Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 26 Oct 2026, 20:37

Drummartin Close

53.28994, -6.22580

Homes here mostly date from the 1950s. 2 planning files on this house, the latest from 2025. Home extensions nearby almost always get approved (92%). 114 homes approved 245 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed. 2 planning files on this house, the latest from 2025.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960. 2 planning files on this house.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Drummartin CloseBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2025: D25A/0697/WEB · the development will, approved2025: D24B/0443/WEB · we, mr. &, approved2024: 2 files on Drummartin Close2025: 1 file on Drummartin Close3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    D25A/0697/WEB · the development will · approved 2025 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2025
    D24B/0443/WEB · we, mr. & · approved 2025 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas1Campfield Terrace, Kilmacud Road Upper, Dundrum
Radon grid squares2
Protected buildings11Bellvue; The Glass House
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, Records of Protected Structures · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 71–100% by type. A new house in a garden is harder: 71% approved, and 1 in 3 is asked for more information.

Single-storey rear96 decided · more info asked 11%
96% · council 96%
Two-storey rear40 decided · more info asked 12%
88% · council 92%
Two-storey side10 decided · more info asked 30%
90% · council 95%
Single-storey side31 decided · more info asked 16%
90% · council 96%
Attic or dormer245 decided · more info asked 9%
92% · council 94%
First-floor28 decided · more info asked 11%
71% · council 90%
Garage conversion43 decided · more info asked 7%
100% · council 99%
Porch or front12 decided · more info asked 0%
100% · council 99%
New house in a garden or site34 decided · more info asked 29%
71% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 539 nearby, 3,886 council-wide

Figure 3

Drummartin Close, file by file since 2024

2 of 2 decided extensions on the road were approved.

3 planning files on Drummartin Close since 2024, by kind and decision.202420252026Extensions, atticsNo. 2 · 2024 · single-storey rear · approved · D24B/0116/WEBNo. 13 · 2025 · single-storey rear · approved · D25A/0697/WEBPorches, roofs, otherNo. 15 · 2024 · other work · approved · D24B/0443/WEBNew house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Drummartin Close" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2024–2026

Extensions and refusals right beside you 6 within 250 m · 0 refused within 100 m

Extensions and refusals near you 6 extensions within 250 m · the last 12 months

5 of 5 approved (100%) · most common: garage conversion

5 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Garage conversion22—
Single-storey rear21—
First-floor11—
Other11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 8 is asked for more information, which adds about 51 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 8): 106 days; Appeal window: 4 weeks; If appealed: +123 days; Building starts: 130 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–54 (n=522)52 daysIf more info asked (1 in 8)With further information: median 106 days (n=70)106 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 123 days (n=91, all appeals within 1.5 km)+123 daysBuilding startsStart notice: median 130 days after permission (n=289)130 days after permissionSigned off422 days after the start, for the few who file. 65% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated592 decided home extensions, 291 start notices, 91 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    15 of 31 appealed refusals became permissions. 3 of 63 appealed approvals were reversed.

    Refusals appealed31 decided
    15 became permissions
    Approvals appealed63 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 6 in the last 12 months

    2 of 4 changed the council's decision

    • 501782 Refused · 50, Knocknashee, Goatstown, Co Dublin, D14KV04 · 326 m
    • 501757 Open · 37, Eden Park Drive, Goatstown, Dublin 14, D14WP48 · 222 m
    • 501597 Pending · 27, Sweetbriar Lane, Kilmacud, Dublin 14, D14ET80 · 455 m
    • 324042 Granted with conditions · Lands at Knockrabo, Mount Annville Road, Goatstown, Dublin 14 · 387 m report
    • 500518 Granted with conditions · 35 Eden Park Drive, Goatstown, Dublin 14, D14X6W7 · 216 m report
    • 500355 Granted with conditions · 36, Drummartin Park, Goatstown, Dublin 14, D14R982 · 253 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher25 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 4

    What's changing around you?

    Street map around Drummartin Close with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedBuilding site that stoppedBuilding startedEmpty land zoned for homesApprovedNo decision yetOther
    1. 150 Knocknashee, Goatstown C3A/0009/26No decision yet · 326 m
    2. 2Mount Anville Lands LRD23A/0719Approved, no sign building has started · 245 m
    3. 3Drummartin link road, Dublin D21A/0615Building site that stopped · 378 m
    4. 4212 Lower Kilmacud Road, Dublin 14 D26A/0116/WEBBuilding started · 96 m
    5. 510 Drummartin Road, Dublin 14 D25A/0273Building started · 114 m
    6. 637 Drummartin Road, Goatstown D25B/0196/WEBBuilding started · 122 m
    7. 70.3 ha zoned for homesEmpty land zoned for homes · 342 m
    8. 8212, Lower Kilmacud Road D26A/0116/WEBApproved · 84 m
    9. 935 Drummartin Road, Goatstown D26B/0477/WEBNo decision yet · 107 m
    10. 10No. 204, Lower Kilmacud Road D26A/0011/WEBApproved · 126 m
    11. 1123, Eden Park Avenue D26A/0017/WEBApproved · 188 m
    12. 12188, Lower Kilmacud Road D26B/0207/WEBApproved · 198 m
    13. 1360, Knocknashee REF14626Section 5: exempt · 220 m
    14. 1437, Eden Park Drive D26A/0343/WEBApproved · 222 m
    15. 15Lorrequer House, Drummartin Terrace D26A/0507/WEBApproved · 266 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 132 permissions since 2016, 60 show a start notice and 4 have a completion certificate. Most owners opt out of sign-off.

    162 applications lodged within 500 m. Council: 134 approved, 9 refused. After appeals: 132 approved. Of those: 4 signed off, 38 built with the owner's opt-out, 18 started, 69 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT134: lodged → approved9: lodged → refused15: lodged → withdrawn or invalid4: lodged → undecided130: approved → approved7: refused → refused15: withdrawn or invalid → withdrawn4: undecided → undecided1 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal2 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal69: approved → no start notice found38: approved → built, owner opted out18: approved → started, not signed off4: approved → signed off3: approved → ran out162 lodged162 lodged134 approved134 approved9 refused9 refused15 withdrawn or invalid15 withdrawn or invalid4 undecided4 undecided132 approved132 approved8 refused8 refused17 withdrawn17 withdrawn5 undecided5 undecided69 no start notice found69 no start notice found38 built, owner opted out38 built, owner opted out18 started, not signed off18 started, not signed off4 signed off4 signed off3 ran out3 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured162 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 10 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-10 C3A/0009/26: application received — Class 3A Exemption.today31 Oct5 Nov10 Nov15 Nov20 Nov25 NovC3A/0009/26: application received — Class 3A Exemption. · 326 m away · 2026-11-10
    Comments close
    • Comments close 10 Nov 202615 days left
      1C3A/0009/26 · application received — Class 3A Exemption.
      €20 to the council · 326 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    114 homes 245 m away were approved Aug 2024 with no start notice yet; the permission runs to Aug 2029. 1 building site nearby stopped before sign-off.

    Mount Anville Lands · 114 homes: 114 homes approved Aug 2024, not started; Drummartin link road,… · 47 homes: 47 homes, started Sep 2022, never signed off202220232024202520262027202820292030Mount Anville Lands · 114 homes245 m · LRD23A/0719114 homes approved Aug 2024, not started114 homes approved Aug 2024, not startedDrummartin link road,… · 47 homes378 m · D21A/061547 homes, started Sep 2022, never signed off47 homes, started Sep 2022, never signed offtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 3 within 500 m

    Building site that stopped 1

    Approved, not started 1

    Empty land zoned for homes 1

    • 70.3 ha zoned for homes · no homes built on it yet · 342 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    Council meetings (ModernGov)Public26 Oct 2026, 01:54open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 24 and 37 a year; busiest 2025. 94% of decisions were approvals.

    2021: 24, 2022: 24, 2023: 29, 2024: 25, 2025: 37, 2026: 230102030402021: 20 approved2021: 3 refused2021: 1 withdrawn or invalid24’21*2022: 20 approved2022: 2 refused2022: 2 withdrawn or invalid24’222023: 27 approved2023: 2 withdrawn or invalid29’232024: 20 approved2024: 5 withdrawn or invalid25’242025: 30 approved2025: 3 refused2025: 4 withdrawn or invalid37’252026: 17 approved2026: 1 refused2026: 1 withdrawn or invalid2026: 4 undecided23’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 31 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Building work nearby 21 in the last 12 months
    2 signed off as finished6 not signed off13 no sign-off needed
    • Drummartin Terrace, Dublin 14, Dublin, D14 X0E7 · 26 Oct 2026 · 1 homes · short notice no sign-off needed · D26A/0507/WEB · 276 m
    • 50 Knocknashee, Dublin 14, Dublin, D14 KV04 · 5 Oct 2026 · 1 homes · start notice not signed off · D26B/0281/WEB · 349 m
    • 37 Birchfield Park, Dublin 14, Dublin, D14 P5Y0 · 7 Sept 2026 · start notice, opted out no sign-off needed · D25B/0495/WEB · 389 m
    • 16 Sweet Briar Lane, Dublin, D14 E726 · 2 Sept 2026 · 1 homes · short notice no sign-off needed · D25B/0691/WEB · 487 m
    • 61 Mount Anville Wood, Dublin 14, Dublin, D14 TY86 · 28 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0695/WEB & D25/0990/WEB · 363 m
    • 23 Woodley Park, Dublin 14, Dublin · 24 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0987 · 293 m
    • 510 Drummartin Road, Dublin 14, Dublin, D14 EY01 · 17 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0273 · 114 m
    • 4212 Lower Kilmacud Road, Dublin 14, Dublin, D14 A627 · 2 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0116/WEB · 96 m
    • Mount Anville Road, Dublin, Dún Laoghaire-Rathdown, D14 C6P0 · 26 May 2026 · 2 homes · start notice not signed off · LRD24A/0882/WEB · 451 m
    • 41 Woodley Park, Kilmacud, Dún Laoghaire-Rathdown, D14 H025 · 22 May 2026 · start notice, opted out no sign-off needed · D25B/0387/WEB · 314 m
    • 55 Mount Anville Road, Dublin, Dún Laoghaire-Rathdown, D14 C6P0 · 22 May 2026 · 3 homes · start notice not signed off · LRD24A/0882/WEB · 437 m
    • 637 Drummartin Road, Goatstown, Dún Laoghaire-Rathdown, D14 ND62 · 5 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0196/WEB · 122 m
    • 8 Eden Park Avenue, Kilmacud, Dún Laoghaire-Rathdown, D14 YY72 · 23 Mar 2026 · short notice no sign-off needed · D25A/0809/WEB · 274 m
    • 202 Lower Kilmacud Road, Drummartin, Dún Laoghaire-Rathdown, D14 XV50 · 12 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0228/WEB · 140 m
    • 57 Woodley Park, Dublin, Dún Laoghaire-Rathdown, D14 NV22 · 20 Jan 2026 · 1 homes · start notice signed off · D24A/1013/WEB · 493 m
    • 13 Drummartin Close, dublin 14, Dún Laoghaire-Rathdown, D14 A520 · 29 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · D25A/0697/WEB · 4 m
    • Block J Knockrabo, Goatstown, Dún Laoghaire-Rathdown · 19 Dec 2025 · 16 homes · 7-day notice not signed off · LRD24A/0882/WEB · 482 m
    • Block I Knockrabo, Goatstown, Dún Laoghaire-Rathdown · 19 Dec 2025 · 16 homes · 7-day notice not signed off · LRD24A/0882/WEB · 478 m
    • 1-8 Cedarmount Grove and Cedarmount Lodge, Knockrabo, Mount Anville Road, Goatstown, Dun Laoghaire, Dún Laoghaire-Rathdown · 1 Dec 2025 · 9 homes · start notice not signed off · LRD24A/0882/WEB · 455 m
    • 1 Sweet Briar Lane, Kilmacud, Dún Laoghaire-Rathdown · 31 Oct 2025 · 1 homes · start notice signed off · D23A/0322 & ABP-317605-23 · 381 m
    • 6 Eden Park Drive, Dublin, Dún Laoghaire-Rathdown, D14 V3F9 · 27 Oct 2025 · short notice no sign-off needed · D24B/0242/WEB · 135 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Homes coming 114 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Mount Anville Lands——117 m
    No. 240 and Lower Kilmacud road——289 m
    Site at Kilmacud Road Upper and Drummartin Link Road4747 built (2026-Q1)380 m
    2.54 hectares——387 m
    Knockrabo——387 m
    Building 5——974 m
    approx 0.34 hectares comprising the car sales premises curre——978 m
    Vector Motors——978 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Busy Bees Childcare Hive Ltd · Crèche29 Sept 2025 · report · Tusla Early Years Inspectorate396 m
    Narnia Nursery School Ltd · Crèche1 Feb 2024 · report · Tusla Early Years Inspectorate567 m
    The Little School · Crèche21 Jan 2026 · report · Tusla Early Years Inspectorate596 m
    Ardilea Childcare Limited · Crèche31 Mar 2026 · report · Tusla Early Years Inspectorate711 m
    Little Dale Academy · Crèche12 Jan 2026 · report · Tusla Early Years Inspectorate825 m
    Narnia Nursery School · Crèche11 Nov 2025 · report · Tusla Early Years Inspectorate830 m
    Bright Minds Childcare and Montessori School Ltd · Crèche8 Apr 2026 · report · Tusla Early Years Inspectorate886 m
    Lakelands Childcare · Crèche28 Oct 2025 · report · Tusla Early Years Inspectorate911 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here272
    Council middle46
    Homes started
    Here187
    Council middle78
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    93% of homes built before 1971 (council 38%). 86% owner-occupied (council 68%).

    Homes built before 1971
    93% · council 38%
    Homes built since 2001
    2% · council 25%
    Owner-occupied
    86% · council 68%
    Rented
    8% · council 29%
    Children under 15
    25% · council 18%
    Aged 65 and over
    13% · council 17%
    Households with 2+ cars
    53% · council 39%
    Work mainly from home
    17% · council 19%
    This small area (324 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267079008

    Bus
    99 m
    Drummartin Close · 11 · busiest stop within 500 m: 4 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    428 m
    Mount Anville Secondary School, 726 pupils
    Homes sold nearby
    31
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Mount Anville Secondary School · postprimary · 726 pupils · 428 m
    • S N Cnoc Ainbhil · primary · 434 pupils · 543 m
    • St Benildus College · postprimary · 949 pupils · 660 m
    • Gaelscoil Laighean · primary · 130 pupils · 728 m
    • Goatstown Educate Together Secondary School · postprimary · 366 pupils · 728 m
    • ST Olaf's National School · primary · 591 pupils · 823 m
    • Taney NS · primary · 384 pupils · 843 m

    Stops 49

    • Drummartin Close · 11 · 4/hour at peak · 99 m
    • Drummartin Close · 11 · 3/hour at peak · 105 m
    • Eden Park Drive · 11 · 4/hour at peak · 113 m
    • Drummartin Road · 11 · 3/hour at peak · 176 m
    • Drummartin Park · 11 · 2/hour at peak · 264 m
    • Drummartin Road · 11 · 4/hour at peak · 300 m
    • Lower Kilmacud Rd · 11 · 4/hour at peak · 312 m
    • Eden Park Avenue · L25 · 4/hour at peak · 327 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Mount Anville Secondary School · 428 m+2% pupils (726) · an extension 2026, approved
    • S N Cnoc Ainbhil · 543 m-1.4% pupils (434) · an extension 2026, refused · an extension 2025, approved with conditions
    • St Benildus College · 660 m+2.6% pupils (949) · an extension 2026, no decision yet
    • Gaelscoil Laighean · 728 m+23.8% pupils (130)
    • Goatstown Educate Together Secondary School · 728 m+20.4% pupils (366)
    • ST Olaf's National School · 823 m+3.1% pupils (591)

    Council meetings 1 items

    Public land

    • Dún Laoghaire-Rathdown County Council · 0.12 ha · 73 m
    • Dublin City Council · 0.24 ha · 98 m
    • Dublin City Council · 0.2 ha · 102 m
    • Dún Laoghaire-Rathdown County Council · 0.96 ha · 105 m
    • Dublin City Council · 0.11 ha · 134 m
    • Dublin City Council · 0.35 ha · 230 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 26 Oct 2026, 01:54
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Council consultation portalsPublic26 Oct 2026, 00:55open
    Council meetings (ModernGov)Public26 Oct 2026, 01:54open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. The development will (D25A/0697/WEB) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    2. We, mr. & (D24B/0443/WEB) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    3. 114 homes approved 245 m away (Mount Anville Lands), not started: what is planned?
      Ask for: The planning file for LRD23A/0719.
      Council
    4. Application 326 m away open for comments until 10 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    5. Building work started 96 m away: for how long?
      Ask for: The planning conditions for D26A/0116/WEB.
      Agent · council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Drummartin
    Electoral division
    Dundrum-Kilmacud
    Electoral area
    Dundrum
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest D25A/0697/WEB, approved 2025, started, no sign-off needed.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 3 sites nearby could change: 1 stalled build, 1 approved scheme, 1 empty zoned plot.
    • 1 application open for comments nearby; nearest closes 10 Nov 2026.
    • 114 homes approved nearby, not started; largest 114 at Mount Anville Lands.
    • Eden Park Avenue (bus L25) 327 m away: 4 an hour at morning peak; 54 from all stops within 500 m.
    • Here (2022 census): 86% owner-occupied (council 68%); 5% of homes empty (council 6%); most built 1946–1960; 44% drive to work (council 43%); population up 7% since 2016.
    • 6 home extensions within 250 m since 2026: 5 approved (100%). Most were garage conversions.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.026 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public26 Oct 2026
    www2.courts.ie—© the publisher25 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public26 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.026 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence26 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 26 Oct 2026, 20:37 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.