Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 24 Oct 2026, 15:07

Abberly Square South

53.28682, -6.36498

Homes here mostly date from the 1960s. 2 planning files on this house, the latest from 2021. Home extensions nearby almost always get approved (97%). 199 homes approved 276 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1961–70, around when planning permission began (1964). 2 planning files on this house, the latest from 2021.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1961–1970. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1961–1970 (census estimate)most built2021: SD21A/0070 · new house, refused2021: SD21A/0048 · new house, withdrawn or invalid

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    SD21A/0070 · new house · refused 2021
    approvedstarted?signed off?
  2. 2021
    SD21A/0048 · new house · withdrawn
    approved?started?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Monument zone1 within 100 m Mill - unclassified, Tallaght
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: licence P0659 (590 m); Bimeda Animal Health Limited (621 m); Safety Kleen Ireland Ltd (696 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Heritage inventory buildings4Saint Mary's Priory; Saint Maelruain's Church (Tallaght)
Radon grid squares1
Monuments20Historic town; Ecclesiastical enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Sites and Monuments Record, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), National Inventory of Architectural Heritage · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–100% by type. A new house in a garden is harder: 62% approved, and 1 in 2 is asked for more information.

Single-storey rear25 decided · more info asked 32%
88% · council 96%
Attic or dormer67 decided · more info asked 9%
99% · council 98%
Garage conversion12 decided · more info asked 25%
100% · council 99%
Porch or front14 decided · more info asked 14%
100% · council 96%
New house in a garden or site13 decided · more info asked 46%
62% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 131 nearby, 2,434 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 24 Oct 2026, 02:29
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 4 is asked for more information, which adds about 85 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 4): 138 days; Appeal window: 4 weeks; If appealed: +121 days; Building starts: 124 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 50–55 (n=130)55 daysIf more info asked (1 in 4)With further information: median 138 days (n=47)138 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 121 days (n=23, all appeals within 1.5 km)+121 daysBuilding startsStart notice: median 124 days after permission (n=56)124 days after permissionSigned off445 days after the start, for the few who file. 49% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated178 decided home extensions, 57 start notices, 23 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    3 of 12 appealed refusals became permissions. 1 of 12 appealed approvals were reversed.

    Refusals appealed12 decided
    3 became permissions
    Approvals appealed12 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months

    None of 1 changed the council's decision

    • 501442 Withdrawn · Unit 133, The Square, Belgard Square East, Dublin 24, D24 X030 · 351 m
    • 324080 Granted with conditions · A site of approximately 1.19 Ha at Belgard Square East, Belgard Road… · 187 m report
    • 500367 Pending · 24, Main Street, Tallaght, Dublin 24, D24 Y033 · 415 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 24 Oct 2026, 02:29
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher23 Oct 2026, 23:01open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Question 4

    What's changing around you?

    Street map around Abberly Square South with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedBuilding startedEmpty land zoned for homesNo decision yetApprovedOther
    1. 1TU Dublin, Tallaght SD26A/0239WNo decision yet · 491 m
    2. 2Belgard Square East LRD25A/0009WApproved, no sign building has started · 276 m
    3. 3Belgard Road, Dublin SD25A/0001WBuilding started · 155 m
    4. 40.2 ha zoned for homesEmpty land zoned for homes · 460 m
    5. 50.7 ha zoned for homesEmpty land zoned for homes · 468 m
    6. 66.6 ha zoned for homesEmpty land zoned for homes · 496 m
    7. 7Block 5, Unit 1 And 2 SD26A/0209WNo decision yet · 80 m
    8. 8Sixth Floor, Tallaght Retail Centre SD26A/0099WApproved · 113 m
    9. 91-3 High Street, Dublin 8 WEB3293/26No decision yet · 137 m
    10. 10Tallaght Village Enhancement Scheme, Dublin 24. PT8SD349No decision yet · 171 m
    11. 11SDCC Lands @28 Locations PT8SD422No decision yet · 195 m
    12. 12Unit 133, The Square SD26A/0065WApproved · 351 m
    13. 13Unit 120/121 and Unit 122, Level 1 ED26/0097Section 5: exempt · 381 m
    14. 14No 3 College View, Main Street SD26A/0019WApproved · 398 m
    15. 15104, St Maelruan’s Park SD26B/0301WApproved · 430 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 55 permissions since 2016, 23 show a start notice and 12 have a completion certificate.

    81 applications lodged within 500 m. Council: 57 approved, 7 refused. After appeals: 55 approved. Of those: 12 signed off, 4 built with the owner's opt-out, 7 started, 32 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT57: lodged → approved7: lodged → refused9: lodged → withdrawn or invalid8: lodged → undecided55: approved → approved7: refused → refused9: withdrawn or invalid → withdrawn8: undecided → undecided1 approved by the council, undecided after an appeal1 approved by the council, withdrawn or invalid after an appeal32: approved → no start notice found4: approved → built, owner opted out7: approved → started, not signed off12: approved → signed off81 lodged81 lodged57 approved57 approved7 refused7 refused9 withdrawn or invalid9 withdrawn or invalid8 undecided8 undecided55 approved55 approved7 refused7 refused10 withdrawn10 withdrawn9 undecided9 undecided32 no start notice found32 no start notice found4 built, owner opted out4 built, owner opted out7 started, not signed off7 started, not signed off12 signed off12 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured81 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    2 deadlines within 500 m; the first closes 30 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-30 ACP 501442: Appeal declared withdrawn S.140(2)(b); 2026-11-10 SD26A/0239W: application received — New campus sports facilities including a single-storey sports changing pavilion, separate equipment store, hurling traintoday29 Oct3 Nov8 Nov13 Nov18 Nov23 NovACP 501442: Appeal declared withdrawn S.140(2)(b) · 351 m away · 2026-10-30SD26A/0239W: application received — New campus sports facilities including a single-storey sports changing pavilion, separate equipment store, hurling train · 491 m away · 2026-11-10
    Comments closeHigh Court window ends
    • Time to ask the High Court for a review ends 30 Oct 20266 days left
      Appeal declared withdrawn S.140(2)(b)
      351 m away
    • Comments close 10 Nov 202617 days left
      1SD26A/0239W · application received — New campus sports facilities including a single-storey sports changing pavilion, separate…
      €20 to the council · 491 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    199 homes 276 m away were approved May 2026 with no start notice yet; the permission runs to May 2031.

    Belgard Square East · 199 homes: 199 homes approved May 2026, not started202420252026202720282029203020312032Belgard Square East · 199 homes276 m · LRD25A/0009W199 homes approved May 2026, not started199 homes approved May 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 4 within 500 m

    Approved, not started 1

    Empty land zoned for homes 3

    • 40.2 ha zoned for homes · no homes built on it yet · 460 m
    • 50.7 ha zoned for homes · no homes built on it yet · 468 m
    • 66.6 ha zoned for homes · no homes built on it yet · 496 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 24 Oct 2026, 02:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    Council meetings (ModernGov)Public24 Oct 2026, 02:46open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 8

    Applications within 500 m, by year

    Between 12 and 15 a year; busiest 2022. 89% of decisions were approvals.

    2021: 12, 2022: 15, 2023: 14, 2024: 12, 2025: 14, 2026: 14051015202021: 8 approved2021: 3 refused2021: 1 withdrawn or invalid12’21*2022: 9 approved2022: 2 refused2022: 4 withdrawn or invalid15’222023: 11 approved2023: 1 refused2023: 2 withdrawn or invalid14’232024: 12 approved12’242025: 12 approved2025: 1 refused2025: 1 withdrawn or invalid14’252026: 5 approved2026: 1 withdrawn or invalid2026: 8 undecided14’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 17 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Building work nearby 9 in the last 12 months
    5 signed off as finished2 not signed off2 no sign-off needed
    • Unit 204 The Square, Dublin, D24 RKF9 · 18 Sept 2026 · start notice not signed off · 459 m
    • 3Belgard Road, Dublin · 7 Sept 2026 · 4 homes · start notice not signed off · SD25A/0001W · 155 m
    • Unit 303, Level 3, The Square, Tallaght, South Dublin, D24 E5NA · 1 Jun 2026 · 7-day notice signed off · 458 m
    • 1 Belgard Road, Dublin, South Dublin, D24 P9CC · 1 Apr 2026 · start notice signed off · SD24A/0288W · 187 m
    • 115 Saint Maelruan's Park, South Dublin, D24 N1WK · 15 Mar 2026 · start notice, opted out no sign-off needed · SD25B/0294 · 478 m
    • 107 Watergate, Dublin 24, South Dublin, D24 TX4Y · 2 Mar 2026 · short notice no sign-off needed · SD24B/0358 · 405 m
    • Unit 242/243/244 Level 2, The Square, Tallaght, D24 V26N, Dublin, South Dublin, D24 V26N · 16 Feb 2026 · 7-day notice signed off · 441 m
    • Unit 242,243,244 Level 2, The Square, Tallaght, South Dublin, D24 V26N · 2 Jan 2026 · start notice signed off · 458 m
    • East Carpark, The SquareTallaghtDublin, Dublin, South Dublin · 20 Nov 2025 · 7-day notice signed off · SD25A/0196W · 350 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Homes coming 199 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Westpark · 7 applications in 10 years · 83% approved

    Developments within 1.0 km

    SchemeHomesProgressDistance
    1-3 High Street4—137 m
    Tallaght Village Enhancement Scheme——171 m
    Belgard Square East199—187 m
    Belgard Road10—195 m
    SDCC Lands @28 Locations——195 m
    The Former ABB Site334—400 m
    Former Ulster Bank Building, Tallaght26no activity on site reported (2026-Q2)430 m
    Old Blessington Road——455 m

    Who applies most nearby

    • South Dublin County Council — 3 applications, latest 20 Jul 2026
    • Health Services Staffs Credit Union Limited — 2 applications, latest 9 Sept 2026

    Crèches and schools inspected

    NameLatest inspectionDistance
    Mary’s House Tallaght · Crèche9 May 2024 · report · Tusla Early Years Inspectorate525 m
    The Little Childrens Centre · Crèche15 May 2025 · report · Tusla Early Years Inspectorate559 m
    Little Ladybird Ltd. · Crèche7 May 2025 · report · Tusla Early Years Inspectorate559 m
    Oakview Village Tallaght · Crèche25 Feb 2026 · report · Tusla Early Years Inspectorate575 m
    Oakview Tallaght · Crèche14 May 2026 · report · Tusla Early Years Inspectorate592 m
    Ashling Nursery and Montessori · Crèche18 Mar 2025 · report · Tusla Early Years Inspectorate615 m
    Tallaght Child Care Centre · Crèche24 Jul 2024 · report · Tusla Early Years Inspectorate632 m
    Barnardos Child & Family Service Millbrook · Crèche9 Jun 2025 · report · Tusla Early Years Inspectorate632 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 24 Oct 2026, 02:29
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Applicant organisations (from the CRO)Derived by Planning Register18 Oct 2026, 23:06—
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of South Dublin County Council.
    Homes approved
    Here489
    Council middle0
    Homes started
    Here510
    Council middle4
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    58% of homes built before 1971 (council 18%). 69% owner-occupied (council 67%).

    Homes built before 1971
    58% · council 18%
    Homes built since 2001
    0% · council 27%
    Owner-occupied
    69% · council 67%
    Rented
    31% · council 29%
    Children under 15
    18% · council 21%
    Aged 65 and over
    18% · council 13%
    Households with 2+ cars
    34% · council 40%
    Work mainly from home
    6% · council 10%
    This small area (189 people)South Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267144004

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    194 m
    Village Grn · 49n, 77A, S6 · busiest stop within 500 m: 24 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    514 m
    St Dominic's National School, 410 pupils
    Homes sold nearby
    36
    in 3 years, 8 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Dominic's National School · primary · 410 pupils · 514 m
    • Old Bawn Community School · postprimary · 1024 pupils · 535 m
    • St Marys School · primary · 349 pupils · 648 m
    • Scoil Maelruain Junior · primary · 369 pupils · 987 m

    Stops 46

    • Village Grn · 49n, 77A, S6, S8 · 10/hour at peak · 194 m
    • Village Grn · 77A, S6, S8 · 13/hour at peak · 209 m
    • Tallaght Village · 27, 49n, 65, 77A, 77n, 82 · 19/hour at peak · 219 m
    • DSP Building · UM08 · 0/hour at peak · 238 m
    • DSP Building · UM08 · 242 m
    • Tallaght Village · 27, 65, 77A, 82, S6, S8 · 24/hour at peak · 244 m
    • Ol Blessington Rd · 27, 49n, 65, 77A, 77n, 82 · 19/hour at peak · 293 m
    • St Maelruan's Park · 49n, 77A, S6, S8, SD3, SD4 · 10/hour at peak · 378 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Dominic's National School · 514 m-0.2% pupils (410)
    • Old Bawn Community School · 535 m-0.8% pupils (1,024) · a pitch or play area 2026, approved
    • St Marys School · 648 m+8% pupils (349)
    • Scoil Maelruain Junior · 987 m-2.6% pupils (369)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.35 ha · 32 m
    • Dublin City Council · 1.08 ha · 116 m
    • South Dublin County Council · 0.26 ha · 119 m
    • Dublin City Council · 0.63 ha · 127 m
    • Dublin City Council · 0.72 ha · 131 m
    • The Office of Public Works · 0.51 ha · 134 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 24 Oct 2026, 02:46
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Council consultation portalsPublic24 Oct 2026, 01:49open
    Council meetings (ModernGov)Public24 Oct 2026, 02:46open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. New house (SD21A/0070) refused 2021: built anyway?
      Ask for: The seller's answer and your surveyor's check.
      Seller · solicitor
    2. Application 491 m away open for comments until 10 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Tallaght
    Electoral division
    Tallaght-Kingswood
    Electoral area
    Tallaght Central
    Council
    South Dublin County Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest SD21A/0070, refused 2021.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 4 sites nearby could change: 1 approved scheme, 3 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 10 Nov 2026.
    • 199 homes approved nearby, not started; largest 199 at Belgard Square East.
    • Tallaght Village (bus 27, 65) 244 m away: 24 an hour at morning peak; 157 from all stops within 500 m.
    • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 69% owner-occupied (council 66%); 4% of homes empty (council 4%); most built 1961–1970; 54% drive to work (council 54%); population up 7% since 2016.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 34
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.024 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public24 Oct 2026
    www2.courts.ie—© the publisher23 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public24 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.024 Oct 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register18 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence24 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 24 Oct 2026, 15:07 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.