PlanningRegister.ie
Planning report · Kildare County Council · 2000 m around the house · the last 12 months · 12 Oct 2026, 12:16

L5076

53.29618, -6.70821

Homes here mostly date from the 1980s. Home extensions nearby almost always get approved (91%). A building site 1.7 km away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 11 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of ClaneBuilt: most homes in this small area date from 1981–1990 (census estimate)most built2017: 2 files on Clane2018: 3 files on Clane2019: 3 files on Clane2020: 3 files on Clane2021: 6 files on Clane2022: 3 files on Clane2023: 2 files on Clane2024: 1 file on Clane2025: 3 files on Clane26 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings10outbuilding; The Old Barracks
Radon grid squares1
Monuments62Moated site; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: zoning, constraints.radon, rzlt, constraints, constraints.niah, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 12 Oct 2026, 00:09
SourceLicenceFetchedLink
bcmsCC-BY-4.012 Oct 2026, 00:09open
npadCC-BY-4.012 Oct 2026, 01:44open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 80–100% by type. A new house in a garden is harder: 56% approved, and 1 in 3 is asked for more information.

Single-storey rear18 decided · more info asked 6%
100% · council 98%
Attic or dormer20 decided · more info asked 45%
80% · council 87%
New house in a garden or site48 decided · more info asked 31%
56% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 86 nearby, 4,196 council-wide

Figure 3

Clane, file by file since 2017

13 of 14 decided extensions on the road were approved. New houses in side gardens or on sites: 4 of 9.

26 planning files on Clane since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2017 · single-storey rear · approved · 17486No number · 2018 · single-storey side · approved · 181041No number · 2018 · other extension · approved · 181068No number · 2019 · attic conversion / dormer · approved · 191047No number · 2020 · other extension · approved · 201027No number · 2021 · garden room · refused · 211160No. 18 · 2021 · attic conversion / dormer · approved · 211633No. 22 · 2021 · single-storey rear · approved · 21531No. 8 · 2021 · attic conversion / dormer · approved · 21563No number · 2022 · other extension · approved · 221172No number · 2022 · attic conversion / dormer · approved · 221221No number · 2023 · other extension · approved · 2360082No number · 2024 · single-storey rear · approved · 2460614No. 18 · 2025 · other extension · approved · 2560075Porches, roofs, otherNo number · 2018 · other work · approved · 18682No number · 2019 · other extension · approved · 19422No number · 2020 · other work · approved · 201213New house in a side gardenNo number · 2017 · new house · approved · 171417No number · 2019 · new house · approved · 19205No number · 2020 · new house · refused · 201539No number · 2021 · new house · refused · 211629No number · 2021 · new house · refused · 211645No number · 2022 · new house · refused · 22269No number · 2023 · new house · refused · 2360196No number · 2025 · new house · approved · 2560021No number · 2025 · new house · approved · 2560094
ApprovedRefusedWithdrawn or invalid

26 files with "Clane" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 12 Oct 2026, 01:44
    SourceLicenceFetchedLink
    npadCC-BY-4.012 Oct 2026, 01:44open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 3 is asked for more information, which adds about 74 days. Building starts about 11 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 3): 125 days; Appeal window: 4 weeks; Building starts: 335 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 mo21 mo24 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–54 (n=54)52 daysIf more info asked (1 in 3)With further information: median 125 days (n=23)125 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 335 days after permission (n=13)335 days after permissionSigned off77% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated77 decided home extensions, 13 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 2 appealed refusals became permissions. 0 of 4 appealed approvals were reversed.

    Refusals appealed2 decided
    0 became permissions
    Approvals appealed4 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500797 Granted with conditions · Abbeylands Shopping Centre,, Westgrove Hotel & Conference Centre,… · 1.9 km
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved12 Oct 2026, 01:27open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 4

    What's changing around you?

    Street map around L5076 with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingBuilding site that stoppedApproved, not startedApprovedNo decision yet
    1. 116 Clonwood Heights, Clane 2661065No decision yet · 605 m
    2. 2Philip McCormack Plant Ltd, Clane Business Park 2661022No decision yet · 1.2 km
    3. 3Choice Clane, Dublin Road 2661013No decision yet · 1.6 km
    4. 448 Oatfield Park, Clane 2660695Approved with conditions · 1.0 km
    5. 5Ballinagappa Road, Clane 18938Building site that stopped · 773 m
    6. 6Lands to North of Scoil Mhuire, Clane 08/1658Building site that stopped · 795 m
    7. 7Aughamore, Kilcock Road 15/193Building site that stopped · 1.1 km
    8. 8Prosperous Road 24245Approved, no sign building has started · 1.4 km
    9. 9Millicent Road, Clane 21561Building site that stopped · 1.5 km
    10. 10Capdoo 24140Approved, no sign building has started · 1.6 km
    11. 11Capdoo 19304632Approved, no sign building has started · 1.6 km
    12. 12Sallins Road 2660636Approved, no sign building has started · 1.7 km
    13. 13Capdoo, Clane ABP-304632-19Building site that stopped · 1.7 km
    14. 14Loughanure Commons, Clane 2660235Approved with conditions · 608 m
    15. 15Loughanure Commons, Clane 2660956No decision yet · 710 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 9 permissions since 2016, 2 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    13 applications lodged within 500 m. Council: 9 approved, 4 refused. After appeals: 9 approved. Of those: 0 signed off, 2 built with the owner's opt-out, 0 started, 2 with no start notice found, 5 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT9: lodged → approved4: lodged → refused9: approved → approved4: refused → refused2: approved → no start notice found2: approved → built, owner opted out5: approved → ran out13 lodged13 lodged9 approved9 approved4 refused4 refused9 approved9 approved4 refused4 refused2 no start notice found2 no start notice found2 built, owner opted out2 built, owner opted out5 ran out5 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured13 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    4 deadlines within 2.0 km; the first closes 16 Oct 2026.

    4 deadlines in the next 30 days: 2026-10-16 2661013: application received — A) Demolition of ground floor storage room walls to allow for change of use of storage space to retail space providing a; 2026-10-19 2661022: application received — to erect a 24m high lattice support structure together with antennae, dishes and associated telecommunications equipment; 2026-10-21 2660695: CONDITIONAL — (A) Demolition of existing single storey lean to projection to the Rear (east) elevation, (B) Permission for a new sing; 2026-10-29 2661065: application received — The development consists of retention planning permission for a 24sqm single storey detached garden cabin providing a notoday17 Oct22 Oct27 Oct1 Nov6 Nov11 Nov2661013: application received — A) Demolition of ground floor storage room walls to allow for change of use of storage space to retail space providing a · 1.6 km away · 2026-10-162661022: application received — to erect a 24m high lattice support structure together with antennae, dishes and associated telecommunications equipment · 1.2 km away · 2026-10-192660695: CONDITIONAL — (A) Demolition of existing single storey lean to projection to the Rear (east) elevation, (B) Permission for a new sing · 1 km away · 2026-10-212661065: application received — The development consists of retention planning permission for a 24sqm single storey detached garden cabin providing a no · 605 m away · 2026-10-29
    Comments closeTime to appeal ends
    • Comments close 16 Oct 20264 days left
      32661013 · application received — A) Demolition of ground floor storage room walls to allow for change of use of storage space to…
      €20 to the council · 1.6 km away
    • Comments close 19 Oct 20267 days left
      22661022 · application received — to erect a 24m high lattice support structure together with antennae, dishes and associated…
      €20 to the council · 1.2 km away
    • Time to appeal ends 21 Oct 20269 days left
      42660695 · CONDITIONAL — (A) Demolition of existing single storey lean to projection to the Rear (east) elevation, (B) Permission…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.0 km away
    • Comments close 29 Oct 202617 days left
      12661065 · application received — The development consists of retention planning permission for a 24sqm single storey detached…
      €20 to the council · 605 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    268 homes 1.6 km away were approved Oct 2019 with no start notice yet; the permission runs to Jan 2030. 5 building sites nearby stopped before sign-off.

    Capdoo, Clane · 366 homes: 366 homes, started Mar 2023, never signed off; Capdoo · 268 homes: 268 homes approved Oct 2019, not started; Millicent Road, Clane · 192 homes: 192 homes, started Jan 2022, never signed off; Lands to North of Scoil… · 90 homes: 90 homes, started Oct 2018, never signed off2018201920202021202220232024202520262027202820292030Capdoo, Clane · 366 homes1.7 km · ABP-304632-19366 homes, started Mar 2023, never signed off366 homes, started Mar 2023, never signed offCapdoo · 268 homes1.6 km · 19304632268 homes approved Oct 2019, not started268 homes approved Oct 2019, not startedMillicent Road, Clane · 192 homes1.5 km · 21561192 homes, started Jan 2022, never signed off192 homes, started Jan 2022, never signed offLands to North of Scoil… · 90 homes795 m · 08/165890 homes, started Oct 2018, never signed off90 homes, started Oct 2018, never signed offtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 9 within 2.0 km

    Building site that stopped 5

    Approved, not started 4

    • Prosperous Road · 50 homes approved Oct 2024, not started · 1.4 km
    • Capdoo · 14 homes approved Jul 2024, not started · 1.6 km
    • Capdoo · 268 homes approved Oct 2019, not started · 1.6 km
    • Sallins Road · 20 homes approved Sep 2026, not started · 1.7 km

    Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

    Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    derelictCC-BY-4.05 Oct 2026, 09:35open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Figure 9

    Applications within 500 m, by year

    Between 1 and 2 a year; busiest 2019. 69% of decisions were approvals.

    2017: 2, 2018: 1, 2019: 2, 2020: 2, 2021: 2, 2022: 2, 2023: 1, 2024: 105102017: 2 approved2’17*2018: 1 approved1’182019: 2 approved2’192020: 2 approved2’202021: 2 refused2’212022: 1 approved2022: 1 refused2’222023: 1 refused1’232024: 1 approved1’24
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 43 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 12 Oct 2026, 01:44
    SourceLicenceFetchedLink
    npadCC-BY-4.012 Oct 2026, 01:44open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    Building work nearby 19 in the last 12 months
    4 not signed off15 no sign-off needed
    • 85 Brooklands, Clane, Kildare, W91 P043 · 28 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 26/60274 · 2.0 km
    • Abbeyview, Clane, Kildare, W91 X8X9 · 10 Aug 2026 · 19 homes · start notice not signed off · 24/60485 · 1.7 km
    • Prosperous Road, Clane, Kildare · 7 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60663 · 746 m
    • 1 Churchfield, Clane, Kildare, W91 N602 · 22 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60879 · 1.8 km
    • Ballinagappa Road, Clane, Kildare · 15 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2560094 · 621 m
    • Loughanure, Clane, Kildare · 15 Jul 2026 · short notice no sign-off needed · 2660235 · 622 m
    • Longtown North, Killybegs Denesne, Kildare · 10 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2560902 · 1.7 km
    • 7 Otomy Drive, Clane, Kildare, W91 D4V9 · 18 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 2660199 · 1.2 km
    • Main Street, Clane, Kildare, W91 X860 · 2 Jun 2026 · start notice not signed off · P8202301 · 1.6 km
    • 27 Esmonde Avenue, Clane, Kildare, W91 K638 · 26 May 2026 · start notice, opted out no sign-off needed · 2561081 · 897 m
    • 2 The Stream, Main St, Clane, Kildare · 27 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 24/358 · 1.7 km
    • Firmount East, Clane, Kildare, W91 A6W2 · 10 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 22580 · 1.6 km
    • 18 The Meadows, Clane, Kildare, W91 AY68 · 26 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 2172 · 728 m
    • Prosperous Road, Butterstream, Kildare, W91 W535 · 24 Mar 2026 · start notice not signed off · 25/60386 · 831 m
    • 11 Alexandra Manor, Clane, Kildare, W91 N2E7 · 23 Mar 2026 · 7-day notice not signed off · 2560561 · 2.0 km
    • Ballynagappagh, Clane, Kildare · 16 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 24/61312 · 859 m
    • Anner Lodge, Firmount West,, Clane, Kildare, W91V9W7 · 2 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 2460011 · 768 m
    • Butterstream, Kildare, W91 ---- · 5 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 2560021 · 534 m
    • Liffey Lawns, Clane, Kildare, W91 XTR0 · 26 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 2560498 · 1.4 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 12 Oct 2026, 00:09
    SourceLicenceFetchedLink
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    Homes coming 352 not started
    • 11Capdoo · 268 homes · not started · runs out 4 Jan 2030 · 1.6 km
    • 8Prosperous Road · 50 homes · not started · runs out 22 Oct 2029 · 1.4 km
    • Scoil Mhuire · 46 homes · ran out · runs out 25 Apr 2019 · 705 m
    • Aughamore · 36 homes · building started · 1.0 km
    • Scoil Mhuire · 29 homes · building started · 759 m
    • 12Sallins Road · 20 homes · not started · runs out 3 Nov 2029 · 1.7 km
    • Aughamore · 18 homes · building started · 1.1 km
    • Aughamore · 18 homes · building started · 931 m
    • Sites 55-72 Aughamore · 18 homes · ran out · runs out 28 Aug 2022 · 1.0 km
    • Sallins Road · 17 homes · building started · 1.7 km
    • Cois Abhainn · 16 homes · building started · 2.0 km
    • 10Capdoo · 14 homes · not started · runs out 29 Jul 2029 · 1.6 km
    • Ballinagappa Road · 12 homes · building started · 1.4 km
    • Ballynagappagh · 12 homes · ran out · runs out 15 Jul 2025 · 739 m
    • Hemingway Park · 10 homes · building started · 1.6 km
    • Ballinagappa Road · 10 homes · building started · 844 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Early Days Creche and Daycare · Crèche27 Mar 2024 · report · Tusla Early Years Inspectorate660 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: schools, tusla_ey · fetched 27 Sept 2026, 23:32
    SourceLicenceFetchedLink
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area Busier than most of Kildare County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here14
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    88% owner-occupied (council 71%).

    Homes built before 1971
    17% · council 16%
    Homes built since 2001
    27% · council 40%
    Owner-occupied
    88% · council 71%
    Rented
    6% · council 24%
    Children under 15
    22% · council 22%
    Aged 65 and over
    16% · council 12%
    Households with 2+ cars
    71% · council 51%
    Work mainly from home
    17% · council 12%
    This small area (534 people)Kildare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087025004

    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Nearest school
    819 m
    Scoil Mhuire Community School, 1189 pupils
    Homes sold nearby
    216
    in 3 years, 132 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Scoil Mhuire Community School · postprimary · 1189 pupils · 819 m
    • St Patricks Bns · primary · 488 pupils · 1.0 km
    • Scoil Naisiunta Bhride · primary · 480 pupils · 1.1 km

    Stops 17

      Schools growing or shrinking planning in 3 years · pupils last year

      • Scoil Mhuire Community School · 819 m+0.5% pupils (1,189) · 5 classrooms 2025, approved with conditions

      Open consultations

      Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
      SourceLicenceFetchedLink
      gtfsCC-BY-4.011 Oct 2026, 23:43open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      npadCC-BY-4.012 Oct 2026, 01:44open
      consultpublic12 Oct 2026, 01:26open
      moderngovpublic12 Oct 2026, 01:27open
      lda_landsCC-BY-4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. High radon area (1 in 10 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      2. Application 605 m away open for comments until 29 Oct 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Clane
      Electoral division
      Clane
      Electoral area
      Clane
      Council
      Kildare County Council
      Everything we found, as a list 8 lines
      • Not protected; no vacant land tax; high radon area.
      • 9 sites nearby could change: 5 stalled builds, 4 approved schemes.
      • 3 applications open for comments nearby; nearest closes 29 Oct 2026.
      • 352 homes approved nearby, not started; largest 268 at Capdoo.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 88% owner-occupied (council 71%); 8% of homes empty (council 5%); most built 1981–1990; 61% drive to work (council 61%); population up 10% since 2016.
      • Around here the council decides in a median 71 days (about 10 weeks); 51% are asked for more information.
      • 43 applications nearby in the last 12 months; 83% approved (council 80%); 30% for work already built (council 25%).
      What the terms mean 9 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
      Sources and licences 29
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.011 Oct 2026
      data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
      dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public12 Oct 2026
      www2.courts.ie—all-rights-reserved12 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
      transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
      lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)public12 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.012 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…12 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
      gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
      gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
      water.ie—all-rights-reserved (water.ie terms cl… · flag only—
      water.ie—all-rights-reserved (water.ie terms cl… · flag only—
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 12 Oct 2026, 12:16 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.