Rocklands Avenue, Ballybane
Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (90%). 1 application nearby open for comments.
Not held yet for Galway City Council: council consultations.
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 51 days
- 4Appeal window4 weeks after the decision
- 5AppealAt An Coimisiún Pleanála
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 5 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 2001–10, under planning permission and building regulations.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
Zoning, protection, tax and flood: the detail
What it says
Residential: To provide residential development and for associated support development, which will ensure the protection of existing residential amenity and will contribute to sustainable residential neighbourhoods
A small rural settlement where only modest infill serving local need is envisaged.
galway city development plan 2023 2029 · 4 Jan 2023 – 4 Jan 2029
What it says
Residential: To provide residential development and for associated support development, which will ensure the protection of existing residential amenity and will contribute to sustainable residential neighbourhoods
A small rural settlement where only modest infill serving local need is envisaged.
galway city development plan 2023 2029 variations 1 2 3 · 4 Jan 2023 – 4 Jan 2029
Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Nellcor Puritan Bennett Ireland Ltd (616 m); Boston Scientific Limited (630 m); Thermo King Ireland Limited (830 m)
| Within 500 m | Count | For example |
|---|---|---|
| Monuments | 3 | Ringfort - unclassified; Souterrain |
How we work this out
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Development plan zoning (councils) | CC BY 4.0 | 25 Oct 2026, 23:06 | open |
| EPA licensed facilities (LEAP) | CC BY 4.0 | 26 Oct 2026, 23:21 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
| Constraint layers (bundle) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026, 19:37 | open |
| Sites and Monuments Record | CC BY 4.0 | 27 Sept 2026, 19:29 | open |
How we work this out
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 28 Oct 2026, 02:21 | open |
| National Planning Application Database | CC BY 4.0 | 28 Oct 2026, 04:50 | open |
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions are almost always approved here: 85–92% by type. A new house in a garden is harder: 93% approved, and 1 in 2 is asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 52 nearby, 466 council-wide
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 23 Oct 2026, 23:08 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 28 Oct 2026, 02:21 | open |
| National Planning Application Database | CC BY 4.0 | 28 Oct 2026, 04:50 | open |
How long, and what if someone objects?
A home extension's journey here
A decision takes 51 days. 1 in 9 is asked for more information, which adds about 72 days. Building starts about 5 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated107 decided home extensions, 33 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
3 of 3 appealed refusals became permissions. 2 of 12 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 3 in the last 12 months
- 500942 Granted · The Lantern Bar Ballybane , Ballybane Shopping Centre Ballybane Road… · 113 m
- 500690 Granted with conditions · Lands known as Glasshouse Commercial Site , Radharc na Gr?ine ,… · 489 m
- 500940 Open · The Lantern Bar Ballybane , Ballybane Shopping Centre Ballybane Road… · 113 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 28 Oct 2026, 04:50
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 23 Oct 2026, 23:08 | open |
| Courts Service legal diary (judicial reviews) | © the publisher | 27 Oct 2026, 23:11 | open |
| National Planning Application Database | CC BY 4.0 | 28 Oct 2026, 04:50 | open |
What's changing around you?
- 167 Monivea Park, Ballybane 2660366
- 2The Lantern Bar Ballybane, Ballybane Shopping Centre Ballybane Road 500942
- 30.9 ha zoned for homes
- 42.6 ha zoned for homes
- 50.3 ha zoned for homes
- 60.5 ha zoned for homes
- 70.1 ha zoned for homes
- 80.7 ha zoned for homes
- 9No. 25. Tone Avenue, Mervue 2660111
- 10Galway Crystal Murrough Drive, Dublin Road 2560339
- 1116 Glenavon Drive, Ballybane 2560395
What happens to applications within 500 m
Permission isn't building. Of 31 permissions since 2016, 10 show a start notice and 3 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured32 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
1 deadline within 500 m; the first closes 16 Nov 2026.
- Comments close 16 Nov 202619 days left12660366 · application received — Permission for development which consists of: Planning permission and Retention permission.…€20 to the council · 154 m away
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Sites that could change 10 within 500 m
Empty land zoned for homes 10
- 30.9 ha zoned for homes · no homes built on it yet · 23 m
- 42.6 ha zoned for homes · no homes built on it yet · 25 m
- 50.3 ha zoned for homes · no homes built on it yet · 64 m
- 60.5 ha zoned for homes · no homes built on it yet · 108 m
- 70.1 ha zoned for homes · no homes built on it yet · 115 m
- 80.7 ha zoned for homes · no homes built on it yet · 131 m
- 0.2 ha zoned for homes · no homes built on it yet · 154 m
- 0.2 ha zoned for homes · no homes built on it yet · 171 m
- 1.0 ha zoned for homes · no homes built on it yet · 182 m
- 1.3 ha zoned for homes · no homes built on it yet · 0 m
Not covered here: council land to be sold (Dublin only).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 28 Oct 2026, 04:50
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 23 Oct 2026, 23:08 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 28 Oct 2026, 02:21 | open |
| Derelict sites registers | CC BY 4.0 | 26 Oct 2026, 23:09 | open |
| National Planning Application Database | CC BY 4.0 | 28 Oct 2026, 04:50 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
Applications within 500 m, by year
Between 5 and 10 a year; busiest 2024. 97% of decisions were approvals.
2021 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Open for comments €20 to comment
- 167 Monivea Park , Ballybane , Galway comments close 16 Nov 2026Permission for development which consists of: Planning permission and Retention permission. Permission for…
Every application within 500 m 5 in the last 12 months
See every application on the map
- 67 Monivea Park , Ballybane , Galway Withdrawn or not validPermission for development which consists of: for modifications and alterations to floor plans, elevations,…
- 9No. 25. Tone Avenue , Mervue , Galway Approved with conditionsPermission for development which consists of: (1) The provision of a Single-Storey extension to the rear…
- 1116 Glenavon Drive , Ballybane , Galway Approved with conditionsPermission for development which consists of: a new ground floor extension to front side and rear of existing…
- 10Galway Crystal Murrough Drive , Dublin Road , Galway Approved with conditionsPermission for development which consists of: we, HeatGrid Ireland Limited, intend to apply for a 10-year…
How we work this out
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 28 Oct 2026, 04:50
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 28 Oct 2026, 04:50 | open |
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 23 Oct 2026, 23:08 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 28 Oct 2026, 02:21 | open |
Building work nearby 1 in the last 12 months
- 11 Rocklands Avenue, Galway, H91 RWN3 · 1 Aug 2026 · short notice no sign-off needed · 2460262 · 228 m
How we work this out
Source: Building Control Management System (commencement notices) · fetched 28 Oct 2026, 02:21
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 28 Oct 2026, 02:21 | open |
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Estate: Lios Na Rún.
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| Bright Sparks Early Years (Radharc Na Mara) Limited · Crèche | 12 Apr 2024 · report · Tusla Early Years Inspectorate | 559 m |
| Acorn Pre-School · Crèche | 23 Feb 2026 · report · Tusla Early Years Inspectorate | 628 m |
| Glasan Creche · Crèche | 3 Nov 2023 · report · Tusla Early Years Inspectorate | 821 m |
How we work this out
Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 27 Oct 2026, 23:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Housing estates | ODbL 1.0, CC BY-SA 4.0, CC BY 4.0 | 27 Oct 2026, 23:03 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| Tusla early years register | Public register | 21 Oct 2026, 23:37 | open |
How busy is this area Busier than most of Galway City Council.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 23 Oct 2026, 23:08 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 28 Oct 2026, 02:21 | open |
| National Planning Application Database | CC BY 4.0 | 28 Oct 2026, 04:50 | open |
What's the area like?
This street block against the council
3% of homes built before 1971 (council 17%). 18% owner-occupied (council 46%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 068001021
Schools, stops and the council
Schools
- Radharc na Mara National School · primary · 353 pupils · 559 m
Stops 44
- Ballybane SC · 401, 405 · 6/hour at peak · 102 m
- Ballybane SC · 401, 405 · 6/hour at peak · 205 m
- Monivea Park · 401, 425A · 3/hour at peak · 289 m
- Monivea Park · 401, 425A · 3/hour at peak · 289 m
- Ballybane IE · 405 · 3/hour at peak · 382 m
- Rahylin Glebe · 401, 405, NG05 · 6/hour at peak · 401 m
- Glenavon Dr · 401 · 3/hour at peak · 435 m
- Glenavon Dr · 401 · 3/hour at peak · 444 m
Schools growing or shrinking planning in 3 years · pupils last year
- Radharc na Mara National School · 559 m+0.6% pupils (353)
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 28 Oct 2026, 04:50
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Public transport stops and routes (NTA GTFS) | CC BY 4.0 | 25 Oct 2026, 23:02 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| National Planning Application Database | CC BY 4.0 | 28 Oct 2026, 04:50 | open |
| Council consultation portals | Public | 28 Oct 2026, 00:59 | open |
| Council meetings (ModernGov) | Public | 28 Oct 2026, 02:10 | open |
| Land Development Agency public land register | CC BY 4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- On the vacant land tax map: is the 3% tax being paid?SolicitorAsk for: Your solicitor's check of liability or exemption.
- Application 154 m away open for comments until 16 Nov 2026: comment?CouncilAsk for: The plans on the council's website (€20 to comment).
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Electoral division
- Ballybaan
- Electoral area
- Galway City East
- Council
- Galway City Council
Everything we found, as a list 8 lines
- Zoned R3 (rural cluster); not protected; on the vacant land tax map.
- 10 sites nearby could change: 10 empty zoned plots.
- 1 application open for comments nearby; nearest closes 16 Nov 2026.
- Ballybane SC (bus 401, 405) 102 m away: 6 an hour at morning peak; 33 from all stops within 500 m.
- Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
- Here (2022 census): 74% rent (council 47%); 2% of homes empty (council 10%); most built 2001–2010; 40% drive to work (council 47%); population up 3% since 2016.
- The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
- 5 applications nearby in the last 12 months.
What the terms mean 7 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 27
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC BY 4.0 | 23 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC BY 4.0 | 28 Oct 2026 |
| data.gov.ie | Various (see each layer) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC BY 4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | Local authorities (consultation portals) | Public | 28 Oct 2026 |
| www2.courts.ie | — | © the publisher | 27 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC BY 4.0 | 26 Oct 2026 |
| data.epa.ie | Environmental Protection Agency (LEAP licence register) | CC BY 4.0 | 26 Oct 2026 |
| overpass-api.de | OpenStreetMap contributors, NHDS, Kildare County Council | ODbL 1.0, CC BY-SA 4.0, CC BY 4.0 | 27 Oct 2026 |
| transportforireland.ie | National Transport Authority | CC BY 4.0 | 25 Oct 2026 |
| lda.ie | Land Development Agency | CC BY 4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | Public | 28 Oct 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC BY 4.0 | 28 Oct 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC BY 4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC BY 4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | © PSRA, PSI licence | 28 Oct 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC BY 4.0 | 25 Oct 2026 |
| gov.ie | Department of Education | CC BY 4.0 | 27 Oct 2026 |
| gov.ie | Department of Housing | CC BY-SA 4.0 | 23 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | Public register | 21 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC BY 4.0 | 25 Oct 2026 |