Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 06:33

Cedar Road

53.28152, -6.22508

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (94%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 5 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Radon grid squares10
Protected buildings1Hazelwood House (Saint Beneldus School)
Monuments2Castle - tower house; R149394
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Records of Protected Structures, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 79–100% by type. A new house in a garden is harder: 76% approved, and 1 in 3 is asked for more information.

Single-storey rear59 decided · more info asked 12%
95% · council 96%
Two-storey rear19 decided · more info asked 21%
79% · council 92%
Single-storey side21 decided · more info asked 14%
95% · council 96%
Attic or dormer173 decided · more info asked 10%
94% · council 94%
First-floor24 decided · more info asked 12%
83% · council 90%
Garage conversion29 decided · more info asked 10%
100% · council 99%
Porch or front11 decided · more info asked 0%
100% · council 98%
New house in a garden or site21 decided · more info asked 33%
76% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 357 nearby, 3,744 council-wide

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

3 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic21—
Single-storey rear11—
Two-storey rear11—

On Wedgewood: 16 extensions in 10 years, 89% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 52 days. 1 in 7 is asked for more information, which adds about 52 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 7): 104 days; Appeal window: 4 weeks; If appealed: +120 days; Building starts: 116 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–54 (n=353)52 daysIf more info asked (1 in 7)With further information: median 104 days (n=56)104 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 120 days (n=58, all appeals within 1.5 km)+120 daysBuilding startsStart notice: median 116 days after permission (n=194)116 days after permissionSigned off376 days after the start, for the few who file. 58% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated409 decided home extensions, 195 start notices, 58 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    10 of 16 appealed refusals became permissions. 3 of 42 appealed approvals were reversed.

    Refusals appealed16 decided
    10 became permissions
    Approvals appealed42 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501271 Withdrawn · Saint Benildus College, Kilmacud Road Upper, Stillorgan, Dublin,… · 195 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Cedar Road with 15 numbered planning items
    ⌖ the houseOpen for commentsRefusedEmpty land zoned for homesNo decision yetApproved
    1. 1Saint Martin De Porres, Kilmacud Road Upper D26A/0724/WEBNo decision yet · 479 m
    2. 211, Lakelands Grove D26B/0536No decision yet · 484 m
    3. 3Saint Benildus College, Kilmacud Road Upper D26A/0157/WEBRefused · 195 m
    4. 40.3 ha zoned for homesEmpty land zoned for homes · 488 m
    5. 5National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area PC/IC/01/26No decision yet · 137 m
    6. 6207, Apples Road D25B/0666/WEBApproved · 192 m
    7. 755, Balally Avenue D26B/0393/WEBApproved · 204 m
    8. 8Department Of Education And Youth, Saint Benildus College D26A/0479/WEBApproved · 212 m
    9. 9193, Apples Road D26B/0129Approved · 232 m
    10. 1025, Balally Grove D21B/0295/ERefused · 251 m
    11. 1118, Balally Grove D25B/0687/WEBApproved · 276 m
    12. 1226, Balally Avenue D25B/0669/WEBApproved · 330 m
    13. 1378 Lakelands Avenue, Stillorgan D26A/0119Approved · 381 m
    14. 1427, Balally Hill D26B/0006/WEBApproved · 391 m
    15. 15124 Holywell, Kilmacud Road Upper D26B/0026/WEBApproved · 392 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 72 permissions since 2016, 32 show a start notice and 1 has a completion certificate.

    92 applications lodged within 500 m. Council: 71 approved, 4 refused. After appeals: 72 approved. Of those: 1 signed off, 10 built with the owner's opt-out, 21 started, 40 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT71: lodged → approved4: lodged → refused13: lodged → withdrawn or invalid4: lodged → undecided71: approved → approved2: refused → refused13: withdrawn or invalid → withdrawn4: undecided → undecided1 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal40: approved → no start notice found10: approved → built, owner opted out21: approved → started, not signed off1: approved → signed off92 lodged92 lodged71 approved71 approved4 refused4 refused13 withdrawn or invalid13 withdrawn or invalid4 undecided4 undecided72 approved72 approved2 refused2 refused14 withdrawn14 withdrawn4 undecided4 undecided40 no start notice found40 no start notice found10 built, owner opted out10 built, owner opted out21 started, not signed off21 started, not signed off1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured92 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    2 deadlines within 500 m; the first closes 2 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-02 D26A/0724/WEB: application received — (a) subdivision of existing site, (b) construction of new detached 2-storey, 3; 2026-11-13 D26B/0536: application received — (1) a two-storey extension to the front, including a first-floor side extensiontoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecD26A/0724/WEB: application received — (a) subdivision of existing site, (b) construction of new detached 2-storey, 3 · 479 m away · 2026-11-02D26B/0536: application received — (1) a two-storey extension to the front, including a first-floor side extension · 484 m away · 2026-11-13
    Comments close
    • Comments close 2 Nov 20261 day left
      1D26A/0724/WEB · application received — (a) subdivision of existing site, (b) construction of new detached 2-storey, 3
      €20 to the council · 479 m away
    • Comments close 13 Nov 202612 days left
      2D26B/0536 · application received — (1) a two-storey extension to the front, including a first-floor side extension
      €20 to the council · 484 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 1 within 500 m

    Empty land zoned for homes 1

    • 40.3 ha zoned for homes · no homes built on it yet · 488 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 7

    Applications within 500 m, by year

    Between 9 and 18 a year; busiest 2025. 95% of decisions were approvals.

    2021: 18, 2022: 15, 2023: 9, 2024: 16, 2025: 18, 2026: 16051015202021: 17 approved2021: 1 refused18’21*2022: 12 approved2022: 3 withdrawn or invalid15’222023: 9 approved9’232024: 12 approved2024: 4 withdrawn or invalid16’242025: 13 approved2025: 1 refused2025: 4 withdrawn or invalid18’252026: 8 approved2026: 2 refused2026: 2 withdrawn or invalid2026: 4 undecided16’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 27 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 9 in the last 12 months
    2 not signed off7 no sign-off needed
    • 193 Apples Road, Wedgewood, Dublin 16, D16 A4Y2., Dublin 16, Dublin, D16 A4Y2 · 21 Sept 2026 · 1 homes · short notice no sign-off needed · D26B/0129 · 244 m
    • 1-28 Sandyford Rd, Bidston Moss, Dundrum, Dublin, D16 T0V8 · 2 Jul 2026 · 7-day notice not signed off · 470 m
    • 26 Balally Avenue, Dublin 16, Dublin, D16 R862 · 29 Jun 2026 · short notice no sign-off needed · D25B/0669/WEB · 335 m
    • 18 Balally Grove, Dundrum, Dún Laoghaire-Rathdown, D16 ND73 · 8 Jun 2026 · 1 homes · short notice no sign-off needed · D25B/0687/WEB · 282 m
    • 1 Lakelands Close, Dublin, Dún Laoghaire-Rathdown, A94 YW88 · 4 May 2026 · short notice no sign-off needed · D25B/0574/WEB · 416 m
    • 207 Apples Road, Dublin, Dún Laoghaire-Rathdown · 26 Mar 2026 · 1 homes · short notice no sign-off needed · D25B/0666/WEB · 208 m
    • 138 Sandyford Road, Dundrum, Dún Laoghaire-Rathdown, D16 K702 · 9 Mar 2026 · 1 homes · short notice no sign-off needed · D25A/0864/WEB · 463 m
    • 181 Balally Drive, Dundrum, Dún Laoghaire-Rathdown, D16 KW40 · 22 Jan 2026 · short notice no sign-off needed · D25B/0542/WEB · 363 m
    • Balally Drive, Dublin, Dún Laoghaire-Rathdown, D16 E067 · 18 Dec 2025 · start notice not signed off · D23A/0022 · 143 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Wedgewood · 23 applications in 10 years · 89% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Site at Kilmacud Road Upper and Drummartin Link Road4747 built (2026-Q1)475 m
    Blackthorn Drive6262 not started (2026-Q2)498 m
    Balally——503 m
    Balally Shopping Centre——506 m
    Sandyford Industrial Estate8484 not started (2025-Q2)614 m
    development generally known as Rockbrook——655 m
    Blackthorn Drive and Carmanhall Road——655 m
    Allegro Site428428 being built (2026-Q2)655 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Bright Minds Childcare and Montessori School Ltd · Crèche8 Apr 2026 · report · Tusla Early Years Inspectorate120 m
    Narnia Nursery School Ltd · Crèche1 Feb 2024 · report · Tusla Early Years Inspectorate490 m
    Greentrees Park Montessori School · Crèche9 Sept 2025 · report · Tusla Early Years Inspectorate547 m
    Lakelands Childcare · Crèche28 Oct 2025 · report · Tusla Early Years Inspectorate607 m
    The Park Academy Beacon South Quarter · Crèche24 Mar 2026 · report · Tusla Early Years Inspectorate811 m
    Narnia Nursery School · Crèche11 Nov 2025 · report · Tusla Early Years Inspectorate865 m
    Busy Bees Childcare Hive Ltd · Crèche29 Sept 2025 · report · Tusla Early Years Inspectorate904 m
    Little Dale Academy · Crèche12 Jan 2026 · report · Tusla Early Years Inspectorate914 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here638
    Council middle44
    Homes started
    Here350
    Council middle92
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    9% of homes built before 1971 (council 38%). 84% owner-occupied (council 68%).

    Homes built before 1971
    9% · council 38%
    Homes built since 2001
    8% · council 25%
    Owner-occupied
    84% · council 68%
    Rented
    14% · council 29%
    Children under 15
    18% · council 18%
    Aged 65 and over
    18% · council 17%
    Households with 2+ cars
    24% · council 39%
    Work mainly from home
    12% · council 19%
    This small area (253 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267078009

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Luas
    168 m
    Kilmacud · Green · busiest stop within 500 m: 22 an hour at peak
    Radon
    1 in 5
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    145 m
    ST Olaf's National School, 591 pupils
    Homes sold nearby
    48
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • ST Olaf's National School · primary · 591 pupils · 145 m
    • St Benildus College · postprimary · 949 pupils · 426 m
    • Queen Of Angels Primary School · primary · 224 pupils · 582 m
    • St. Tiernan's Community School · postprimary · 368 pupils · 926 m
    • S N Cnoc Ainbhil · primary · 434 pupils · 985 m

    Stops 45

    • Kilmacud · Green · 22/hour at peak · 168 m
    • Kilmacud · Green · 19/hour at peak · 184 m
    • Ballawley Park · 116, 44, 44B · 2/hour at peak · 505 m
    • Sweet Briar Lane · L25 · 4/hour at peak · 507 m
    • Balally Hill · 116, 44, 44B · 2/hour at peak · 512 m
    • Hazel Villas · L25 · 4/hour at peak · 518 m
    • Lakelands Lawn · L25 · 4/hour at peak · 564 m
    • Dun Emer Road · 116, 44, 44B · 2/hour at peak · 574 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • ST Olaf's National School · 145 m+3.1% pupils (591)
    • St Benildus College · 426 m+2.6% pupils (949) · an extension 2026, no decision yet
    • Queen Of Angels Primary School · 582 m-11.1% pupils (224)
    • St. Tiernan's Community School · 926 m+0.3% pupils (368)
    • S N Cnoc Ainbhil · 985 m-1.4% pupils (434) · an extension 2026, refused · an extension 2025, approved with conditions

    Council meetings 1 items

    Public land

    • Dún Laoghaire-Rathdown County Council · 0.2 ha · 112 m
    • Railway Procurement Agency · 1.14 ha · 116 m
    • Dublin City Council · 5.44 ha · 170 m
    • Railway Procurement Agency · 0.12 ha · 172 m
    • Railway Procurement Agency · 0.82 ha · 197 m
    • Railway Procurement Agency · 0.43 ha · 199 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. High radon area (1 in 5 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    2. Application 479 m away open for comments until 2 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Balally
    Electoral division
    Dundrum-Balally
    Electoral area
    Dundrum
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
    • 1 site nearby could change: 1 empty zoned plot.
    • 2 applications open for comments nearby; nearest closes 2 Nov 2026.
    • Kilmacud (Luas Green) 168 m away: 22 an hour at morning peak; 41 from all stops within 500 m.
    • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 84% owner-occupied (council 68%); 6% of homes empty (council 6%); most built 1971–1980; 35% drive to work (council 43%); population up 10% since 2016.
    • 4 home extensions within 250 m since 2025. Most were dormers or attic conversions. On Wedgewood: 16 in 10 years, 89% approved.
    • Around here the council decides in a median 52 days (about 7 weeks); 1 in 6 is asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 06:33 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.