Permission for development on a site of 6.7ha. The proposed development will consist of the construction of a Photovoltaic Solar development to the North of the Citywest hotel on lands formally in use as a golf course [comprising a change of use from former golf course to solar development]. The proposed development will include the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures, underground cabling and ducting, security fencing, CCTV cameras, temporary construction compound and an area of hardstanding for an electrical compound. The electrical compound will consist of two modified shipping containers, containing 3 inverters and LV Switch gear. This compound will also accommodate the Battery Energy Storage system, PV inverter and a transformer. The proposed development includes the above as well as drainage, landscaping, bio-diversity enhancement measures and all other associated site excavation, infrastructural and site development works above and below ground. While the proposed development relates to a total site area of 6.7ha, c.3.5ha of this constitutes the actual land take post development. The operational lifespan of the solar PV development will be 30 years. A Natura Impact statement (NIS) accompanies the planning application.
SD23A/0100received 5 Dec 2023decided 10 Jan 2024391 m away
Retention permission for installation of 2 no. illuminated signs to the existing building. These signs consist of the installation of 1no. sign to the front (west) elevation and 1no. sign to the (north) elevation and all associated site works.
SD23A/0232received 20 Sept 2023decided 9 Nov 2023392 m away
Change of use of part ground floor of existing office / warehouse premises to a Deli-Cafe (Delicatessen - Cafe) to include a new recessed shopfront, signage and associated alterations and modifications.
SD23A/0116received 19 Sept 2023decided 13 Oct 2023299 m away
The development will consist of a cemetery including: 8,047 No. traditional burial plots; Columbarium walls; 1 single storey reception building (214.7m2 Gross Floor Area (GFA)) comprising a reception, 1 office, 1 reception store, WC, kitchenette with photovoltaic (PV) solar panels at roof level; and the provision of an ancillary maintenance shed, bin and battery storage structures; The development includes a new vehicular access road from Garters Lane to the N7 /M7 Naas Road, with 2 vehicular access points serving the proposed cemetery; 110 car parking spaces (25 spaces to the east of the reception building and 85 within overflow car park areas to the south of the development); 8 bicycle parking stands; and all associated hard and soft landscape and boundary treatment works including the reshaping of an existing lake and provision of a footbridge; provision of SUDS measures, associated lighting, associated signage, site services (foul and surface water drainage and water supply); and all other associated site excavation, infrastructural and site development works above and below ground.
SD22A/0457received 19 Jul 2023decided 15 Aug 2023223 m away
Proposed 205sq.m of ancillary office & 242sq.m of ancillary staff facilities extension at the second floor level to the existing ancillary office located to the north-western elevations side of existing warehouse; Building elevations remain as existing due to second floor glazing being provided in previously granted planning permissions; Addition of 4 covered cycle parking to the existing covered cycle parking to facilitate the additional office / staff facilities area.
SD23A/0130received 6 Jun 2023decided 31 Jul 2023448 m away
Relocation and resizing of previously granted ancillary workshop within the facility towards the south-east, now measuring 186sq.m overall height 7.2m (Previously granted at 300sq.m and 9.7m high); Relocation of pedestrian entrance gate by 9m on the northern site boundary due to design change to accommodate site levels and access gradients; Relocated HGV wash area adjacent to repositioned workshop building and associated drainage adjustments due to relocating the workshop and HGV wash bay; 1m high gabion retaining walls to the site's southern boundary (rear) to facilitate level differences between the subject site and the neighbouring site; Provision of an on-site Well Pumphouse (4.8sq.m and 2.7m high); Provision of associated above ground Water Tank (10m x 3m x 3m, 90m3); The overall site area remains as per the previous application at 0.98ha and there is no alteration to site landscaping.
SD23A/0054received 16 Mar 2023decided 10 May 2023448 m away
Change of use from existing short term tourist accommodation units to full apartment type living accommodation units consisting of 10 two bed ground floor units and 10 two bed duplex type units at first floor level (20 units in total); also, include small elevational changes to facilitate balcony extensions at first floor level and new balcony areas at ground floor level in order to accommodate private amenity space for the individual units; omit Planning Condition 6 of Planning Ref. S01A/0051 (which links the use of units to the City West Hotel); new bicycle shelter and all associated site development works, parking, landscaping and boundary treatment works.
SD22A/0082received 7 Nov 2022decided 5 Dec 202220 units433 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 12 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
No site on the LDA register of relevant public lands within 500 m.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 12 Sept 2026, 17:56 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.