Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 9 Oct 2026, 02:00

Harbour Road, Sandycove

53.28518, -6.10941

Homes here mostly date from before 1919. 3 planning files on this house, the latest from 2026. Home extensions nearby almost always get approved (92%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 3 planning files on this house, the latest from 2026.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 3 planning files on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Harbour RoadBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2026: D26A/0328/WEB · extension, approved2016: D15A/0661 · extension, approved2015: D15B/0212 · extension, refused2002: 1 file on Harbour Road2004: 2 files on Harbour Road2005: 5 files on Harbour Road2006: 1 file on Harbour Road2007: 1 file on Harbour Road2008: 1 file on Harbour Road2010: 3 files on Harbour Road2011: 1 file on Harbour Road2012: 1 file on Harbour Road2013: 3 files on Harbour Road2014: 1 file on Harbour Road2015: 3 files on Harbour Road2017: 5 files on Harbour Road2018: 4 files on Harbour Road2019: 2 files on Harbour Road2020: 1 file on Harbour Road2021: 4 files on Harbour Road2022: 3 files on Harbour Road2023: 2 files on Harbour Road2024: 1 file on Harbour Road2025: 5 files on Harbour Road2026: 1 file on Harbour Road51 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    D26A/0328/WEB · extension · approved 2026 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2016
    D15A/0661 · extension · approved 2016 · ran out unbuilt
    approvedstartedsigned off
  3. 2015
    D15B/0212 · extension · refused 2015
    approvedstarted?signed off?
On this site
R2
Zoning · Existing residential
Yes
Protected or listed · inside the zone around a recorded monument (DU023-020003-)
No
Vacant land tax · lived-in homes don't pay it
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

Protected building1 within 100 m Bullock Castle
Monument zoneOn this site Well, Bullock; Gatehouse, Bullock
Radon1 in 5 homes have high radon (EPA)

Not on this site: heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas2Dalkey Village; Sandycove Point, Sandycove
Natural heritage areas1Dalkey Coastal Zone And Killiney Hill
Radon grid squares9
Protected buildings86Martello Tower (Joyce's Tower); House Terrace
Monuments9Martello tower; Settlement cluster
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: zoning, constraints.radon, constraints.smr, constraints.smr_zones, rps.dlr, rzlt, constraints, constraints.aca, constraints.nha, constraints.rps · fetched 4 Oct 2026, 23:11
SourceLicenceFetchedLink
zoningCC-BY-4.04 Oct 2026, 23:11open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
constraints.smr_zonesCC-BY-4.027 Sept 2026, 19:34open
rps.dlrCC-BY-4.0—open
rzltCC-BY-4.04 Oct 2026, 23:59open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.acaCC-BY-4.0 (Fingal); public/attribution, unconfirmed (DLR)27 Sept 2026, 19:36open
constraints.nhaCC-BY-4.027 Sept 2026, 19:27open
constraints.rpsCC-BY-4.0 (Fingal); public/attribution, unconfirmed (DLR)27 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 8 Oct 2026, 06:04
SourceLicenceFetchedLink
bcmsCC-BY-4.08 Oct 2026, 06:04open
npadCC-BY-4.09 Oct 2026, 01:41open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 85–100% by type. A new house in a garden is harder: 57% approved, and 1 in 4 is asked for more information.

Single-storey rear134 decided · more info asked 22%
98% · council 96%
Two-storey rear78 decided · more info asked 18%
92% · council 90%
Two-storey side43 decided · more info asked 21%
95% · council 94%
Single-storey side22 decided · more info asked 18%
95% · council 96%
Attic or dormer164 decided · more info asked 10%
90% · council 92%
First-floor75 decided · more info asked 13%
85% · council 89%
Garage conversion30 decided · more info asked 17%
93% · council 99%
Porch or front28 decided · more info asked 11%
100% · council 98%
New house in a garden or site77 decided · more info asked 27%
57% · council 62%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 651 nearby, 6,628 council-wide

Figure 3

Harbour Road, file by file since 2002

19 of 22 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

51 planning files on Harbour Road since 2002, by kind and decision.2002200420062008201020122014201620182020202220242026Extensions, atticsNo number · 2005 · single-storey rear · approved · D05A/1154No number · 2005 · other extension · approved · D05B/0158No number · 2005 · two-storey rear · approved · D05B/0360No number · 2005 · single-storey rear · approved · D05B/0390No number · 2006 · single-storey rear · approved · D06B/1004No number · 2007 · attic conversion / dormer · approved · D07B/0931No number · 2008 · single-storey rear · approved · D08B/0362No number · 2010 · single-storey rear · approved · D10A/0239No number · 2013 · rear · approved · D13A/0348No number · 2013 · garden room · approved · D13A/0438No number · 2014 · attic conversion / dormer · approved · D14A/0049No number · 2015 · two-storey rear · approved · D15A/0661No number · 2015 · other extension · approved · D15A/0681No number · 2015 · other extension · refused · D15B/0212No number · 2017 · garden room · refused · D17A/0138No number · 2017 · first-floor · refused · D17A/0941No number · 2018 · garden room · approved · D18A/0471No. 3 · 2018 · side · approved · D18B/0437No number · 2021 · attic conversion / dormer · approved · D21B/0193No. 3 · 2022 · single-storey rear · approved · D22B/0375No number · 2023 · attic conversion / dormer · approved · D23B/0275No number · 2025 · attic conversion / dormer · approved · D25B/0101Porches, roofs, otherNo number · 2002 · other work · approved · D02A/1086No number · 2004 · other work · approved · D04A/0094No. 10 · 2004 · other work · approved · D04A/1026No number · 2005 · other work · approved · D05A/0898No. 4 · 2010 · other work · withdrawn or invalid · D10A/0630No. 4 · 2011 · other work · refused · D11A/0012No. 10 · 2012 · other work · approved · D12A/0120No. 10 · 2013 · other work · refused · D13A/0214No. 715 · 2017 · other work · refused · D17A/0707No number · 2017 · other work · refused · D17A/0899No. 4 · 2018 · other work · approved · D18A/0480No number · 2018 · other work · approved · D18A/1031No. 1426 · 2019 · other work · approved · D19A/0284No number · 2019 · other work · approved · D19A/0401No number · 2020 · other work · approved · ABP30662620No. 06 · 2021 · other work · refused · D21A/0304No. 2 · 2021 · other work · refused · D21A/0501No number · 2021 · other work · withdrawn or invalid · D21B/0079No number · 2022 · other work · approved · D22A/0963No. 4 · 2022 · other work · refused · D22A/1015No number · 2023 · other work · refused · D23A/0352No number · 2024 · attic conversion / dormer · approved · D24B/0134No number · 2025 · other work · approved · D25A/0099/WEBNo number · 2025 · other work · withdrawn or invalid · D25A/0241/WEBNo number · 2025 · other work · approved · D25A/0260/WEBNo number · 2025 · other work · approved · D25A/0264/WEBNew house in a side gardenNo. 4 · 2010 · new house · withdrawn or invalid · D10A/06584No number · 2017 · new house · approved · D17A/0846No. 1 · 2026 · new house · approved · D26A/0328/WEB1
ApprovedRefusedWithdrawn or invalid

51 files with "Harbour Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2002–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 approved
KindAppliedApprovedRefused
First-floor22—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 9 Oct 2026, 01:41
    SourceLicenceFetchedLink
    npadCC-BY-4.09 Oct 2026, 01:41open
    acpCC-BY-4.02 Oct 2026, 23:01open
    Sources: acp, bcms, npad · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    bcmsCC-BY-4.08 Oct 2026, 06:04open
    npadCC-BY-4.09 Oct 2026, 01:41open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 6 is asked for more information, which adds about 61 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 6): 118 days; Appeal window: 4 weeks; If appealed: +140 days; Building starts: 158 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=605)53 daysIf more info asked (1 in 6)With further information: median 118 days (n=118)118 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 140 days (n=232, all appeals within 1.5 km)+140 daysBuilding startsStart notice: median 158 days after permission (n=373)158 days after permissionSigned off536 days after the start, for the few who file. 63% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated723 decided home extensions, 375 start notices, 232 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    58 of 109 appealed refusals became permissions. 7 of 130 appealed approvals were reversed.

    Refusals appealed109 decided
    58 became permissions
    Approvals appealed130 decided
    7 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months

    None of 1 changed the council's decision

    • 501154 Granted with conditions · 18, Hyde Park, Dalkey, County Dublin, A96D6C1 · 420 m report
    • 324395 Pending · grass verge on Breffni Road, Sandycove, Co. Dublin. · 105 m
    Sources: acp, courts, npad · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    courtsall-rights-reserved9 Oct 2026, 01:23open
    npadCC-BY-4.09 Oct 2026, 01:41open
    Question 4

    What's changing around you?

    Street map around Harbour Road, Sandycove with 15 numbered planning items
    ⌖ the houseOpen for commentsAppealBuilding startedOtherNo decision yetApproved
    1. 1Site to the side of "Park Lodge", No. 1 D26A/0713/WEBNo decision yet · 109 m
    2. 219, Hyde Park D26A/0703/WEBNo decision yet · 420 m
    3. 3grass verge on Breffni Road, Sandycove 324395Appeal: no decision yet · 105 m
    4. 41 Harbour Road, Dalkey D26A/0328/WEBBuilding started · 7 m
    5. 51 Castle Park Road, Dublin D26B/0124/WEBBuilding started · 135 m
    6. 61, Castlepark Road REF3926Section 5: awaiting decision · 105 m
    7. 71 Neptune Terrace, Breffni Road D26A/0558/WEBNo decision yet · 197 m
    8. 8Herbert Lodge, Hyde Road D26A/0550/WEBApproved · 283 m
    9. 9Sandycove House, Sandycove Road D26B/0278/WEBApproved · 308 m
    10. 10Newport, Ulverton Road D25A/0852/WEBApproved · 341 m
    11. 1112 Sandycove Avenue East, Dun Laoghaire D26A/0546/WEBApproved · 341 m
    12. 12Tower View, Sandycove Close D26A/0043/WEBApproved · 358 m
    13. 1342, Elton Park D25A/1001/WEBApproved · 363 m
    14. 14Lisheen, 15 Elton Park D26B/0218/WEBApproved · 375 m
    15. 1538, Sandycove Road D26A/0620/WEBNo decision yet · 378 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 176 permissions since 2016, 76 show a start notice and 8 have a completion certificate. Most owners opt out of sign-off.

    237 applications lodged within 500 m. Council: 173 approved, 37 refused. After appeals: 176 approved. Of those: 8 signed off, 50 built with the owner's opt-out, 18 started, 100 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT173: lodged → approved37: lodged → refused22: lodged → withdrawn or invalid5: lodged → undecided168: approved → approved27: refused → refused22: withdrawn or invalid → withdrawn5: undecided → undecided1 approved by the council, refused after an appeal4 approved by the council, withdrawn or invalid after an appeal8 refused by the council, approved after an appeal2 refused by the council, withdrawn or invalid after an appeal100: approved → no start notice found50: approved → built, owner opted out18: approved → started, not signed off8: approved → signed off237 lodged237 lodged173 approved173 approved37 refused37 refused22 withdrawn or invalid22 withdrawn or invalid5 undecided5 undecided176 approved176 approved28 refused28 refused28 withdrawn28 withdrawn5 undecided5 undecided100 no start notice found100 no start notice found50 built, owner opted out50 built, owner opted out18 started, not signed off18 started, not signed off8 signed off8 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured237 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 27 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-27 D26A/0703/WEB: application received — The development will consist of a part single storey, part two storey three bed; 2026-10-28 D26A/0713/WEB: application received — Permission for development at this site: Site to the side of “Park Lodge”. The dtoday14 Oct19 Oct24 Oct29 Oct3 Nov8 NovD26A/0703/WEB: application received — The development will consist of a part single storey, part two storey three bed · 420 m away · 2026-10-27D26A/0713/WEB: application received — Permission for development at this site: Site to the side of “Park Lodge”. The d · 109 m away · 2026-10-28
    Comments close
    • Comments close 27 Oct 202618 days left
      2D26A/0703/WEB · application received — The development will consist of a part single storey, part two storey three bed
      €20 to the council · 420 m away
    • Comments close 28 Oct 202619 days left
      1D26A/0713/WEB · application received — Permission for development at this site: Site to the side of “Park Lodge”. The d
      €20 to the council · 109 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 14 and 37 a year; busiest 2021. 82% of decisions were approvals.

    2016: 4, 2017: 26, 2018: 36, 2019: 14, 2020: 19, 2021: 37, 2022: 21, 2023: 21, 2024: 14, 2025: 21, 2026: 240102030402016: 1 approved2016: 3 refused4’16*2017: 20 approved2017: 4 refused2017: 2 withdrawn or invalid26’172018: 30 approved2018: 6 refused36’182019: 13 approved2019: 1 refused14’192020: 13 approved2020: 5 refused2020: 1 withdrawn or invalid19’202021: 29 approved2021: 7 refused2021: 1 withdrawn or invalid37’212022: 12 approved2022: 7 refused2022: 2 withdrawn or invalid21’222023: 16 approved2023: 2 refused2023: 3 withdrawn or invalid21’232024: 11 approved2024: 1 refused2024: 2 withdrawn or invalid14’242025: 17 approved2025: 4 withdrawn or invalid21’252026: 11 approved2026: 1 refused2026: 7 withdrawn or invalid2026: 5 undecided24’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 36 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 9 Oct 2026, 01:41
    SourceLicenceFetchedLink
    npadCC-BY-4.09 Oct 2026, 01:41open
    acpCC-BY-4.02 Oct 2026, 23:01open
    bcmsCC-BY-4.08 Oct 2026, 06:04open
    Building work nearby 10 in the last 12 months
    2 not signed off8 no sign-off needed
    • 41 Harbour Road, Dalkey, Dublin, A96 X725 · 14 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0328/WEB · 7 m
    • 40B Elton Park, Sereno, Dublin, A96 RA69 · 21 Sept 2026 · 1 homes · short notice no sign-off needed · D25B/0581/WEB · 412 m
    • Sandycove Close, Dublin, A96P383 · 30 Jul 2026 · start notice, opted out no sign-off needed · D26A/0043/WEB · 368 m
    • 9 Elton Park, Dublin · 20 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0457/WEB · 301 m
    • 51 Castle Park Road, Dublin, A96 F436 · 24 Jun 2026 · 1 homes · start notice not signed off · D26B/0124/WEB · 135 m
    • Sandycove Road, Dublin, Dún Laoghaire-Rathdown, A96 VX28 · 21 May 2026 · start notice, opted out no sign-off needed · D25A/0980/WEB · 389 m
    • Ulverton Road, Dalkey, Dún Laoghaire-Rathdown · 24 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0993/WEB · 400 m
    • Breffni Road, Dublin, Dún Laoghaire-Rathdown, A96 EC91 · 23 Feb 2026 · start notice not signed off · D25A/0474/WEB · 146 m
    • Castlepark Road, Sandycove, Dún Laoghaire-Rathdown · 5 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · D24A/0238 · 483 m
    • 6 Barnacoille Park, Dalkey, Dún Laoghaire-Rathdown, A96 T6T4 · 27 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D25B/0018/WEB · 481 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 8 Oct 2026, 06:04
    SourceLicenceFetchedLink
    bcmsCC-BY-4.08 Oct 2026, 06:04open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    bcmsCC-BY-4.08 Oct 2026, 06:04open
    npadCC-BY-4.09 Oct 2026, 01:41open
    social_housingCC-BY-SA-4.025 Sept 2026, 20:56open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Castle Park School——154 m
    Yonder and Maple Tree House2424 not started (2025-Q2)299 m
    39 Castle Park Road2424 being built (2026-Q2)524 m
    Charleville——590 m
    The Barn, Atmospheric Road2222 not started (2026-Q2)749 m
    Dalkey Manor3636 built (2025-Q4)869 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Castle Park School · Crèche12 Feb 2025 · report · Tusla Early Years Inspectorate205 m
    Smart Cookies Montessori · Crèche13 Jan 2026 · report · Tusla Early Years Inspectorate556 m
    Glenageary Montessori School · Crèche10 Mar 2026 · report · Tusla Early Years Inspectorate805 m
    Dalkey Community Pre School Playgroup Limited · Crèche6 Dec 2024 · report · Tusla Early Years Inspectorate852 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: dublin_pipeline, npad, schools, tusla_ey · fetched 5 Oct 2026, 23:01
    SourceLicenceFetchedLink
    dublin_pipelineCC-BY-4.05 Oct 2026, 23:01open
    npadCC-BY-4.09 Oct 2026, 01:41open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here22
    Council middle46
    Homes started
    Here126
    Council middle68
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    bcmsCC-BY-4.08 Oct 2026, 06:04open
    npadCC-BY-4.09 Oct 2026, 01:41open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    81% of homes built before 1971 (council 38%). 84% owner-occupied (council 68%).

    Homes built before 1971
    81% · council 38%
    Homes built since 2001
    8% · council 25%
    Owner-occupied
    84% · council 68%
    Rented
    12% · council 29%
    Children under 15
    15% · council 18%
    Aged 65 and over
    29% · council 17%
    Households with 2+ cars
    52% · council 39%
    Work mainly from home
    25% · council 19%
    This small area (309 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267076004

    Bus
    133 m
    Breffni Road · 111, 59, 7D · busiest stop within 500 m: 2 an hour at peak
    Radon
    1 in 5
    homes here likely high (EPA). Test it
    Nearest school
    585 m
    Dalkey NS (2), 101 pupils
    Homes sold nearby
    33
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Dalkey NS (2) · primary · 101 pupils · 585 m
    • Loreto National School · primary · 314 pupils · 761 m
    • Harold Boys NS · primary · 106 pupils · 846 m
    • Loreto Abbey Secondary School · postprimary · 757 pupils · 897 m

    Stops 18

    • Breffni Road · 111, 59, 7D, 7n · 2/hour at peak · 133 m
    • Our Lady's Manor · 111, 59, 7D · 2/hour at peak · 155 m
    • Breffni Road · 111, 59, 7D · 2/hour at peak · 162 m
    • Ulverton Road · 111, 59, 7D, 7n · 2/hour at peak · 171 m
    • Elton Park · 111, 59, 7D, 7n · 2/hour at peak · 375 m
    • The Paddocks · 111, 59, 7D · 2/hour at peak · 375 m
    • South Winds · 111, 59, 7D, 7n · 2/hour at peak · 409 m
    • Sandycove Road · 111, 59, 7D · 2/hour at peak · 469 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Dalkey NS (2) · 585 m0% pupils (101) · 4 classrooms 2026, section 5: exempt
    • Loreto National School · 761 m+1.6% pupils (314)
    • Harold Boys NS · 846 m-6.2% pupils (106)
    • Loreto Abbey Secondary School · 897 m+2% pupils (757) · 4 classrooms 2026, section 5: exempt

    Open consultations

    Council meetings 14 items

    Public land

    • Dún Laoghaire-Rathdown County Council · 0.28 ha · 448 m
    • Dún Laoghaire-Rathdown County Council · 0.17 ha · 497 m
    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
    SourceLicenceFetchedLink
    gtfsCC-BY-4.04 Oct 2026, 23:41open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.09 Oct 2026, 01:41open
    consultpublic9 Oct 2026, 01:21open
    moderngovpublic9 Oct 2026, 01:22open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Extension (D26A/0328/WEB) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    2. Extension (D15A/0661) ran out unbuilt in 2021: built anyway?
      Ask for: If built: proof it started in time, and an opinion of compliance.
      Seller · solicitor
    3. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    4. High radon area (1 in 5 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    5. Application 109 m away open for comments until 28 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Bullock
    Electoral division
    Dun Laoghaire-Sandycove
    Electoral area
    Dún Laoghaire
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • 3 applications on this site; latest D26A/0328/WEB, approved 2026, started, no sign-off needed.
    • Zoned R2 (existing residential); monument zone; no vacant land tax; high radon area.
    • Nothing nearby looks set to change.
    • 2 applications open for comments nearby; nearest closes 28 Oct 2026.
    • Our Lady's Manor (bus 111, 59) 155 m away: 2 an hour at morning peak; 17 from all stops within 500 m.
    • Here (2022 census): 84% owner-occupied (council 68%); 8% of homes empty (council 6%); most built before 1919; 46% drive to work (council 43%).
    • 2 home extensions within 250 m since 2026. Most were first-floor extensions.
    • Around here the council decides in a median 51 days (about 7 weeks); 1 in 10 is asked for more information.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 33
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.02 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.08 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC-BY-4.0 (Fingal); public/attribution…27 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC-BY-4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC-BY-4.0 (Fingal); public/attribution…27 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public9 Oct 2026
    www2.courts.ie—all-rights-reserved9 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC-BY-4.05 Oct 2026
    esbnetworks.ie—all-rights-reserved (esbnetworks.ie di… · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.04 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public9 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.09 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…9 Oct 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC-BY-4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.04 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.025 Sept 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.04 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 9 Oct 2026, 02:00 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.