Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.
What closes soonest 1 open window
Observations close 25 Sept 202613 days left
SD26A/0202W — application received — Construction of a single storey ground floor detached auxiliary dwelling with one bedroom a kitchen a living room and ba
5 weeks from receipt (21 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 264 m away
R2 — Existing residentialsouth dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028
RES: To protect and/or improve residential amenity
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
This site is on an RZLT map — the draft map 2027 and the final map 2026 (0.02 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
Construction of a single storey ground floor detached auxiliary dwelling with one bedroom a kitchen a living room and bathroom in the rear garden of the principal house together with connection to all public services and all associated site development works.
New pedestrian side access gate to the rear garden and the construction of a single-storey mono-pitch front porch extension with relocation of the existing front entrance door.
SD26B/0305Wreceived 19 Jun 2026decided 7 Aug 2026366 m away
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout.
Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
SD26A/0046Wreceived 19 Feb 2026decided 14 Apr 2026341 m away
Installation of approximately 6121 sq. of Photo-Voltaic Solar Panels onto the existing warehouse roof. The solar panels will be used to create green electricity, all of which will be used by the building.
SD26A/0008Wreceived 13 Jan 2026decided 26 Jan 2026261 m away
Retention of existing timber fence to the front, and two internal boundary walls within the front and side garden, each incorporating a pedestrian gate. Retention of pitched-roof shed to the rear of the property. Permission for a new front vehicular access with dropped kerb, including partial removal of the existing front boundary wall. Infill of existing open-walled front porch to provide new front entrance door.
SD25B/0638Wreceived 7 Nov 2025decided 12 Jan 2026410 m away
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.
SD25A/0144Wreceived 24 Sept 2025decided 21 Oct 2025484 m away
We, KAVCO C TOWN PROJECT LIMITED, intend to apply for planning permission for the proposed development at the site, Cookstown House, Cookstown Way, Tallaght, Dublin 24. The proposed development consists of the following: modifications of the previously approved application SDCC Reg. Ref. SD23A/0237. The proposed modifications include a revised Ground-floor layout to convert the previous commercial unit, the adjacent refuse store and part of the previous communal amenity space into an additional 6 no. residential units as follows; 1 no. studio unit, 3 no. one-bedroom units and 2 no. two-bedroom units. The proposed changes will increase the total number of apartments from 80 no. units to 86 no. units. A recessed balcony has been provided to each of the proposed apartments. Minor modifications are to be made to the elevations at ground floor level only. There are no changes proposed to the height of the building. All with associated site works, bin and bicycle storage.
SD25A/0207Wreceived 29 Aug 2025decided 23 Oct 2025313 m away
Demolition of 29.5m2 loading bay and removal of 3 no. storage containers and ancillary 5 no. storage tanks with extension of 394m2 9.0m high warehouse extension with 2 no. roller shutters with internal layout changes for installation of new energy efficient and sustainable equipment to existing commercial laundry with 7 no. new car parking spaces, 24 no. new bicycle spaces in secure standalone shelter with new delivery and loading area covered with new canopy and revised internal vehicular routes while retaining existing entrances to Second Avenue with ancillary site and development works.
SD24A/0215Wreceived 20 Jan 2025decided 17 Feb 2025364 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
310 THE CRESCENT, BELGARD HEIGHTS, TALLAGHT DUBLIN 24
16 Dec 2024
€520,000
—
—
—
—
—
—
182 m
7 ALPINE RISE, BELGARD, TALLAGHT DUBLIN 24
18 Sept 2024
€420,000
—
—
—
—
—
—
272 m
64 THE HEATH, BELGARD HEIGHTS, DUBLIN 24
6 Sept 2024
€435,000
—
—
—
—
—
—
456 m
2 CAIRNWOOD COURT, BELGARD, TALLAGHT DUBLIN 24
5 Sept 2024
€375,000
—
—
—
—
—
—
403 m
62 AMBERVALE, TALLAGHT, DUBLIN 24
22 Jul 2024
€345,000
—
—
—
—
—
—
441 m
11 CAIRNWOOD COURT, TALLAGHT, DUBLIN 24
17 Jul 2024
€340,000
—
—
—
—
—
—
462 m
32 ALPINE RISE, BELGARD ROAD, TALLAGHT
26 Jun 2024
€335,000
—
—
—
—
—
—
203 m
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 16 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Dublin City Council — Dublin city and suburbs
1.35 hafolio DN23088F15 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.6 hafolio DN23088F38 m awayas of 1 Apr 2023
Irish Water — Dublin city and suburbs
2.89 hafolio DN213606F67 m awayas of 1 Apr 2023
Irish Water — Dublin city and suburbs
1.44 hafolio DN213606F81 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.23 hafolio DN18548N107 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.15 hafolio DN18548N116 m awayas of 1 Apr 2023
South Dublin County Council — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 12 Sept 2026, 23:46 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.