Homes here mostly date from after 2016. 1 planning file on this house, the latest from 2025. Home extensions nearby almost always get approved (94%). 21 homes approved 352 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built after 2016, with building records online. 1 planning file on this house, the latest from 2026.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2016–2021. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Taney ParkBuilt: most homes in this small area date from 2016–2021 (census estimate)most built2026: D25A/1006/WEB · full planning permission, approved2021: 1 file on Taney Park2022: 1 file on Taney Park2024: 1 file on Taney Park2025: 2 files on Taney Park2026: 1 file on Taney Park6 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    D25A/1006/WEB · full planning permission · approved 2026 · not started, runs out 2031
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas2Dundrum (incorporating Pembroke Cottages, Ballinteer Road and Main Street); Sydenham Road, Dundrum
Radon grid squares3
Protected buildings22Christ Church; Annefield
Monuments6Ecclesiastical enclosure; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, Records of Protected Structures, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 79–100% by type. A new house in a garden is harder: 58% approved, and 1 in 4 is asked for more information.

Single-storey rear120 decided · more info asked 15%
98% · council 96%
Two-storey rear47 decided · more info asked 21%
81% · council 92%
Two-storey side23 decided · more info asked 17%
100% · council 95%
Single-storey side19 decided · more info asked 21%
95% · council 96%
Attic or dormer254 decided · more info asked 15%
95% · council 94%
First-floor28 decided · more info asked 11%
79% · council 90%
Garage conversion55 decided · more info asked 16%
98% · council 99%
Porch or front14 decided · more info asked 0%
100% · council 99%
New house in a garden or site43 decided · more info asked 28%
58% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 603 nearby, 3,886 council-wide

Figure 3

Taney Park, file by file since 2021

5 of 5 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

6 planning files on Taney Park since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 3A · 2021 · rear · approved · D21A/0306No. 3 · 2022 · single-storey rear · approved · D22B/0388No number · 2024 · rear · approved · D24A/0978No. 2 · 2025 · single-storey rear · approved · D25A/1006/WEBNo. 7B · 2025 · garage conversion · approved · D25B/0585/WEBPorches, roofs, otherNew house in a side gardenNo. 3 · 2026 · new house · approved · D26A/0383/WEB3
ApprovedRefusedWithdrawn or invalid

6 files with "Taney Park" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

2 approved2 refused1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear32—
Two-storey rear202

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 7 is asked for more information, which adds about 58 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 7): 111 days; Appeal window: 4 weeks; If appealed: +134 days; Building starts: 142 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–54 (n=543)52 daysIf more info asked (1 in 7)With further information: median 111 days (n=98)111 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 134 days (n=95, all appeals within 1.5 km)+134 daysBuilding startsStart notice: median 142 days after permission (n=332)142 days after permissionSigned off407 days after the start, for the few who file. 66% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated641 decided home extensions, 333 start notices, 95 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    12 of 30 appealed refusals became permissions. 6 of 69 appealed approvals were reversed.

    Refusals appealed30 decided
    12 became permissions
    Approvals appealed69 decided
    6 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months
    • 501993 Invalid · Rosemount Hall, Rosemount Estate, Dundrum, Dublin 14, D14FP59 · 305 m
    • 501841 Pending · 3 Taney Park, Dundrum, Dublin 14, D14HW08 · 74 m
    • 501835 Pending · Eglinton Cottage, Eglinton Terrace, Dundrum, Dublin 14, D14K510 · 399 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher26 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 4

    What's changing around you?

    Street map around Taney Park with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedAppealRefusedEmpty land zoned for homesApprovedNo decision yetOther
    1. 112, Taney Road D26B/0552No decision yet · 201 m
    2. 235, Farmhill Road D26B/0519/WEBNo decision yet · 480 m
    3. 36, Larchfield D26B/0455/WEBApproved · 332 m
    4. 4Frankfort Centre, Dundrum Road D26A/0588/WEBApproved · 458 m
    5. 5Site South of Dundrum Office Park D22A/0421Approved, no sign building has started · 352 m
    6. 63 Taney Park, Dundrum 501841Appeal: no decision yet · 74 m
    7. 797, Rosemount Estate D26A/0324/WEBRefused · 121 m
    8. 80.2 ha zoned for homesEmpty land zoned for homes · 456 m
    9. 92, Taney Park D25A/1006/WEBApproved · 9 m
    10. 10Eternity House, Rosemount Park D26A/0679/WEBNo decision yet · 195 m
    11. 11National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area PC/IC/01/26No decision yet · 213 m
    12. 1211, Mount Carmel Road D26A/0510/WEBApproved · 271 m
    13. 13Annefield, Taney Road D26A/0492/WEBApproved · 273 m
    14. 144a, Rosemount Estate REF9226Section 5: exempt · 275 m
    15. 15Lower Ground Floor, Apollo Building D26A/0667/WEBNo decision yet · 286 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 99 permissions since 2016, 40 show a start notice and 5 have a completion certificate. Most owners opt out of sign-off.

    149 applications lodged within 500 m. Council: 101 approved, 20 refused. After appeals: 99 approved. Of those: 5 signed off, 24 built with the owner's opt-out, 11 started, 56 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT101: lodged → approved20: lodged → refused20: lodged → withdrawn or invalid8: lodged → undecided97: approved → approved18: refused → refused20: withdrawn or invalid → withdrawn8: undecided → undecided2 approved by the council, undecided after an appeal2 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal56: approved → no start notice found24: approved → built, owner opted out11: approved → started, not signed off5: approved → signed off3: approved → ran out149 lodged149 lodged101 approved101 approved20 refused20 refused20 withdrawn or invalid20 withdrawn or invalid8 undecided8 undecided99 approved99 approved18 refused18 refused22 withdrawn22 withdrawn10 undecided10 undecided56 no start notice found56 no start notice found24 built, owner opted out24 built, owner opted out11 started, not signed off11 started, not signed off5 signed off5 signed off3 ran out3 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured149 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    4 deadlines within 500 m; the first closes 27 Oct 2026.

    4 deadlines in the next 30 days: 2026-10-27 D26A/0588/WEB: GRANT PERMISSION — The development will consist of: (i) the amalgamation of 3 no. ground floor uni; 2026-10-30 D26B/0519/WEB: application received — The development will consist of the removal of the existing side extension and; 2026-11-04 D26B/0455/WEB: GRANT PERMISSION — The development will consist of a part single-storey, part two-storey extension; 2026-11-24 D26B/0552: application received — Removal of existing single storey lean-to roof to front and extension over this at first floor with continuation of pitctoday1 Nov6 Nov11 Nov16 Nov21 Nov26 NovD26A/0588/WEB: GRANT PERMISSION — The development will consist of: (i) the amalgamation of 3 no. ground floor uni · 458 m away · 2026-10-27D26B/0519/WEB: application received — The development will consist of the removal of the existing side extension and · 480 m away · 2026-10-30D26B/0455/WEB: GRANT PERMISSION — The development will consist of a part single-storey, part two-storey extension · 332 m away · 2026-11-04D26B/0552: application received — Removal of existing single storey lean-to roof to front and extension over this at first floor with continuation of pitc · 201 m away · 2026-11-24
    Comments closeTime to appeal ends
    • Time to appeal ends 27 Oct 2026closes today
      4D26A/0588/WEB · GRANT PERMISSION — The development will consist of: (i) the amalgamation of 3 no. ground floor uni
      €220 to An Coimisiún Pleanála (€110 observer) · 458 m away
    • Comments close 30 Oct 20263 days left
      2D26B/0519/WEB · application received — The development will consist of the removal of the existing side extension and
      €20 to the council · 480 m away
    • Time to appeal ends 4 Nov 20268 days left
      3D26B/0455/WEB · GRANT PERMISSION — The development will consist of a part single-storey, part two-storey extension
      €220 to An Coimisiún Pleanála (€110 observer) · 332 m away
    • Comments close 24 Nov 202628 days left
      1D26B/0552 · application received — Removal of existing single storey lean-to roof to front and extension over this at first floor…
      €20 to the council · 201 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    21 homes 352 m away were approved Jun 2024 with no start notice yet; the permission runs to Jun 2029.

    Site South of Dundrum… · 21 homes: 21 homes approved Jun 2024, not started2024202520262027202820292030Site South of Dundrum… · 21 homes352 m · D22A/042121 homes approved Jun 2024, not started21 homes approved Jun 2024, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 2 within 500 m

    Approved, not started 1

    Empty land zoned for homes 1

    • 80.2 ha zoned for homes · no homes built on it yet · 456 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public27 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 23 and 27 a year; busiest 2022. 83% of decisions were approvals.

    2021: 21, 2022: 27, 2023: 23, 2024: 26, 2025: 27, 2026: 2501020302021: 15 approved2021: 4 refused2021: 1 withdrawn or invalid2021: 1 undecided21’21*2022: 18 approved2022: 6 refused2022: 3 withdrawn or invalid27’222023: 17 approved2023: 2 refused2023: 4 withdrawn or invalid23’232024: 14 approved2024: 5 refused2024: 6 withdrawn or invalid2024: 1 undecided26’242025: 22 approved2025: 5 withdrawn or invalid27’252026: 15 approved2026: 3 refused2026: 1 withdrawn or invalid2026: 6 undecided25’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 37 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Building work nearby 9 in the last 12 months
    1 signed off as finished8 no sign-off needed
    • 69 Larchfield Road, Dublin 14, Dublin, D14 PK30 · 21 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D21B/0657 · 419 m
    • 56 Taney Crescent, Dublin 14, Dublin, D14 KD35 · 16 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0610/WEB · 462 m
    • 74 Taney Crescent, Dublin 14, Dún Laoghaire-Rathdown, D14 EY43 · 8 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0628 · 370 m
    • 11 Mount Carmel Road, d14, Dún Laoghaire-Rathdown, D14 CR11 · 18 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0009 · 296 m
    • Main Street, Dublin, Dún Laoghaire-Rathdown, D16 W0C0 · 20 Mar 2026 · 7-day notice signed off · 423 m
    • 23 Farmhill Drive, Roebuck, Dún Laoghaire-Rathdown, D14 KR70 · 14 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0789/WEB · 365 m
    • 103 Rosemount Estate, Dundrum, Dún Laoghaire-Rathdown, D14 YP11 · 12 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0557 · 171 m
    • 15A Main Street, Dundrum, Dún Laoghaire-Rathdown, D14 YP78 · 15 Dec 2025 · short notice no sign-off needed · D25A/0493/WEB · 491 m
    • 36 Rosemount Estate, Knockatee, Dún Laoghaire-Rathdown · 14 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D25A/0001/WEB · 231 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Homes coming 21 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Site South of Dundrum Office Park2020 not started (2026-Q2)327 m
    site 3.5335ha incorporating the old Dundrum Shopping Centre——329 m
    Sommerville House——356 m
    0.79 ha at Sommerville House——356 m
    Central Mental Hospital934934 not started (2026-Q2)414 m
    c.9.6 ha——414 m
    Frankfort Centre64no activity on site reported (2025-Q2)458 m
    c.0.9ha at No. 97A Highfield Park——513 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Dundrum Montessori School · Crèche21 Jun 2024 · report · Tusla Early Years Inspectorate615 m
    The Little School · Crèche21 Jan 2026 · report · Tusla Early Years Inspectorate778 m
    Ardtona House School · Crèche8 May 2024 · report · Tusla Early Years Inspectorate794 m
    Ruths Montessori · Crèche7 May 2025 · report · Tusla Early Years Inspectorate824 m
    Ashgrove Creche and Montessori School · Crèche5 Nov 2025 · report · Tusla Early Years Inspectorate840 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here1,175
    Council middle44
    Homes started
    Here642
    Council middle92
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    20% of homes built before 1971 (council 38%). 70% owner-occupied (council 68%).

    Homes built before 1971
    20% · council 38%
    Homes built since 2001
    44% · council 25%
    Owner-occupied
    70% · council 68%
    Rented
    26% · council 29%
    Children under 15
    22% · council 18%
    Aged 65 and over
    16% · council 17%
    Households with 2+ cars
    40% · council 39%
    Work mainly from home
    20% · council 19%
    This small area (446 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267082001

    Bus
    220 m
    Taney Park · 14, S6 · busiest stop within 500 m: 22 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    606 m
    Goatstown Educate Together Secondary School, 366 pupils
    Homes sold nearby
    52
    in 3 years, 4 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Goatstown Educate Together Secondary School · postprimary · 366 pupils · 606 m
    • Holy Cross NS · primary · 260 pupils · 615 m
    • Taney NS · primary · 384 pupils · 638 m
    • Goatstown Stillorgan Primary School · primary · 170 pupils · 639 m
    • Gaelscoil na Fuinseoige · primary · 441 pupils · 707 m
    • Our Lady's Grove Secondary School · postprimary · 295 pupils · 871 m
    • Our lady's Grove Primary School · primary · 409 pupils · 905 m

    Stops 53

    • Taney Park · 14, S6 · 10/hour at peak · 220 m
    • Taney Park · S6 · 4/hour at peak · 228 m
    • Taney Road · 44, 44D · 1/hour at peak · 270 m
    • Dundrum · Green · 19/hour at peak · 283 m
    • Dundrum · Green · 22/hour at peak · 292 m
    • Dundrum Luas · 14, 44D, 46n · 6/hour at peak · 316 m
    • Dundrum Luas · 74, 750 · 3/hour at peak · 322 m
    • Rosemount Estate · 44, 44D · 1/hour at peak · 327 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Goatstown Educate Together Secondary School · 606 m+20.4% pupils (366)
    • Holy Cross NS · 615 m-3.7% pupils (260)
    • Taney NS · 638 m-1.3% pupils (384)
    • Goatstown Stillorgan Primary School · 639 m+20.6% pupils (170)
    • Gaelscoil na Fuinseoige · 707 m+3.5% pupils (441)
    • Our Lady's Grove Secondary School · 871 m-5.4% pupils (295) · an extension 2026, refused

    Council meetings 1 items

    Public land

    • Dublin City Council · 0.5 ha · 56 m
    • Dublin City Council · 0.1 ha · 124 m
    • Dublin City Council · 0.83 ha · 192 m
    • Dublin City Council · 2.28 ha · 236 m
    • Railway Procurement Agency · 0.12 ha · 239 m
    • Dublin City Council · 0.12 ha · 250 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 27 Oct 2026, 01:57
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Council consultation portalsPublic27 Oct 2026, 00:57open
    Council meetings (ModernGov)Public27 Oct 2026, 01:57open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Full planning permission (D25A/1006/WEB) approved 2026, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. Application 201 m away open for comments until 24 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Dundrum
    Electoral division
    Dundrum-Taney
    Electoral area
    Dundrum
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest D25A/1006/WEB, approved 2026, not started, runs out 2031.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 2 sites nearby could change: 1 approved scheme, 1 empty zoned plot.
    • 2 applications open for comments nearby; nearest closes 24 Nov 2026.
    • 21 homes approved nearby, not started; largest 21 at Site South of Dundrum Office Park.
    • Dundrum (Luas Green) 292 m away: 22 an hour at morning peak; 106 from all stops within 500 m.
    • Here (2022 census): 70% owner-occupied (council 68%); 7% of homes empty (council 6%); most built 2016 or later; 34% drive to work (council 43%); population up 10% since 2016.
    • 5 home extensions within 250 m since 2025. Most were single-storey rear extensions. 2 two-storey rear extensions refused.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.027 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public27 Oct 2026
    www2.courts.ie—© the publisher26 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public27 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.027 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence27 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 27 Oct 2026, 21:37 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.