    Electoral area
    Dundrum
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • Heather Lawn (bus 116, 16) 463 m away: 13 an hour at morning peak; 101 from all stops within 500 m.
    • Here (2022 census): 95% owner-occupied (council 68%); 0% of homes empty (council 6%); most built 1971–1980; 54% drive to work (council 43%); population down 1% since 2016.
    • 2 home extensions within 250 m since 2026. Most were rear extensions. On Marley Grange: 42 in 10 years, 95% approved.
    • The council decides in a median 52 days (about 7 weeks); 1 in 8 is asked for more information.
    • Homes started within 1 km: 12 in the last year, 15 three years before.
    • 16 applications nearby in the last 12 months; 86% approved (council 87%).
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 33
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
    www2.courts.ie—© the publisher4 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.02 Nov 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 5 Nov 2026, 08:28 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.