To erect photovoltaic panels on a ground mounted system with a 7.37 MWp on 35,243.81 sqm of the land located to the south of the existing Roadstone quarry facility, Cookstown Road, Dublin 24, D24 PKK2. The electricity generated will be used by the Roadstone site. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; using all temporary ways and temporary construction compound / set-down area provided by Roadstone Limited
SD24A/0134Wreceived 8 Nov 2024decided 28 Nov 2024106 m away
The development will consist of a new enclosed HVO generator (75.6 sq.metres) with bunded transformer and fuel storage tank (double-skinned with leak detection system) on a concrete plinth all within an application area of 310 sq.metres at the existing quarry. The development is a revision to the HVO generator scheme permitted under planning ref. SD23A/0343.
SD24A/0183Wreceived 19 Jul 2024decided 12 Sept 2024423 m away
New storage and maintenance shed (780sq.m); An extension to the existing laboratory (281 sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.
SD23A/0343received 10 Apr 2024decided 3 May 2024141 m away
The development within an area of 4.1 hectares will comprise of: A new concrete plant (7,271 sq metres), comprising enclosed mixing units, 16 no. cement silos (c. 23 metres height), enclosed aggregate storage bins (c. 16.5 metres height), feed conveyor systems, & 2 no. control rooms; a replacement truck wash out facility (1,237 sq. metres); and related ancillary works within a 4.2 hectare application area at the existing quarry. The new concrete plant will replace the three existing concrete plants on site, all of which will be decommissioned upon commencement of operation of the new plant.
SD23A/0265received 18 Oct 2023decided 11 Dec 20230 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 1 record from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
South Dublin County Council — Dublin city and suburbs
0.16 hafolio DN183654F359 m awayas of 1 Jul 2023
South Dublin County Council — Dublin city and suburbs
0.61 hafolio DN183654F407 m awayas of 1 Jul 2023
South Dublin County Council — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 14:27 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.