PlanningRegister.ie
Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 5 Nov 2026, 07:51

Watermeadow Drive

53.28129, -6.36659

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (98%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Watermeadow DriveBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2022: 1 file on Watermeadow Drive2023: 1 file on Watermeadow Drive2024: 1 file on Watermeadow Drive2025: 1 file on Watermeadow Drive4 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Henkel Ireland Operations and Research Ireland Limited (Tallaght) (677 m); licence W0297 (748 m); licence P0114 (923 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Radon grid squares1
Monuments1R149381
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Sites and Monuments Record · fetched 2 Nov 2026, 23:44
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.02 Nov 2026, 23:44open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 94–100% by type. A new house in a garden is harder: 65% approved, and 1 in 2 is asked for more information.

Single-storey rear31 decided · more info asked 32%
94% · council 96%
Attic or dormer75 decided · more info asked 13%
99% · council 98%
Garage conversion10 decided · more info asked 30%
100% · council 99%
Porch or front12 decided · more info asked 25%
100% · council 96%
New house in a garden or site17 decided · more info asked 41%
65% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 145 nearby, 2,442 council-wide

Figure 3

Watermeadow Drive, file by file since 2022

1 of 1 decided extensions on the road were approved.

4 planning files on Watermeadow Drive since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 28 · 2025 · garage conversion · approved · SD25B/0572WPorches, roofs, otherNo. 1 · 2022 · other work · refused · SD22A/0005No. 1 · 2023 · other work · refused · SD23A/0217No. 1 · 2024 · other work · approved · SD24A/0228New house in a side garden
ApprovedRefusedWithdrawn or invalid

4 files with "Watermeadow Drive" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

1 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic11—
Single-storey rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 4 is asked for more information, which adds about 74 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 4): 132 days; Appeal window: 4 weeks; If appealed: +120 days; Building starts: 158 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 51–55 (n=136)55 daysIf more info asked (1 in 4)With further information: median 132 days (n=49)132 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 120 days (n=22, all appeals within 1.5 km)+120 daysBuilding startsStart notice: median 158 days after permission (n=60)158 days after permissionSigned off493 days after the start, for the few who file. 48% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated186 decided home extensions, 63 start notices, 22 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 10 appealed refusals became permissions. 1 of 13 appealed approvals were reversed.

    Refusals appealed10 decided
    1 became permissions
    Approvals appealed13 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501552 Open · Old Bawn Way, Tallaght, Co.Dublin · 329 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around Watermeadow Drive with 15 numbered planning items
    ⌖ the houseDerelict buildingBuilding startedOtherNo decision yetApprovedRefused
    1. 1Sites at 10 & 11 Old Bawn Road, Tallaght 1940Derelict building · 479 m
    2. 222 Old Bawn Avenue, Dublin 24 SD25B/0013WBuilding started · 100 m
    3. 364 Tymon Crescent, Tallaght SD24B/0585WBuilding started · 163 m
    4. 422, Cul Na Greine ED26/0032Section 5: exempt · 202 m
    5. 518, Rosebank SD26B/0317WNo decision yet · 209 m
    6. 655, Old Bawn Way SD25B/0679WApproved · 246 m
    7. 7104, St Maelruan’s Park SD26B/0301WApproved · 294 m
    8. 823 Pine Lawn, Old Bawn SD26B/0188WApproved · 301 m
    9. 932 Tymon Crescent, Old Bawn SD26B/0271WApproved · 312 m
    10. 10Sean Walsh Park, Tallaght PT8SD331No decision yet · 320 m
    11. 11Dún An Óir, Old Bawn SD26B/0141WApproved · 322 m
    12. 12Old Bawn Way, Tallaght SD26A/0079WRefused · 329 m
    13. 1326, Cois Na hAbhann SD25A/0295WRefused · 362 m
    14. 14Tallaght Stadium, Whitestown Way SDOEL26/01Approved · 374 m
    15. 15SDCC Lands @28 Locations PT8SD422No decision yet · 441 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 58 permissions since 2016, 22 show a start notice and 2 have a completion certificate. Most owners opt out of sign-off.

    83 applications lodged within 500 m. Council: 57 approved, 11 refused. After appeals: 58 approved. Of those: 2 signed off, 12 built with the owner's opt-out, 8 started, 36 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT57: lodged → approved11: lodged → refused10: lodged → withdrawn or invalid5: lodged → undecided57: approved → approved10: refused → refused10: withdrawn or invalid → withdrawn5: undecided → undecided1 refused by the council, approved after an appeal36: approved → no start notice found12: approved → built, owner opted out8: approved → started, not signed off2: approved → signed off83 lodged83 lodged57 approved57 approved11 refused11 refused10 withdrawn or invalid10 withdrawn or invalid5 undecided5 undecided58 approved58 approved10 refused10 refused10 withdrawn10 withdrawn5 undecided5 undecided36 no start notice found36 no start notice found12 built, owner opted out12 built, owner opted out8 started, not signed off8 started, not signed off2 signed off2 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured83 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 1 within 500 m

      Derelict building 1

      • 1Sites at 10 & 11 Old Bawn Road, Tallaght · derelict since Oct 2024 · 479 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
      Council meetings (ModernGov)Public5 Nov 2026, 02:33open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
      Figure 8

      Applications within 500 m, by year

      Between 13 and 19 a year; busiest 2025. 84% of decisions were approvals.

      2021: 11, 2022: 13, 2023: 14, 2024: 16, 2025: 19, 2026: 10051015202021: 9 approved2021: 1 refused2021: 1 withdrawn or invalid11’21*2022: 7 approved2022: 1 refused2022: 4 withdrawn or invalid2022: 1 undecided13’222023: 11 approved2023: 2 refused2023: 1 withdrawn or invalid14’232024: 13 approved2024: 3 refused16’242025: 12 approved2025: 3 refused2025: 3 withdrawn or invalid2025: 1 undecided19’252026: 5 approved2026: 1 refused2026: 1 withdrawn or invalid2026: 3 undecided10’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 14 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Building work nearby 8 in the last 12 months
      8 no sign-off needed
      • 32 Tymon Crescent, Dublin 24, Dublin, D24 N5RK · 2 Oct 2026 · start notice, opted out no sign-off needed · SD26B/0271W · 325 m
      • 222 Old Bawn Avenue, Dublin 24, Dublin, D24 NC5F · 8 Jun 2026 · short notice no sign-off needed · SD25B/0013W · 100 m
      • 55 Old Bawn Way, Old Bawn, South Dublin, D24 YKV0 · 25 May 2026 · start notice, opted out no sign-off needed · SD25B/0679W · 259 m
      • 364 Tymon Crescent, Tallaght, South Dublin, D24 PNH5 · 8 May 2026 · start notice, opted out no sign-off needed · SD24B/0585W · 163 m
      • 8 Old Bawn Avenue, Tallaght, South Dublin, D24 DDC2 · 23 Mar 2026 · short notice no sign-off needed · SD25B/0391W · 149 m
      • 115 Saint Maelruan's Park, South Dublin, D24 N1WK · 15 Mar 2026 · start notice, opted out no sign-off needed · SD25B/0294 · 288 m
      • 107 Watergate, Dublin 24, South Dublin, D24 TX4Y · 2 Mar 2026 · short notice no sign-off needed · SD24B/0358 · 231 m
      • 26 Old Bawn Way, Tallaght, Dublin 24, South Dublin, D24 Y03K · 12 Nov 2025 · start notice, opted out no sign-off needed · SD25B/0435W · 318 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Sean Walsh Park——320 m
      SDCC Lands @28 Locations——441 m
      D24 Neighbourhood——488 m
      Whitestown and Killinarden——511 m
      Whitestown Way Development169—545 m
      Tallaght Village Enhancement Scheme——668 m
      Belgard Road10—716 m
      Belgard Square East199—717 m

      Who applies most nearby

      Crèches and schools inspected

      NameLatest inspectionDistance
      Mary’s House Tallaght · Crèche9 May 2024 · report · Tusla Early Years Inspectorate495 m
      Starlight Preschool · Crèche24 Feb 2025 · report · Tusla Early Years Inspectorate553 m
      Daisy Chain Playgroup · Crèche13 Sept 2024 · report · Tusla Early Years Inspectorate553 m
      Once Upon A Time · Crèche2 Jun 2026 · report · Tusla Early Years Inspectorate699 m
      Barnardos Child & Family Service Millbrook · Crèche9 Jun 2025 · report · Tusla Early Years Inspectorate839 m
      Tallaght Child Care Centre · Crèche24 Jul 2024 · report · Tusla Early Years Inspectorate839 m
      Oakview Village Tallaght · Crèche25 Feb 2026 · report · Tusla Early Years Inspectorate946 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.02 Nov 2026, 23:01open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Applicant organisations (from the CRO)Derived by Planning Register1 Nov 2026, 23:02—
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register4 Nov 2026, 23:36open
      How busy is this area About as busy as most of South Dublin County Council.
      Homes approved
      Here390
      Council middle0
      Homes started
      Here7
      Council middle4
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      89% owner-occupied (council 67%).

      Homes built before 1971
      19% · council 18%
      Homes built since 2001
      2% · council 27%
      Owner-occupied
      89% · council 67%
      Rented
      8% · council 29%
      Children under 15
      18% · council 21%
      Aged 65 and over
      26% · council 13%
      Households with 2+ cars
      50% · council 40%
      Work mainly from home
      14% · council 10%
      This small area (312 people)South Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267146006

      Bus
      484 m
      Aylesbury Shop Cntr · 49n, 65B, 77X · busiest stop within 500 m: 6 an hour at peak
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Flood
      Within 500 m
      OPW flood map area, not beside the house
      Nearest school
      366 m
      Old Bawn Community School, 1024 pupils
      Homes sold nearby
      30
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Old Bawn Community School · postprimary · 1024 pupils · 366 m
      • Scoil Maelruain Junior · primary · 369 pupils · 436 m
      • Scoil Maelruain Senior · primary · 386 pupils · 469 m
      • St Martin De Porres NS · primary · 383 pupils · 767 m
      • St Dominic's National School · primary · 410 pupils · 802 m

      Stops 47

      • Aylesbury Shop Cntr · 49n, 65B, 77X, F1 · 6/hour at peak · 484 m
      • Aylesbury Shop Cntr · 49n, 65B, F1 · 4/hour at peak · 502 m
      • Old Bawn Ct · 49n, 77A, S6, S8 · 10/hour at peak · 503 m
      • Old Bawn Rd · 49n, 77A, S6, S8, SD3, SD4 · 10/hour at peak · 513 m
      • Old Bawn Rd · 77A, S6, S8, SD3, SD4, UM08 · 13/hour at peak · 513 m
      • St Maelruan's Park · 77A, S6, S8, SD3, SD4 · 13/hour at peak · 541 m
      • St Maelruan's Park · 49n, 77A, S6, S8, SD3, SD4 · 10/hour at peak · 545 m
      • Tallaght Stadium · F1 · 4/hour at peak · 573 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Old Bawn Community School · 366 m-0.8% pupils (1,024) · a pitch or play area 2026, approved
      • Scoil Maelruain Junior · 435 m-2.6% pupils (369)
      • Scoil Maelruain Senior · 469 m-0.5% pupils (386)
      • St Martin De Porres NS · 767 m-2.8% pupils (383)
      • St Dominic's National School · 802 m-0.2% pupils (410)

      Council meetings 30 items

      Public land

      • Dublin City Council · 0.4 ha · 198 m
      • Dublin City Council · 1.58 ha · 215 m
      • Dublin City Council · 0.87 ha · 239 m
      • South Dublin County Council · 0.85 ha · 252 m
      • Dublin City Council · 0.3 ha · 258 m
      • The Minister for Education and Skills · 3.41 ha · 267 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Council consultation portalsPublic5 Nov 2026, 01:15open
      Council meetings (ModernGov)Public5 Nov 2026, 02:33open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Building work started 100 m away: for how long?
        Ask for: The planning conditions for SD25B/0013W.
        Agent · council
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Oldbawn
      Electoral division
      Tallaght-Oldbawn
      Electoral area
      Tallaght Central
      Council
      South Dublin County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 1 site nearby could change: 1 derelict.
      • Aylesbury Shop Cntr (bus 49n, 65B) 484 m away: 6 an hour at morning peak.
      • Here (2022 census): 89% owner-occupied (council 66%); 3% of homes empty (council 4%); most built 1971–1980; 61% drive to work (council 54%); population down 3% since 2016.
      • 2 home extensions within 250 m since 2025.
      • The council decides in a median 55 days (about 8 weeks); 1 in 5 is asked for more information.
      • 14 applications nearby in the last 12 months; 75% approved (council 88%).
      • Old Bawn Community School, 366 m away: a pitch or play area approved (2026).
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 32
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
      www2.courts.ie—© the publisher4 Nov 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.02 Nov 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.02 Nov 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
      organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register1 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 5 Nov 2026, 07:51 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.