PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 08:15

Silchester Park, Glenagarey

53.28093, -6.13057

Homes here mostly date from the 1950s. 2 planning files on this house, the latest from 2026. Home extensions nearby almost always get approved (96%). 4 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed. 2 planning files on this house, the latest from 2026.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960. 2 planning files on this house.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Silchester ParkBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2026: D26A/0023/WEB · alterations, approved2025: D25A/0253/WEB · permission is sought, approved2021: 4 files on Silchester Park2022: 3 files on Silchester Park2023: 7 files on Silchester Park2024: 8 files on Silchester Park2025: 3 files on Silchester Park2026: 7 files on Silchester Park32 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    D26A/0023/WEB · alterations · approved 2026 · work already done
    approvedstartedsigned off?
  2. 2025
    D25A/0253/WEB · permission is sought · approved 2025 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas5Adelaide Road; Croswaite Park
Radon grid squares1
Protected buildings36Glengara Park House; Traverslea House
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, Records of Protected Structures · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 95–100% by type. A new house in a garden is harder: 75% approved, and 1 in 6 is asked for more information.

Single-storey rear108 decided · more info asked 15%
99% · council 96%
Two-storey rear72 decided · more info asked 12%
99% · council 92%
Two-storey side26 decided · more info asked 15%
100% · council 95%
Single-storey side21 decided · more info asked 14%
95% · council 96%
Attic or dormer198 decided · more info asked 7%
95% · council 94%
First-floor46 decided · more info asked 4%
96% · council 90%
Garage conversion26 decided · more info asked 8%
100% · council 99%
Porch or front20 decided · more info asked 5%
95% · council 98%
New house in a garden or site60 decided · more info asked 17%
75% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 577 nearby, 3,892 council-wide

Figure 3

Silchester Park, file by file since 2021

22 of 22 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

32 planning files on Silchester Park since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 144 · 2021 · side · approved · D21B/0448No. 8 · 2021 · side · approved · D21B/0449No. 109 · 2022 · single-storey rear · approved · D22A/0043No. 74 · 2022 · attic conversion / dormer · approved · D22A/0343No. 8 · 2022 · attic conversion / dormer · approved · D22B/0157No. 40 · 2023 · garage conversion · approved · D23A/0219No. 128 · 2023 · two-storey side · approved · D23A/0571No. 116 · 2023 · attic conversion / dormer · approved · D23A/0790No. 54 · 2023 · first-floor · approved · D23B/0299No. 135 · 2023 · single-storey rear · approved · D23B/0386No. 39 · 2023 · garage conversion · approved · D23B/0481No. 29 · 2024 · two-storey rear · approved · D24A/0098No. 23 · 2024 · single-storey rear · approved · D24A/0315/WEBNo. 84 · 2024 · single-storey rear · approved · D24A/0594/WEBNo. 69 · 2024 · first-floor · approved · D24A/0631/WEBNo. 116 · 2024 · attic conversion / dormer · approved · D24A/0712/WEBNo. 89 · 2024 · rear · approved · D24A/0827No. 69 · 2024 · garage conversion · approved · D24B/0008No number · 2025 · rear · approved · D25B/0624/WEBNo. 112 · 2026 · attic conversion / dormer · approved · D26A/0023/WEBNo. 61 · 2026 · attic conversion / dormer · approved · D26A/0388/WEBNo. 28 · 2026 · attic conversion / dormer · undecided · D26A/0800/WEBNo. 96 · 2026 · attic conversion / dormer · approved · D26B/0150/WEBPorches, roofs, otherNo. 76 · 2021 · other work · approved · D21A/0963No. 48 · 2021 · other work · approved · D21B/0452No. 43 · 2023 · other extension · approved · D23B/0148No. 138 · 2024 · attic conversion / dormer · approved · D24A/0344/WEBNo. 112 · 2025 · other work · approved · D25A/0253/WEBNo. 85 · 2026 · other work · withdrawn or invalid · D26A/0156/WEBNo. 85 · 2026 · other work · approved · D26A/0161/WEBNo. 29 · 2026 · other work · approved · D26B/0289/WEBNew house in a side gardenNo. 119 · 2025 · new house · approved · D25A/0272/WEB119
ApprovedRefusedWithdrawn or invalid

32 files with "Silchester Park" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 6 within 250 m · 0 refused within 100 m

Extensions and refusals near you 6 extensions within 250 m · the last 12 months

5 of 5 approved (100%) · most common: dormer or attic

5 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic43—
Garden room11—
Two-storey rear11—

On Silchester Park: 31 extensions in 10 years, 98% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days. 1 in 9 is asked for more information, which adds about 63 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 9): 115 days; Appeal window: 4 weeks; If appealed: +182 days; Building starts: 160 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 49–54 (n=576)51 daysIf more info asked (1 in 9)With further information: median 115 days (n=69)115 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 182 days (n=146, all appeals within 1.5 km)+182 daysBuilding startsStart notice: median 160 days after permission (n=322)160 days after permissionSigned off443 days after the start, for the few who file. 63% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated645 decided home extensions, 329 start notices, 146 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    22 of 53 appealed refusals became permissions. 9 of 97 appealed approvals were reversed.

    Refusals appealed53 decided
    22 became permissions
    Approvals appealed97 decided
    9 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 4 in the last 12 months

    None of 3 changed the council's decision

    • 501540 Granted · 1, Silchester Downs, Glenageary, Co. Dublin, A96 C3V6. · 262 m
    • 501102 Granted · Kanta, 5 Silchester Crescent, Glenageary, Co. Dublin, A96D5K3 · 182 m report
    • 501696 Pending · Site known as Arva, No. 137 Glenageary Road Upper, Co. Dublin · 174 m
    • 500794 Granted · 39, Silchester Road, Glenageary, Co. Dublin, A96R6C5 · 252 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Silchester Park, Glenagarey with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingAppealBuilding startedEmpty land zoned for homesApproved
    1. 128, Silchester Park D26A/0800/WEBNo decision yet · 70 m
    2. 2Tanglewood, Silchester Road D26A/0754/WEBNo decision yet · 227 m
    3. 38 Claremont Villas, Adelaide Road D26A/0751/WEBNo decision yet · 372 m
    4. 4St Ann's, 32 Marlborough Road D26A/0780/WEBNo decision yet · 421 m
    5. 542, Glengara Park D26B/0459/WEBRefused · 373 m
    6. 6Site known as Arva, No. 137 Glenageary Road Upper 501696Appeal: no decision yet · 174 m
    7. 7Kanta, 5 Silchester Crescent 501102Appeal: approved · 182 m
    8. 885 Silchester Park, Dublin D26A/0161/WEBBuilding started · 162 m
    9. 90.5 ha zoned for homesEmpty land zoned for homes · 410 m
    10. 10112 Silchester Park, Glenageary D26A/0023/WEBApproved · 5 m
    11. 1196, Silchester Park D26B/0150/WEBApproved · 52 m
    12. 1229, Silchester Park D26B/0289/WEBApproved · 80 m
    13. 1361, Silchester Park D26A/0388/WEBApproved · 149 m
    14. 14Rathbarry, Silchester Road D25A/0992/WEBApproved · 182 m
    15. 15Site to rear of "Athassel", 35 Silchester Road D26A/0585/WEBApproved · 234 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 142 permissions since 2016, 71 show a start notice and 4 have a completion certificate. Most owners opt out of sign-off.

    181 applications lodged within 500 m. Council: 139 approved, 17 refused. After appeals: 142 approved. Of those: 4 signed off, 47 built with the owner's opt-out, 20 started, 69 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT139: lodged → approved17: lodged → refused16: lodged → withdrawn or invalid9: lodged → undecided136: approved → approved11: refused → refused16: withdrawn or invalid → withdrawn9: undecided → undecided1 approved by the council, undecided after an appeal2 approved by the council, withdrawn or invalid after an appeal6 refused by the council, approved after an appeal69: approved → no start notice found47: approved → built, owner opted out20: approved → started, not signed off4: approved → signed off2: approved → ran out181 lodged181 lodged139 approved139 approved17 refused17 refused16 withdrawn or invalid16 withdrawn or invalid9 undecided9 undecided142 approved142 approved11 refused11 refused18 withdrawn18 withdrawn10 undecided10 undecided69 no start notice found69 no start notice found47 built, owner opted out47 built, owner opted out20 started, not signed off20 started, not signed off4 signed off4 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured181 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    6 deadlines within 500 m; the first closes 4 Nov 2026.

    6 deadlines in the next 30 days: 2026-11-04 D26B/0459/WEB: REFUSE PERMISSION — Layout Alterations, Extension, Upgrade and Associated site works including; Eli; 2026-11-11 D26A/0751/WEB: application received — The development will consist of the installation of photovoltaic (PV) solar pane; 2026-11-12 D26A/0754/WEB: application received — Removal of a boiler house to the side, enlarging an existing window opening to t; 2026-11-13 ACP 501540: Grant permission; 2026-11-19 D26A/0780/WEB: application received — (i) the removal of a non-original single storey extension (32 sqm) to the side, other non-original single storey extensi; 2026-11-27 D26A/0800/WEB: application received — Permission is sought for an extension to a semi-detached dwelling. The development will consist of demolition of - garagtoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecD26B/0459/WEB: REFUSE PERMISSION — Layout Alterations, Extension, Upgrade and Associated site works including; Eli · 373 m away · 2026-11-04D26A/0751/WEB: application received — The development will consist of the installation of photovoltaic (PV) solar pane · 372 m away · 2026-11-11D26A/0754/WEB: application received — Removal of a boiler house to the side, enlarging an existing window opening to t · 227 m away · 2026-11-12ACP 501540: Grant permission · 262 m away · 2026-11-13D26A/0780/WEB: application received — (i) the removal of a non-original single storey extension (32 sqm) to the side, other non-original single storey extensi · 421 m away · 2026-11-19D26A/0800/WEB: application received — Permission is sought for an extension to a semi-detached dwelling. The development will consist of demolition of - garag · 70 m away · 2026-11-27
    Comments closeTime to appeal endsHigh Court window ends
    • Time to appeal ends 4 Nov 20263 days left
      5D26B/0459/WEB · REFUSE PERMISSION — Layout Alterations, Extension, Upgrade and Associated site works including; Eli
      €220 to An Coimisiún Pleanála (€110 observer) · 373 m away
    • Comments close 11 Nov 202610 days left
      3D26A/0751/WEB · application received — The development will consist of the installation of photovoltaic (PV) solar pane
      €20 to the council · 372 m away
    • Comments close 12 Nov 202611 days left
      2D26A/0754/WEB · application received — Removal of a boiler house to the side, enlarging an existing window opening to t
      €20 to the council · 227 m away
    • Time to ask the High Court for a review ends 13 Nov 202612 days left
      Grant permission
      262 m away
    • Comments close 19 Nov 202618 days left
      4D26A/0780/WEB · application received — (i) the removal of a non-original single storey extension (32 sqm) to the side, other…
      €20 to the council · 421 m away
    • Comments close 27 Nov 202626 days left
      1D26A/0800/WEB · application received — Permission is sought for an extension to a semi-detached dwelling. The development will consist…
      €20 to the council · 70 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 1 within 500 m

    Empty land zoned for homes 1

    • 90.5 ha zoned for homes · no homes built on it yet · 410 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 23 and 31 a year; busiest 2022. 89% of decisions were approvals.

    2021: 35, 2022: 31, 2023: 23, 2024: 28, 2025: 26, 2026: 380102030402021: 26 approved2021: 8 refused2021: 1 withdrawn or invalid35’21*2022: 28 approved2022: 2 withdrawn or invalid2022: 1 undecided31’222023: 20 approved2023: 1 refused2023: 2 withdrawn or invalid23’232024: 22 approved2024: 1 refused2024: 5 withdrawn or invalid28’242025: 22 approved2025: 4 refused26’252026: 21 approved2026: 3 refused2026: 6 withdrawn or invalid2026: 8 undecided38’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 50 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 14 in the last 12 months
    1 not signed off13 no sign-off needed
    • Glenageary Avenue, Dublin · 27 Oct 2026 · 4 homes · 7-day notice not signed off · LRD26A/0418/WEB & LRD25A/0512/WEB · 433 m
    • Glenageary Road Lower, Dublin · 8 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0816/WEB · 402 m
    • 11 Kilcolman Court, Dublin · 7 Oct 2026 · 1 homes · short notice no sign-off needed · D26B/0259 · 472 m
    • 39 Silchester Road, Dublin, A96 R6C5 · 7 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0652/WEB · 281 m
    • 8 Claremont Villas, Dublin, A96 P8P3 · 28 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0963/WEB · 387 m
    • 50 Glengara Park, Dublin, A96 X4D8 · 7 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · D23A/0462 · 468 m
    • 885 Silchester Park, Dublin, A96 Y9T1 · 31 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0161/WEB · 162 m
    • 12 Beechwood Park, Dublin, A96 X4F8 · 3 Aug 2026 · 1 homes · short notice no sign-off needed · D26B/0226/WEB · 467 m
    • 12 Beechwood Park, Dublin, A96 X4F8 · 3 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0089/WEB · 467 m
    • 55 Eden Villas, Dublin, A96 NP80 · 17 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0708/WEB · 414 m
    • 3 Beechwood Grove, Dublin, Dún Laoghaire-Rathdown, A96 RX47 · 27 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0420/WEB · 435 m
    • Silchester Park, Dublin, Dún Laoghaire-Rathdown, A96E6V6 · 15 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0624/WEB · 267 m
    • 75 Eden Villas, Dublin, Dún Laoghaire-Rathdown, A96 XW83 · 25 Feb 2026 · 1 homes · short notice no sign-off needed · D23A/0739 & D25B/0543/WEB · 470 m
    • 4 Marlborough Park, Dublin, Dún Laoghaire-Rathdown, A96 W6K6 · 23 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0793/WEB · 353 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 0 not started
    • 58-59 Patrick Street, Dún Laoghaire, Co. Dublin · Completed · 8 homes · 228 m
    • Boylan Centre, Boylan Road, Dún Laoghaire, County Dublin · Stage 2 pre planning · 59 homes · 228 m
    • Cross Avenue, Dún Laoghaire, Co. Dublin · Stage 3 pre tender design · 4 homes · 228 m
    • Sussex Street, Dún Laoghaire, Co. Dublin (Phase 1)* · Completed · 10 homes · 228 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Silchester Park · 46 applications in 10 years · 98% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Arva2727 not started (2026-Q1)174 m
    Arva, 137 Glenageary Road Upper32— (2026-Q2)174 m
    Sallynoggin Road and Glenageary Avenue and Glenageary Rounda——397 m
    Sallynoggin Road——397 m
    Junction of Sallynoggin Road Lower and Glenageary Avenue——408 m
    St. Josephs, Tivoli Road2424 not started (2026-Q2)770 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Magical Days · Crèche3 Mar 2026 · report · Tusla Early Years Inspectorate306 m
    Rathdown Pre- School Service · Crèche8 Oct 2024 · report · Tusla Early Years Inspectorate500 m
    Sharavogue School · Crèche13 May 2026 · report · Tusla Early Years Inspectorate532 m
    The Magic Roundabout · Crèche21 Apr 2026 · report · Tusla Early Years Inspectorate573 m
    Glenageary Montessori School · Crèche10 Mar 2026 · report · Tusla Early Years Inspectorate726 m
    Blue Stars Early Years Services · Crèche6 Mar 2024 · report · Tusla Early Years Inspectorate780 m
    Kildarton Specialised Preschool · Crèche19 Sept 2024 · report · Tusla Early Years Inspectorate878 m
    DJ's Playschool · Crèche26 Sept 2024 · report · Tusla Early Years Inspectorateapprox. 899 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here293
    Council middle44
    Homes started
    Here280
    Council middle92
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    95% of homes built before 1971 (council 38%). 92% owner-occupied (council 68%).

    Homes built before 1971
    95% · council 38%
    Homes built since 2001
    2% · council 25%
    Owner-occupied
    92% · council 68%
    Rented
    7% · council 29%
    Children under 15
    21% · council 18%
    Aged 65 and over
    17% · council 17%
    Households with 2+ cars
    63% · council 39%
    Work mainly from home
    28% · council 19%
    This small area (267 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267068011

    Bus
    291 m
    Silchester Park · 45A, 45B, 7 · busiest stop within 500 m: 7 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    309 m
    Carmona Special National School, 37 pupils
    Homes sold nearby
    1060
    in 3 years, 56 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Carmona Special National School · primary · 37 pupils · 309 m
    • Rathdown School · postprimary · 364 pupils · 500 m
    • Sallynoggin Educate Together National School · primary · 45 pupils · 653 m
    • The Harold School · primary · 642 pupils · 660 m
    • Holy Child Community School · postprimary · 275 pupils · 681 m
    • Dalkey School Project · primary · 220 pupils · 706 m
    • St Kevins NS · primary · 229 pupils · 715 m
    • St Josephs · primary · 370 pupils · 898 m

    Stops 39

    • Silchester Park · 45A, 45B, 7, 7A, 7D, 7n · 7/hour at peak · 291 m
    • Holmston Avenue · 45A, 45B, 7, 7A, 7D, 7E · 7/hour at peak · 338 m
    • Glenageary Avenue · 7 · 2/hour at peak · 400 m
    • Glenageary Park · 7 · 2/hour at peak · 411 m
    • Crosthwaite Park · 45A, 45B, 7, 7A, 7D, 7E · 7/hour at peak · 418 m
    • Greythorn Park · 111 · 1/hour at peak · 456 m
    • Sallynoggin Road · 111, 45A, 45B, 7A, 7n · 6/hour at peak · 474 m
    • Traverslea Close · 45A, 45B, 7, 7A, 7D, 7n · 7/hour at peak · 492 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Carmona Special National School · 309 m0% pupils (37)
    • Rathdown School · 500 m+4.3% pupils (364) · an extension 2026, approved
    • Sallynoggin Educate Together National School · 653 m+15.4% pupils (45)
    • The Harold School · 660 m-1.1% pupils (642)
    • Holy Child Community School · 681 m0% pupils (275)
    • Dalkey School Project · 706 m-1.8% pupils (220) · an extension 2026, approved

    Council meetings 16 items

    Public land

    • Dún Laoghaire-Rathdown County Council · 0.85 ha · 355 m
    • Dún Laoghaire-Rathdown County Council · 0.88 ha · 395 m
    • An Post · 0.17 ha · 424 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Alterations (D26A/0023/WEB): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    2. Permission is sought (D25A/0253/WEB) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    3. Application 70 m away open for comments until 27 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Glenagarey
    Electoral division
    Dun Laoghaire-Glasthule
    Electoral area
    Dún Laoghaire
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest D26A/0023/WEB, approved 2026, work already done.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 1 site nearby could change: 1 empty zoned plot.
    • 4 applications open for comments nearby; nearest closes 27 Nov 2026.
    • Silchester Park (bus 45A, 45B) 291 m away: 7 an hour at morning peak; 40 from all stops within 500 m.
    • Here (2022 census): 92% owner-occupied (council 68%); 4% of homes empty (council 6%); most built 1946–1960; 34% drive to work (council 43%); population up 6% since 2016.
    • 6 home extensions within 250 m since 2025: 5 approved (100%). Most were dormers or attic conversions. On Silchester Park: 31 in 10 years, 98% approved.
    • Around here the council decides in a median 51 days (about 7 weeks); 1 in 17 is asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 08:15 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.