Planning report · Kildare County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 15:30

Prosperous

53.28802, -6.75250

Homes here mostly date from the 2000s.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of ProsperousBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 11 files on Prosperous2022: 9 files on Prosperous2023: 13 files on Prosperous2024: 11 files on Prosperous2025: 5 files on Prosperous2026: 4 files on Prosperous53 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
M2
Zoning · Major town centre
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

Town Centre: To provide for the development and improvement of appropriate town centre uses including residential, commercial, office and civic use.

The main town centre — retail, offices, civic uses, apartments.

kildare county development plan 2023 2029 prosperous · 28 Jan 2023 – 23 Mar 2029

Protected building2 within 100 m Catholic Church of Our Lady & St. Joseph, Prosperous; Prosperous National School (former), Prosperous
Monument zone1 within 100 m Font (present location), Curryhills
Radon1 in 10 homes have high radon (EPA)

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings11house; Brook Lodge
Radon grid squares1
Monuments4Ringfort - rath; Font (present location)
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 34 on the draft 2027 map; 34 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, Sites and Monuments Record, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 61% approved, and 1 in 3 is asked for more information.

Attic or dormer11 decided · more info asked 36%
100% · council 89%
New house in a garden or site18 decided · more info asked 33%
61% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 29 nearby, 1,767 council-wide

Figure 3

Prosperous, file by file since 2021

18 of 18 decided extensions on the road were approved. New houses in side gardens or on sites: 6 of 6.

53 planning files on Prosperous since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 146 · 2021 · porch / front · approved · 211379No. 48 · 2021 · single-storey rear · approved · 21201No number · 2021 · two-storey rear · approved · 21595No number · 2021 · other extension · approved · 21997No number · 2022 · attic conversion / dormer · approved · 221176No number · 2022 · attic conversion / dormer · approved · 22376No number · 2022 · attic conversion / dormer · approved · 22929No number · 2023 · single-storey rear · approved · 23115No number · 2023 · attic conversion / dormer · approved · 2360454No. 48 · 2023 · single-storey rear · approved · 2360455No. 6 · 2023 · attic conversion / dormer · approved · 23744No number · 2023 · attic conversion / dormer · approved · 23921No number · 2024 · attic conversion / dormer · approved · 2460064No number · 2024 · rear · approved · 2460073No. 8 · 2024 · attic conversion / dormer · approved · 2460611No. 3 · 2024 · garage conversion · approved · 2461244No number · 2025 · two-storey rear · approved · 2560130No. 48 · 2025 · single-storey rear · approved · 2560170Porches, roofs, otherNo number · 2021 · other work · approved · 211021No number · 2021 · other work · approved · 211277No number · 2021 · other work · refused · 211428No number · 2021 · other work · approved · 211811No number · 2021 · other work · approved · 21265No number · 2021 · other extension · approved · 2177No number · 2022 · other work · approved · 221135No. 34 · 2022 · other work · approved · 221455No number · 2022 · other work · approved · 2215No number · 2022 · other work · approved · 22769No number · 2022 · other work · approved · 22954No number · 2023 · other work · approved · 231045No number · 2023 · other work · approved · 235No number · 2023 · other work · approved · 2360383No number · 2023 · other work · approved · 2360467No number · 2023 · other work · refused · 2360470No number · 2023 · other work · refused · 2374No number · 2024 · other work · refused · 24254No number · 2024 · other work · approved · 2460132No. 4 · 2024 · other work · approved · 2460249No number · 2024 · other work · approved · 2460473No number · 2024 · other work · refused · 2461111No number · 2025 · other work · refused · 2518No number · 2025 · other work · refused · 2560430No number · 2025 · other work · approved · 2561212No number · 2026 · other work · approved · 2660160No number · 2026 · other work · approved · 2660268No number · 2026 · other work · approved · 2660410No number · 2026 · other work · refused · 2660802New house in a side gardenNo number · 2021 · new house · approved · 21190No number · 2022 · new house · approved · 221239No number · 2023 · new house · approved · 2360303No number · 2023 · new house · approved · 2367No number · 2024 · new house · approved · 24196No number · 2024 · new house · approved · 2461074
ApprovedRefusedWithdrawn or invalid

53 files with "Prosperous" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days. 1 in 3 is asked for more information, which adds about 132 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 3): 182 days; Appeal window: 4 weeks; Building starts: 131 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 mo21 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 49–54 (n=17)51 daysIf more info asked (1 in 3)With further information: median 182 days (n=9)182 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 131 days after permission (n=11)131 days after permissionSigned off36% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated26 decided home extensions, 11 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    2 of 2 appealed refusals became permissions. 2 of 4 appealed approvals were reversed.

    Refusals appealed2 decided
    2 became permissions
    Approvals appealed4 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Prosperous with 12 numbered planning items
    ⌖ the houseEmpty land zoned for homesBuilding startedApprovedNo decision yetRefused
    1. 10.6 ha zoned for homesEmpty land zoned for homes · 87 m
    2. 20.2 ha zoned for homesEmpty land zoned for homes · 88 m
    3. 30.4 ha zoned for homesEmpty land zoned for homes · 102 m
    4. 4SCOIL AN LINBH ÍOSA, Prosperous SN0014457KEBuilding started · 114 m
    5. 510.4 ha zoned for homesEmpty land zoned for homes · 133 m
    6. 64.5 ha zoned for homesEmpty land zoned for homes · 139 m
    7. 70.5 ha zoned for homesEmpty land zoned for homes · 144 m
    8. 8Curryhills, Prosperous 2660160Approved with conditions · 353 m
    9. 9Healys Old Post Office, CurryhillsProsperous 2660130No decision yet · 369 m
    10. 10Weavers court, Prosperous 2660802Refused · 393 m
    11. 11Curryhills, Prosperous 2660659No decision yet · 441 m
    12. 12Buttermilk Lane, Downings North 2660268Approved with conditions · 473 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 39 permissions since 2016, 16 show a start notice and 8 have a completion certificate.

    46 applications lodged within 500 m. Council: 40 approved, 6 refused. After appeals: 39 approved. Of those: 8 signed off, 4 built with the owner's opt-out, 4 started, 18 with no start notice found, 5 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT40: lodged → approved6: lodged → refused38: approved → approved5: refused → refused2 approved by the council, refused after an appeal1 refused by the council, approved after an appeal18: approved → no start notice found4: approved → built, owner opted out4: approved → started, not signed off8: approved → signed off5: approved → ran out46 lodged46 lodged40 approved40 approved6 refused6 refused39 approved39 approved7 refused7 refused18 no start notice found18 no start notice found4 built, owner opted out4 built, owner opted out4 started, not signed off4 started, not signed off8 signed off8 signed off5 ran out5 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured46 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 10 within 500 m

      Empty land zoned for homes 10

      • 10.6 ha zoned for homes · no homes built on it yet · 87 m
      • 20.2 ha zoned for homes · no homes built on it yet · 88 m
      • 30.4 ha zoned for homes · no homes built on it yet · 102 m
      • 510.4 ha zoned for homes · no homes built on it yet · 133 m
      • 64.5 ha zoned for homes · no homes built on it yet · 139 m
      • 70.5 ha zoned for homes · no homes built on it yet · 144 m
      • 0.2 ha zoned for homes · no homes built on it yet · 155 m
      • 1.9 ha zoned for homes · no homes built on it yet · 163 m
      • 1.2 ha zoned for homes · no homes built on it yet · 172 m
      • 0.1 ha zoned for homes · no homes built on it yet · 204 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 4 and 13 a year; busiest 2023. 87% of decisions were approvals.

      2021: 11, 2022: 7, 2023: 13, 2024: 8, 2025: 4, 2026: 3051015202021: 10 approved2021: 1 refused11’21*2022: 7 approved7’222023: 11 approved2023: 2 refused13’232024: 7 approved2024: 1 refused8’242025: 3 approved2025: 1 refused4’252026: 2 approved2026: 1 refused3’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 11 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 3 in the last 12 months
      1 not signed off2 no sign-off needed
      • 4SCOIL AN LINBH ÍOSA, Prosperous, Kildare · 7 Jul 2026 · 7-day notice not signed off · 114 m
      • Hatters Cross, Curryhills,, Prosperous, Kildare · 15 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 23921 · 397 m
      • Hatters Cross, Curryhills, Hatters Cross, Kildare · 8 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 23921 · 413 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Homes coming 0 not started
      • Curryhills · 11 homes · building started · 113 m
      • Curryhills · 10 homes · building started · 229 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      CK’s Montessori · Crèche20 May 2025 · report · Tusla Early Years Inspectorate347 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Kildare County Council.
      Homes approved
      Here55
      Council middle0
      Homes started
      Here57
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      63% owner-occupied (council 71%).

      Homes built before 1971
      25% · council 16%
      Homes built since 2001
      39% · council 40%
      Owner-occupied
      63% · council 71%
      Rented
      29% · council 24%
      Children under 15
      24% · council 22%
      Aged 65 and over
      14% · council 12%
      Households with 2+ cars
      47% · council 51%
      Work mainly from home
      6% · council 12%
      This small area (358 people)Kildare

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087031008

      Road noise
      55–59 dB
      day–night average (EPA 2022)
      Bus
      89 m
      Prosperous · 120, 120B, 120F · busiest stop within 500 m: 3 an hour at peak
      Radon
      1 in 10
      homes here likely high (EPA). Test it
      Nearest school
      121 m
      Prosperous NS, 493 pupils
      Homes sold nearby
      19
      in 3 years, 1 new (Property Price Register)
      Schools, stops and the council

      Schools

      • Prosperous NS · primary · 493 pupils · 121 m
      • St Farnan's Post Primary School · postprimary · 676 pupils · 154 m

      Stops 8

      • Prosperous · 120, 120B, 120F, 120X · 1/hour at peak · 89 m
      • Prosperous · 120, 120A, 120B, 120E, 120F, 120X · 2/hour at peak · 153 m
      • Barrington Court · 120, 120A, 120B, 120E, 120F, 120X · 3/hour at peak · 295 m
      • Barrington Court · 120, 120B, 120F, 120X, UM18, UM19 · 1/hour at peak · 340 m
      • Prosperous W · 821 · 0/hour at peak · 547 m
      • Prosperous W · 821 · 0/hour at peak · 589 m
      • Curryhills · 120, 120A, 120B, 120E, 120F, 120X · 2/hour at peak · 790 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Prosperous NS · 121 m-2.2% pupils (493)
      • St Farnan's Post Primary School · 154 m+6.5% pupils (676) · 4 classrooms 2024, approved with conditions
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. High radon area (1 in 10 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Curryhills
      Electoral division
      Downings
      Electoral area
      Clane
      Council
      Kildare County Council
      Everything we found, as a list 8 lines
      • Zoned M2 (major town centre); not protected; no vacant land tax; high radon area.
      • 10 sites nearby could change: 10 empty zoned plots.
      • Barrington Court (bus 120, 120A) 294 m away: 3 an hour at morning peak; 6 from all stops within 500 m.
      • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 63% owner-occupied (council 71%); 6% of homes empty (council 5%); most built 2001–2010; 67% drive to work (council 61%); population up 4% since 2016.
      • The council decides in a median 61 days (about 9 weeks); 44% are asked for more information.
      • Homes started within 1 km: 12 in the last year, 24 three years before.
      • 11 applications nearby in the last 12 months.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 29
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      water.ie—© the publisher · flag only—
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 15:30 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.